Endurance Hydraulic Screen® - Gravel Pack Replacement Systems

Endurance Hydraulic Screen®


 PUMP FREE Installation
 360º Wellbore Support Without the additional logistics, complexity
and risks associated with GRAVEL PACKS.
 Sand Control and Flow Control

© Copyright Darcy 2015, CONFIDENTIAL 2


Endurance Hydraulic Screen®

RUN IN HOLE ACTIVATED

Protective Shroud Extends


Protective Outer Shroud
Sand Filter Media Overlaps

Activation Chambers Drainage / Support Layers


SURFACE
Bridge Flow Channels
Sand Filter Media
APPLIED Activation Chambers
Drainage / Support Layers TUBING Energised
PRESSURE Production Flow Channels
Open
Base Pipe
No Yielding of Base Pipe

Activation / Production Valve

Screen

© Copyright Darcy 2015, CONFIDENTIAL 3


Darcy Difference
The Darcy Difference

COMPLETION STRENGTH AND CONTROL

 Positive Wellbore support preventing mobilisation of problematic sands, shales, coals etc.
 Mechanical strength and collapse resistance for high geo-mechanical loads and extreme conditions
 Conform to the borehole whilst maintaining base pipe geometry
 Premium sand control combined with ICD capability and zonal isolation
 Selective production, injection and shutoff with maximum ID Independent ISO Collapse Testing achieving 6,000psi and
Mechanical Crush Testing beyond API base pipe ratings

OPERATIONAL EFFICIENCY

 Minimise exposure to operational complexity, risk and cost


 Eliminate specialist pumping crews or additional downhole tools
 Easy integration with standard completion equipment
 Realise logistical savings on transportation, boats, helicopter, deck and bed space
 Environmentally neutral, no pumping equipment or fluid disposal

Integration to standard completion equipment and rig practices

Control,
Wellbore
Run in Activation Selectivity and
Support
Shut off
© Copyright Darcy 2015, CONFIDENTIAL 5
Endurance Hydraulic Screen® - Operational Efficiency (versus Gravel Pack)
MOBILISATION INSTALLATION & OPERATION

Mobilise and Rig-up pumps, Circulate Reverse Out-


GRAVEL PACK lay-down Gravel Filtration & Completion Pump Gravel Gravel
Mobilise crew
PROCESS & Pack pumping Completion Fluids & Pack Returns to Tote
REQUIREMENTS equipment Equipment Chemicals Tanks

 13 Gravel  1 x large work boat,  Filter equipment,  Chemicals, gels,  Gravel pack  Tote tanks
pack crew or elements gravel lab chemicals and
 1.5 helicopter  1 x specialised  Diatomaceous equipment fluids
trips vessel / spread with earth  Completion brine
large deck space  Laboratory  Boat to back load
mud

Make up, Set


DARCY Circulate Well & Packer – Pull Out of Hole
Mobilise Crew & Run Upper
PROCESS & Trip out Pipe Pressure Up to
Completion
REQUIREMENTS set DARCY
Screen

 2 Darcy personnel  Rig-based equipment  Rig-based equipment


 2 packer running tool personnel
Note: Comparison described is for illustration only – job specific details may vary

© Copyright Darcy 2015, CONFIDENTIAL 6


Explore New Possibilities

Our environmentally neutral system lends itself to even the most remote or sensitive locations

Mature & low pressure reservoirs Injector wells


Endurance hydraulic screen is the ideal solution Maintain borehole support and near wellbore
when, in a low bottom hole pressure environment, stability throughout injection and shut-in. Protect
circulating a gravel pack is not an option. injection performance by effective placement of
filter cake treatment before screen activation.
Zonal selectivity and ease of well intervention for
added assurance.

HPHT
Horizontal & Multi-lateral wells
Stimulate the filter cake ahead of activation and
benefit from completion strength that is not subject Complete more complex wells with greater
to mechanical failure when the reservoir is depleted ease and less risk, when gravel packing isn’t an
over time. option.

Deep water and Shallow Reservoirs Heavy Oil applications


Eliminate the time and complexity of gravel packing, Benefit from completion strength, preventing the
removing pumping operations in wells with small loss of sand integrity when greater drawdown
pore pressure / fracture gradient window. loadings occur when extracting hydrocarbons with
high viscosities, especially under ESP conditions.

