S-106-Pile Layout

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL NOTES

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
29 30 31 32 33 34 35 36 37 1. THIS DRAWING IS THE COPYRIGHT OF ATI CONSULTANTS, ARCHITECTS AND ENGINEERS AND
121.450 MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE CONSULTANT'S AUTHORITY.
2. DO NOT SCALE FROM THE DRAWINGS.
4.150 2.650 2.600 1.500 3.150 4.000 2.450 2.100 4.250 4.250 2.100 2.450 4.050 3.100 1.500 2.600 2.700 4.100 2.460 4.600 3.950 1.200 7.400 8.200 5.150 3.050 7.900 4.700 4.500 2.850 4.200 2.300 3.550 3. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL
0.700 0.700 0.340 DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
0.72 4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL,
1.50 2.60 0.72 0.78 0.78 1.82 1.50 2.00 1.50 1.84 2.00 2.00 1.03 STRUCTURAL, MECHANICAL, ELECTRICAL AND CIVIL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATIONS.
P3 P3 P3 P3 P4 P2 P2 P2 P2 P2 P3 P3 P3 2.88 2.03 2.03 2.38 5. THE CONTRACTOR SHALL SUBMIT FULL SHOP / SETTING OUT DRAWING FOR APPROVAL (BASED
2.08 0.85

1.00
1.10

P2

1.50 2.00 1.17


1.10
ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF ANY SITE WORKS,PLACING OF ORDERS,

2.00 1.50
0.85 2.00 1.50

0.55
2.10 0.20
P3 P4

0.43
2.10 0.20
P1 P1 P2 P3 MANUFACTURE OF FITTINGS, FIXTURES AND COMPONENTS.

0.33
0.40

0.40
A P2 P2 A
P2 P2 P2

1.00
P2

1.45
P4 P4 P4 P2 P2 P3 P1 P3
P3
2.400

2.400
P3 P3 P3 P2 P4

2.90
3.80
0.78 0.72 3.32 2.00 1.50

1.38
2.85

2.85
P3 P3 P3
P2 P2 P2 0.48
B 2.00 2.00 2.00 1.53 P2 B

0.98
2.00 1.30
P1 P1 P2 P2 P2 4.55
P2 P2 P2 0.13 P3 P3 P3 P2 P2 P2
P3 P3 P3 P3 2.38 3.60

3.48
P2 F'cu= 50 N/mm2
4.550

4.550
2.85

2.85

2.85

0.08 3.50

3.50
1.82 1.50 1.82 1.50
P2 P2 P3 P3 P3
P3 P3 P3 P3

1.15
P2 P2 P2 2.00 2.00 P3

2.00
P4 P2 P2
1.50

1.50

1.50

C C Fy = 460N/mm2

0.35
P2 P2 P2 P2 4.05 0.13
P3 P3 P3 P3
3.200

3.200
2.54 1.50 2.00 1.50 P3 P3 P3
0.73 2.60 1.50 4.68 2.00 2.00
P1 P1 P1

2.35 0.15
0.25
0.83 P1 P1 P1

0.35
D D

1.25
1.30 P2
2.750

2.750
2.03
0.20 P1
P1

0.38
E P2 E
2.650

2.650
P1 P1
F F
1.400

1.400
P3
P1

G G

2.20

2.20
0.50
3.450

3.450
0.25 1.25 P2 P1
P2 1.50 4.80 1.95 1.50

0.54 0.84
P1

1.50

1.50
H P4 P4 P4 P4 P4 P4
H
P2 P2 P1
P2 1.25
3.750

3.750
0.25
P3 P3
J J
54.250

54.250
8.600

8.600
P3 P3
K K
8.600

8.600
P3 P3
L L
3.200

5.800
M M
2.600

N N

2.13
2.17

2.17

3.64 3.64 2.67 2.68 3.64 3.64


2.900

2.900
P3 P3 P3 P4 P4 P4
1.50

1.50

1.50
1.50

1.50

1.50

P P
P4 P4 P4
2.93

2.93

P3 P3 P3
4.200

4.200
0.58 0.93 2.55

2.55

0.93 2.55
2.52

2.52

2.52

0.55 1.06 2.57 0.20 2.90 2.90 0.20


P1 P4 P4 P4
P3 P3 P3
1.50

1.50
0.91

P1 P3 P1
1.50
1.50

1.50

P1

0.58
0.60

Q Q
P1 P3
P3 P3 P3 P1 P4 P4 P3
3.64 3.64 2.25
0.55 3.09 3.64 2.67

4.150 2.650 2.600 1.500 3.150 4.000 2.450 2.100 4.250 4.250 2.100 2.450 4.050 3.100 1.500 2.600 2.700 4.100 2.460 4.600 3.950 1.200 7.400 8.200 5.150 3.050 7.900 4.700 4.500 2.850 4.200 2.300 3.550
0.700 0.700 0.340 121.450 C 13/10/2023 IFC ATI
B 31/08/2023 DETAILED DESIGN ATI
A 23/06/2023 SCHEMATIC DESIGN ATI
NO. DATE DESCRIPTION ISSUE BY
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
Lead Consultant
Arab & Turk International
Office 1001, 10th floor,

1 PILE LAYOUT Westbury Office Tower,


Burj Khalifa Boulevard,
1 : 200 Downtown Dubai, U.A.E.
+971 (0)4 435 7490
www.ati-cae.com info@ati-cae.com

Client

Project
AMERICAN SCHOOL OF
CREATIVE SCIENCE
G+3,
NAD AL SH
Discipline

STRUCTURAL DRAWINGS

Drawing Title

PILE LAYOUT

Drawn Checked Approved


AJ/MI RA/IA --
Date Scale
13/10/2023 As indicated A1
Project No. Drawing No. Rev

D-241 S-106 C
This drawing, the designs and details shown are the copyright of Arab & Turk International
Consulting Architects and shall not be copied or reproduced in any form without their
written consent.

+971 (0)4 435 7492 Office 1001, 10th Floor, Westbury Office Tower, Burj Khalifa
www.ati-cae.com Boulevard, Downtown Dubai, United Arab Emirates

Plot Date: 13/10/2023 3:41:39 PM

You might also like