: 26071-100-GQI-GCQ-00017
1 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
REVISION LOG
2 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
TABLE OF CONTENTS
1 PURPOSE ………………………………………………………………………………………………….. 4
2 SCOPE …………………………………………………………………………………………..……………4
3 REFERENCED DOCUMENTS………………………………………………………..………………..4
4 ATTACHMENT……………………………………………………………………………………………..4
3 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
1 PURPOSE
The purpose of this document is to describe Inspection and Test Plan (ITP) for Electrical
Installation Early Work of The Refinery Development Master Plan (RDMP) Project RU V
Pertamina Balikpapan (hereinafter referred to as PROJECT).
2 SCOPE
This ITP applied for Electrical installation works such as Cables / Wires, Cable raceway,
Earthing/Grounding. Lighting System, Local Control System and LV Switch gear & MCC.
This document is applicable for inspection and test during construction for Electrical Installation
Early Work for The Refinery Development Master Plan (RDMP) Project RU V Pertamina
Balikpapan (hereinafter referred to as PROJECT).
3 REFERENCED DOCUMENTS
The documents listed below shall be as reference on ITP prior to inspection
- IFC Drawing
- Material approval
- Technical specification / Manufacture Recommendation
- Method Statement
- Equipment/Tools Certificate
- Project Procedure and Specification
4 ATTACHMENT
4 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
5 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Description:
Remark:
6 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
0 Pre-Inspection Meeting H H H
1 MATERIAL
7 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
2.1 Pre-Installation
8 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3PS-EW00- 26071-100-3SS-E00X-
c) Route & Schedule as per DWG ITR-EL-003-02 W W S
00001 00001
26071-100-3SS-E00X-
d) Cable Bending Radius IFC Drawing ITR-EL-003-02 W W S
00001
26071-100-3SS-E00X- 26071-100-3SS-E00X-
e) No Physical Damage & End Sealing ITR-EL-003-02 W W S
00001 00001
26071-100-3SS-E00X- 26071-100-3SS-E00X-
f) Arrangement & Separation ITR-EL-003-02 W W S
00001 00001
26071-100-3SS-E00X-
g) Suitable Cable Fixing IFC Drawing ITR-EL-003-02 W W S
00001
26071-100-3PS-EW00- 26071-100-3SS-E00X-
h) Cable Identification Mark ITR-EL-003-02/02A W W S
00001 00001
i) Spacing inside raceway (Trench / Tray / 26071-100-3PS-EW00- 26071-100-3SS-E00X-
ITR-EL-003-02 W W S
Duct) 00001 00001
26071-100-3PS-EW00- 26071-100-3SS-E00X-
j) Cleaning ITR-EL-003-02 W W S
00001 00001
before final
backfill and
2.3 Cable Test before
jointing and
terminating
2.3.1 LV Power cable
26071-100-3PS-EW00- Engineering Spec.
a) Continuity Test ITR-EL-003-05 W W W
00001 IFC Drawing
26071-100-3PS-EW00- Engineering Spec.
b) Insulation Resistance Test ITR-EL-003-05 W W W
00001 IFC Drawing
2.3.2 Control & Signal Cable
9 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3PS-EW00- Engineering Spec.
a) Continuity Test ITR-EL-003-07 W W W
00001 IFC Drawing
26071-100-3PS-EW00- Engineering Spec.
b) Insulation Resistance Test ITR-EL-003-07 W W W
00001 IFC Drawing
Connection / Termination
2.4
(Splicing, Connection)
26071-100-3PS-EW00- 26071-100-3SS-E00X-
a) No physical damages (visual check) ITR-EL-003-03 W W S
00001 00001
26071-100-3PS-EW00- 26071-100-3SS-E00X-
b) Cable glands ITR-EL-003-03 W W S
00001 00001
c) Permanent cable & core identification 26071-100-3PS-EW00- 26071-100-3SS-E00X-
ITR-EL-003-03 W W S
mark 00001 00001
26071-100-3PS-EW00- 26071-100-3SS-E00X-
d) Cable arrangement / separation ITR-EL-003-03 W W S
00001 00001
26071-100-3PS-EW00- 26071-100-3SS-E00X-
e) Conductor and terminal lug crimping ITR-EL-003-03 W W S
00001 00001
f) Armor / Screen / Shield treatment and 26071-100-3PS-EW00- 26071-100-3SS-E00X-
ITR-EL-003-03 W W S
connection 00001 00001
g) Cable connection to exact termination 26070-203-3PS-EW00- 26071-100-3SS-E00X-
ITR-EL-003-03A W W S
point J0001- 00001
h) Bolt tightening check (according to the 26070-203-3PS-EW00- 26071-100-3SS-E00X-
ITR-EL-003-03 W W S
vendor recommendation) J0001- 00001
10 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
3.1.1 Installation
a) Conformance to specification and Engineering Spec. Engineering Spec.