© Copyright Darcy 2015, CONFIDENTIAL 7


6 5/8” Endurance100® Hydraulic Screen - Activation Sequence
6 5/8” Endurance100® Hydraulic Screen - Technical Illustration

© Copyright Darcy 2015, CONFIDENTIAL 9


6 5/8” Endurance100® Hydraulic Screen, Statoil (Statfjord – May & Aug 2015)
Statoil (Statfjord) – Successful ‘Industry First’ Hydraulic Screen Installations
APPLICATION TYPE: Mature & Low Pressure Reservoir
THE CHALLENGE: Continuous pressure depletion, reduced margins for pumping Open Hole Gravel Packs

Setting Tool

1. RUN IN to setting depth Liner Hanger

2. SET LINER HANGER and release R/T Washpipe

1 hr Rig Time 3. ACTIVATE HYDRAULIC SCREENS with surface applied pressure Reservoir
Isolation Shifting Tool
Valve

4. OPEN HYDRAULIC SCREENS to production (on bleed off)


Blank Pipe

5. SET PACKER & CLOSE RIB. Pressure test barriers


Darcy
Hydraulic
Screen

VALUE & BENEFITS:


 OPERATIONAL EFFICIENCY Simple Completion Design, Operations and Equipment / Logistics removed Darcy
Hydraulic
 MINIMAL PERSONNEL 2 man crew, de-mobilised 8 hours after screen activation Screen

 TIME & COST SAVINGS Approx. 30% reduction to overall completion timings on first 2 ‘Darcy’ wells
Bull Nose

© Copyright Darcy 2015, CONFIDENTIAL 11


Exceeding Client Expectations
“…Darcy and Statoil both recognise this as a major milestone and industry first, using Hydraulic Screen technology as the primary sand control
system in a low bottom-hole pressure and logistically challenged environment…”
Press Release, post Darcy installation success May 2015

“…The Darcy crew displayed above standard dedication to the performed operations, not only wrt. their own equipment but also providing advice,
support and QC-checks for other third party suppliers….”
“…Proactive and hands-on DARCY representatives onshore during whole detailed planning phase (from January to May), and also during
execution phase……Quick response on mail and actions from meetings…Cost estimate, risks and suggested improvements to DOP`s and
operation was provided according to deadline set...Very good work...”
Statoil D&W Engineers, May 2015

“…Overall Darcy have been available at all times and more than willingly to help, assist, explain and cooperate in the planning phase….Statoil is
very pleased with the work performed both on- and offshore, during planning, execution as post job analysis/AAR…”
Statoil D&W Engineer, Sept 2015

“…[Well] came in 7 days sharp, 3,2 days (or roughly 31%) below budget, with 7 ea. Darcy screens installed. This makes [Well] the 2nd fastest
completion in [license] history (after [well], the first Darcy well),and sets a new benchmark for what can be achieved…”
Statoil D&W Engineer, Sept 2015

© Copyright Darcy 2015, CONFIDENTIAL 12


Screen Products and Technology Status
Endurance Hydraulic Screen® - Product Range

 Positive wellbore support in one simple step. Eliminate gravel packing without the need for additional downhole tools.
 Systems selected on solid or pre-drilled base pipe platforms
 Integral valve arrangement to deliver desired level of functionality

PRODUCT NAME AND DESCRIPTION SCREEN CONFIGURATION

Endurance 100® Screen


Screen
Activation /Production
Activation /Valve
Production Valve
Full radial wellbore contact eliminating the complexity of
pumping a gravel pack.

Endurance 200® Screen


Screen
Activation /Production
Activation /Valve
Production Valve w/ Shut Off
Adds capability for selective production / injection, inflow
control and shut off.

Endurance 300® Screen


Screen
Perforated Basepipe Activation
ActivationValve
Valve
Extreme environment system for HPHT, High Flowrate or
Direct Sand Face access.
(Pre-drilled base pipe option illustrated)

© Copyright Darcy 2015, CONFIDENTIAL 14


Endurance Hydraulic Screen® - Technology Status

BASE SCREEN OPEN HOLE ACTIVATION


CURRENT SIZE STATUS
PIPE OD SIZE RANGE (MAX)

Endurance100® 6 5 /8 ” Solid 7.750” 8.500” 10.000” Commercial

4” Solid 5.000” 6.000” 6.750” Concept Phase

Endurance200® 5 ½” Solid 7.125” 8.500” 9.250” Under development

Under development
Endurance300® 5” Pre-drilled 6.625” 7.250” 8.000” Client Funded Development
Project

