RFC - 4200 109 002 Pem PVC B 031a - 0
RFC - 4200 109 002 Pem PVC B 031a - 0
Cc : NKALITA@BHEL.IN
Comments : Drawings / Documents are being submitted to NTPC for information. Contractor/Vendor
hereby confirms full compliance to all the specified requirements of the contract
specification, without and deviation, whatsoever. In case during the tenure of the contract, it is
observed/found that the data/ information in the released Drawing/document is not meeting
the contract specification, Contractor/vendor will modify/ rectify/replace the Equipments/
System/Utilities to meet the specification without any commercial implication or any time
extension to NTPC in this regard
4200-109-002-PEM-PVC-B-031A/00/CATREL/Page: 1 of 3
“We confirm that this document meets all the contract requirements including safety and
statuary requirements and facilitate ease of operation and maintenance. In case any
deviation is found, the Contractor shall carry out all required changes/ modifications
without any cost implications to NTPC. In addition, Penalty on account of non-
compliance of contract specification as deemed fit by the Employer shall be recovered”
4200-109-002-PEM-PVC-B-031A/00/CATREL/Page: 2 of 3
Digitally signed
by Sachin Jain
DN: cn=Sachin
Jain, o=BHEL,
ou=PS-PEM
NOIDA,
email=sachinjai
n@bhel.in, c=IN
Date:
2023.10.19
17:04:58 +05'30'