ITR-EL-004-01- W W S
drawings IFC Drawing IFC Drawing
Engineering Spec.
b) Check interference with others discipline IFC Drawing ITR-EL-004-01- W W S
IFC Drawing
Engineering Spec.
c) Support Installation & Bolt tightness IFC Drawing ITR-EL-004-01- W W S
IFC Drawing
d) Check Spacing between tray / ladder Engineering Spec.
IFC Drawing ITR-EL-004-01- W W S
layers IFC Drawing
e) Expansion joints / splice plates properly 26071-100-3PS-EYM0- Engineering Spec.
ITR-EL-004-01- W W S
Installed 00001 IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
f) All bonding jumpers are installed ITR-EL-004-01- W W S
00001 IFC Drawing
26071-100-3PS-EYM0-
g) Cable Tray tagging IFC Drawing ITR-EL-004-01- W W S
00001
26071-100-3PS-EYM0-
h) Earthing System IFC Drawing ITR-EL-004-01- W W S
00001
26071-100-3PS-EYM0- Engineering Spec.
i) Touch-up paint ITR-EL-004-01- W W S
00001 IFC Drawing
26071-100-3PS-EYM0-
j) Check no sharp edge IFC Drawing ITR-EL-004-01- W W S
00001
3.2 Cable Trench
3.2.1 Installation
a) Check cable trench type / size as per Engineering Spec.
IFC Drawing ITR-EL-004-02- R R R
drawing IFC Drawing
11 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
b) Check location, routing, depth and width Engineering Spec.
IFC Drawing ITR-EL-004-02- W W S
of cable trench IFC Drawing
c) Check physical damage and cable space Engineering Spec.
IFC Drawing ITR-EL-004-02- R R R
of underground cables IFC Drawing
d) Cable protection tiles, correct backfilling Engineering Spec.
IFC Drawing ITR-EL-004-02- W W S
and compaction installed IFC Drawing
e) Ends of PVC pipe sleeve to be sealed or Engineering Spec.
IFC Drawing ITR-EL-004-02- W W S
capped IFC Drawing
f) Cable bending radius within acceptance Engineering Spec.
IFC Drawing ITR-EL-004-02- W W S
limits IFC Drawing
g) Proper tagging of cable entering and Engineering Spec.
IFC Drawing ITR-EL-004-02- W W S
exiting all cable duct IFC Drawing
Engineering Spec.
h) Warning Tape Installation properly IFC Drawing ITR-EL-004-02- W W S
IFC Drawing
3.3 Conduit Pipe
3.3.1 Installation
a) Conformance to specification and Engineering Spec. Engineering Spec.
ITR-EL-004-03- R R R
drawings (Size, Location, materials) IFC Drawing IFC Drawing
26071-100-3PS-EYM0-
b) Expansion joints properly installed IFC Drawing ITR-EL-004-03- R R R
00001
Engineering Spec.
c) Check interference with others discipline IFC Drawing ITR-EL-004-03- W W S
IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
d) Support installation & bolt tightness ITR-EL-004-03- W W S
00001 IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
e) Check no sharp edge ITR-EL-004-03- W W S
00001 IFC Drawing
12 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3PS-EYM0- Engineering Spec.
f) Seal/drain/breather properly installed ITR-EL-004-03- W W S
00001 IFC Drawing
g) Field bend radius corrected per 26071-100-3PS-EYM0- Engineering Spec.
ITR-EL-004-03- W W S
specification and codes 00001 IFC Drawing
h) Spacing between instrument and power 26071-100-3PS-EYM0- Engineering Spec.