Note: additional size options are available for each Endurance Series

© Copyright Darcy 2015, CONFIDENTIAL 15


Product Development - 5” Endurance300® Hydraulic Screen
 Development project for a major European multinational oil & gas
Screen
company, Deepwater Gulf of Mexico Perforated Basepipe Activation Valve

 5” base pipe, 7.250” open hole


 Harsh environment 5 ½ Endurance300® for harsh environment

 High flow rate per screen


 High depletion scenarios

Additional Functional Considerations


 Flexibility for pre-drilled and solid base pipe options
 Maximise flow area in activated and un-activated states
 Activation valve design provides option for integration with isolation string Prototype Testing

 Easy integration with tracer technology


© Copyright Darcy 2015, CONFIDENTIAL 16
Product Qualification and Testing
Product Qualification - Endurance Hydraulic Screen®

Darcy’s Facility Aberdeen, UK Library of Component Test Screen Prototypes Screen Manufacture
Samples

 Strict iterative process, fully traced from proof of concept design


 Detailed individual component and final full-scale system qualification
 All tests data logged and video captured
 1750 product component tests, fabrication of 150 full test samples
 Test samples retained at Darcy’s facility in Aberdeen, UK.

© Copyright Darcy 2015, CONFIDENTIAL 18


Endurance Hydraulic Screen® - Burst and Collapse Testing (ISO 17824)

Burst and Collapse testing of the 6 5/8” Darcy screen system was conducted at Stress Engineering’s facility in Houston, as per ISO 17824.

System Collapse (activated)


 6 5/8” Hydraulic Screen was initially tested to 5,061psi without failure of the screen.
 Dispensation was given by Stress Engineering to increase the rating of the test cell.
 A second test was conducted and an increased pressure rating of 6,152psi successfully applied to the screen.
 Both tests were successfully completed with no loss of sand control as specified by the ISO standard.

System Collapse (activated)


 The burst test was conducted and loss of sand control occurred at 1,312 psi.

© Copyright Darcy 2015, CONFIDENTIAL 19


Endurance Hydraulic Screen® - Crush Testing
 To simulate geomechnical loading that could occur downhole.
 The chambers proved their ability to maintain pressure integrity in all tests.

© Copyright Darcy 2015, CONFIDENTIAL 20


Endurance Hydraulic Screen® - Variable Bore and Eccentricity

 Demonstrate the screen will conform to a well bore of variable diameter and eccentricity.

 A simulated gauge hole (approx. 8.681”)


 A simulated washed out hole diameter (approx. 9.75”)
 An oval hole 1.1 times the gauge hole diameter (8.50” – 9.35”)

 The screen activation was completed successfully across all casing


fixtures with satisfactory compliance achieved.

© Copyright Darcy 2015, CONFIDENTIAL 21


Endurance Hydraulic Screen® - Shroud Strip Off Testing

 Two test scenarios are completed to determine tensile rating of shroud to base pipe

Cemented strip off test


 Yield occurs at approx. 60,000lbs, Failed at 74,670lbs
 Failure point at parent metal of the shroud where it is fabricated to the
anchor ring
Cemented strip-off testing

Welded ring strip off test


 ‘Lowest’ sample failure at 88,900lbs
 Failure point at parent metal of the shroud where it is fabricated to the
anchor ring

Welded ring strip-off testing

© Copyright Darcy 2015, CONFIDENTIAL 22


Endurance Hydraulic Screen® - End Ring Push / Pull Tests

Testing conducted on the Clamp Body / Retainer Ring welds to establish the load capacity when welded as per
approved procedures

 Requested by several clients including Statoil and Petrobras


 Statoil require 100,000lbs load capacity without failure
 Testing required on both directions. A ‘Run in hole’ Push Test and a ‘POOH’ Pull Test

Applied Load Applied Load

Weld Sheared

Weld Sheared

Welds to
test
Push Test Pull Test

The sample successfully tested, failure occurred at a load of The sample successfully tested, failure occurred at a load of
194,68lbs, almost double the required figure 166,812lbs, almost one and a half times the required figure

© Copyright Darcy 2015, CONFIDENTIAL 23


Endurance Hydraulic Screen® - Qualification Summary

© Copyright Darcy 2015, CONFIDENTIAL 24


Thank you

For further information, please visit www.darcyflow.com