UNIT TRIPPING REPORT

Unit No. :- 2

1. Date of tripping : 13/03/2021


2. Time of tripping : 12:21:59 hrs
3. Status before unit tripping
a) Unit Load : 270
b) Mills in service : C,D,E,F
c) No. of oil guns in service :NA
d) No. of BFPs (TDBFP/MDBFP) :A,B
e) No. of CEPs :A,B
f) No. of ID fans : A,B
g) No. of FD fans : A,B
h) No. of PA fans :A,B
i) No. of CC pumps :A,C
j) No. of CW pumps : 02 NOS
k) Any other information
4. First up protection acted : Furnace Flame failure
5. Other relays/protections acted
6. Supporting documents attached
7.Any operation done prior to tripping : None

ID fan #2A Channel#1 came from permit and was taken i/s after just before the trip
incidence.
8. Remedial measures taken
9. Time/Date of Boiler light up hrs
10. Synchronization hrs
11. Signatures I Date