ITR-EL-004-03- W W S
conduit as per specifications 00001 IFC Drawing
i) Aluminum, PVC or PVC coated conduits 26071-100-3PS-EYM0- Engineering Spec.
ITR-EL-004-03- W W S
installed where specified on drawings 00001 IFC Drawing
4 EARTHING/GROUNDING SYSTEM
4.1 Installation
Engineering Spec.
a) Location /Area Classification IFC Drawing ITR-EL-00A-01 W W S
IFC Drawing
Engineering Spec.
b) Cable Trench/ Excavation accepted IFC Drawing ITR-EL-00A-01 W W S
IFC Drawing
26071-100-GQI-GAQ- 26071-100-3SS-E00X-
c) Tools / Equipment Tester ITR-EL-00A-01 W W S
00004 00001
26071-100-3SS-E00X- Engineering Spec.
d) Visual inspection during pulling cable ITR-EL-00A-01 W W S
00001 IFC Drawing
26071-100-3PS-EW00- Engineering Spec.
e) Check cable size and installation ITR-EL-00A-01 W W S
00001 IFC Drawing
26071-100-3SS-E00X-
f) Check underground cable jointing IFC Drawing ITR-EL-00A-01 W W S
00001
26071-100-3SS-E00X-
g) Check construction electrodes IFC Drawing ITR-EL-00A-01 W W S
00001
13 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3SS-E00X-
h) Check cable clamp and layout IFC Drawing ITR-EL-00A-01 W W S
00001
26071-100-3SS-E00X- Engineering Spec.
i) Check grounding connection ITR-EL-00A-01 W W S
00001 IFC Drawing
4.2 Testing
26071-100-3SS-E00X- Engineering Spec.
a) Earthing / Grounding continuity test ITR-EL-00A-01 / 02 W W S
00001 IFC Drawing
26071-100-3SS-E00X- Engineering Spec.
b) Inspect resistance of each electrodes ITR-EL-00A-01 / 02 W W S
00001 IFC Drawing
26071-100-3SS-E00X- Engineering Spec.
C) Inspect resistance of grounding loop ITR-EL-00A-01 / 02 W W S
00001 IFC Drawing
5 LIGHTING SYSTEM
5.1.1 Installation
Engineering Spec.
a) Location /Area Classification IFC Drawing ITR-EL-00B-01 W W S
IFC Drawing
26071-100-3SS-E00X- Engineering Spec.
b) Pulling cable accepted ITR-EL-00B-01 W W S
00001 IFC Drawing
26071-100-3SS-E00X- 26071-100-3SS-E00X-
c) Check Name plate and Rating ITR-EL-00B-01 W W S
00001 00001
26071-100-3SS-E00X- 26071-100-3SS-E00X-
d) Visual & dimensional ITR-EL-00B-01 W W S
00001 00001
14 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
e) Board assembly, mounting position and 26071-100-3SS-E00X- Engineering Spec.
ITR-EL-00B-01 W W S
bolting 00001 IFC Drawing
26071-100-3SS-E00X- Engineering Spec.
f) Busbars bolted connection ITR-EL-00B-01 W W S
00001 IFC Drawing
26071-100-3SS-E00X- Engineering Spec.
g) Check Fuse and Circuit breaker ratings ITR-EL-00B-01 W W S
00001 IFC Drawing
26071-100-3SS-E00X-
h) Cable glands, clamping and installation IFC Drawing ITR-EL-00B-01 W W S
00001
26071-100-3SS-E00X-
i) Check termination, Tag & wire number IFC Drawing ITR-EL-00B-01 W W S
00001
26071-100-3SS-E00X-
j) Check Earthing / grounding connections IFC Drawing ITR-EL-00B-01 W W S
00001
5.1.2 Testing
26071-100-3SS-E00X- ITR-EL-00B-01 / ITR-
a) Continuity test Vendor Procedure W W S
00001 EL-003-05
26071-100-3SS-E00X- ITR-EL-00B-01 / ITR-
b) Insulation resistance measurement Vendor Procedure W W S
00001 EL-003-05
26071-100-3SS-E00X- ITR-EL-00B-01 / ITR-
c) Phase sequence test Vendor Procedure W W S
00001 EL-002-05
26071-100-3SS-E00X-
d) Operation test Vendor Procedure ITR-EL-00B-01 H W W
00001
5.2 Lighting Fixture / Lighting Pole
5.2.1 Installation
Engineering Spec.
a) Location /Area Classification IFC Drawing ITR-EL-00B-02 W W S
IFC Drawing
15 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3SS-E00X-
b) Pulling cable accepted IFC Drawing ITR-EL-00B-02 W W S
00001
26071-100-GQI-GAQ- Engineering Spec.
c) Condition of material accepted ITR-EL-00B-02 W W S
00009 IFC Drawing
d) Visual and dimensional (check name Engineering Spec. Engineering Spec.
