Professional Documents
Culture Documents
Industrial Management
Industrial Management
[ Turn over
- 2 - - 5 -
3. a) Annual requirement of an Hem = 18000 pcs; cost per b) Solve the following transportation problem using
item = Rs.16/- ; Annual carrying cost = 30% of cost of VAM -
item; cost of placing one order = Rs.1,200/- To
Determine (i) the EOQ, (ii) total cost. Also desire the From X Y Z Capacity
Demand 40 50 60
4. Write short notes on : (any four) 4x5=20
a) Reliability Engineering
b) Acceptance Sampling
d) Network crashing
e) ABC analysis
f) Standard time
Duration (days) 12 11 10 8 11 18
- 4 - - 3 -
Calculate (i) σ, (ii) UCL, (iii) LCL and also construct Draw the network and identify the critical path. Also
the C-Chart. calculate the total float of each activity. 12
Unit No. 1 2 3 4 5