ITR-EL-00B-02 W W W
plate) IFC Drawing IFC Drawing
Engineering Spec.
e) Check grounding connection IFC Drawing ITR-EL-00B-02 W W W
IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
f) Check lighting fixture c/w accessories ITR-EL-00B-02 W W S
00001 IFC Drawing
g) Check the mounting system for lighting 26071-100-3PS-EYM0- Engineering Spec.
ITR-EL-00B-02 W W S
fixture 00001 IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
h) Check lighting pole c/w accessories ITR-EL-00B-02 W W S
00001 IFC Drawing
26071-100-3PS-EYM0- Engineering Spec.
i) Check lighting pole installation ITR-EL-00B-02 W W S
00001 IFC Drawing
Engineering Spec.
k) Check location lighting as per Layout IFC Drawing ITR-EL-00B-02 W W W
IFC Drawing
5.2.2 Testing
a) Test operation and setting of time Engineering Spec.
Vendor Procedure ITR-EL-00B-02 W W W
switches photoelectric. IFC Drawing
26071-100-3SS-E00X- ITR-EL-00B-02 / ITR-
b) Continuity Test Vendor Procedure W W W
00001 EL-003-05
26071-100-3SS-E00X- ITR-EL-00B-02 / ITR-
c) Insulation resistance measurement Vendor Procedure W W W
00001 EL-003-05
26071-100-3SS-E00X- ITR-EL-00B-02 / ITR-
d) Lighting circuit test Vendor Procedure W W W
00001 EL-002-03
16 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3SS-E00X- Engineering Spec, ITR-EL-00B-02 / ITR-
d) Illumination quality check W W W
00001 Vendor Procedure EL-002-04
17 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
b) Inspect interlock & control correctly 26071-100-3PS-EYM0-
Vendor Procedure ITR-EL-00C-01 W W W
operate 00001
c) Test indicating and signaling lamps or 26071-100-3PS-EYM0-
Vendor Procedure ITR-EL-00C-01 W W W
devices 00001
26071-100-3PS-EYM0-
d) Operation / function test Vendor Procedure ITR-EL-00C-01 H W W
00001
7.1 Installation
a) Identification (Nameplate, Equipment / 26071-100-3SS-E00X- Engineering Spec.
ITR-EL-006-01 W W W
devices ) 00001 IFC Drawing
Engineering Spec. Engineering Spec.
b) Location & Foundation ITR-EL-006-01 W W S
IFC Drawing IFC Drawing
26071-100-3SS-ESL0- Engineering Spec.
c) Alignment & Leveling ITR-EL-006-01 W W W
00001 IFC Drawing
d) Components complete and tight (bolt, 26071-100-3SS-ESL0- Engineering Spec.
ITR-EL-006-01 W W W
anchorage, bus bar, etc.) 00001 IFC Drawing
26071-100-3SS-ESL0- Engineering Spec.
e) Earthing ITR-EL-006-01 W W W
00001 IFC Drawing
f) Check protection device rating per 26071-100-3SS-ESL0- Engineering Spec.
ITR-EL-006-01 W W S
drawing (CB etc.) 00001 IFC Drawing
g) Cubicle door can be fully opened without 26071-100-3SS-ESL0- Engineering Spec.
ITR-EL-006-01 W W S
obstruction 00001 IFC Drawing
h) Adequate protection of equipment and 26071-100-3SS-ESL0- Engineering Spec.
ITR-EL-006-01 W W S
against corrosion 00001 IFC Drawing
18 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
26071-100-3SS-ESL0-
i) Cable glands, clamping and termination IFC Drawing ITR-EL-006-01 W W W
00001
26071-100-3SS-ESL0- Engineering Spec.
j) The relays have complete final setting ITR-EL-006-01 W W W
00001 IFC Drawing
7.2 Testing
a) Test indicating and signaling lamps or 26071-100-3SS-ESL0-
Vendor Procedure ITR-EL-006-01 W W W
devices 00001
26071-100-3SS-ESL0-
b) Test anti-condensation heater Vendor Procedure ITR-EL-006-01 W W W
00001
26071-100-3SS-ESL0-
c) PT's polarity & phase rotation Vendor Procedure ITR-EL-006-01 W W W
00001
d) Inspect interlock & control correctly 26071-100-3SS-ESL0-
Vendor Procedure ITR-EL-006-01 W W W
operate 00001
26071-100-3SS-ESL0-
e) Switchgear / MCC function test Vendor Procedure ITR-EL-006-01 H W W
00001
19 of 45
Inspection and Test Plan for
Electrical Installation Early Work
ITP No 26071-100-GQI-GCQ-00017
Job No. : 26071 Revision No. 002
Revision Date 23 SEP 20
Reference Acceptance Report Inspection Point
No. Description of Inspection or Test
Criteria
Remark
Document Form No. Subcon Contractor IPMT TPI
Note: For more detail & specific 'Reference Document' & 'Acceptance Criteria' shall be developed in accordance with the Project requirements.
20 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
Report No. :
Item PO No. :
Packing No :
Description
Vendor :
Quantity
Inspection date :
Result
No. Check Point Remark
Accept Reject N/A
1 Documentation
2 Shipping Damage
3 Physical Damage
4 Identification / Marking
5 Dimension
6 Cleanliness
8 Coatings / Preservatives
10 Desiccant
11 Lubricants / Oils
12 Storage Status
13 Other, if any
Inspection Result : □ Accept □ As-noted □ Reject
Contractor
Inspected by IPMT
QA/QC
Name
Signature
Date
GQI-GAQ-00009-01
21 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
2 Vendor documents
Note :
22 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
23 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
10 Cleaning
Note :
24 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
25 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
1 No physical damages
2 Cable glands
10
Note :
26 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
27 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
2. Check List
Installation IR Value (㏁) Continuity
No. Cable Tag & Size
From To L1-L2 L2-L3 L3-L1 L1,2,3-E,N Test
28 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
2. Cable List
Installation IR Value (㏁) Continuity
No. Cable Tag & Size
From To C-C C-S C-E Test
29 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
8 Earthing System
9 Touch-up paint
30 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
10
Note :
31 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
10
Note :
32 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
Note :
33 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
10
Note :
34 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
13 Operation Test
Note :
35 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
2. Check List
TEST POINT PHASE ROTATION TIE-IN
No. REMARKS
(Refer to attached drawing) CW / CCW BREAKER NO.
36 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
Note :
37 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
X2 Y2
3000 mm
3000 mm
Z Z
X Y
3 Allowable
Tolerance
Y1
X1 Y1
Note :
38 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
1. Test Equipment
MFR/Model No. Calibration Date :
Serial No. Calibration Due Date:
2. Check List
BRANCH CIRCUIT RESULT
No. PANEL NO. REMARKS
CIRCUIT NO. VOLTAGE
39 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
40 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
8 Installation Accepted.
Note :
41 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
5 Earth connection of the Panel and inspect internal earth bus bar
42 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
HAZARDOUS EQUIPMENT
INSPECTION SCHEDULE
Project : Report No :
DWG No. : System No. :
Location : Date :
Equipment / Tag No. : Subcontractor ::
Notes: 1. All fields are to be completed. Any non-applicable fields shall state “NA”.
2. Inspection to be performed in accordance with IEC 60079-14, 60079-17.
3. A Schedule should be completed for EACH item of Equipment.
Ex Ex Ex Ex Ex Ex Ex Ex Ex Inspection Result
No Check / Test
de d e n i/nL q o m p Accept Reject N/A
43 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
19 Insulation Resistance (IR) of the motor windings is satisfactory N/A N/A N/A N/A N/A
20 Breathing and draining device are satisfactory N/A N/A N/A
21 Printed circuit boards are clean and undamaged N/A N/A N/A N/A N/A N/A N/A N/A
Type of cable is appropriate and installed in accordance with
22 documentation
23 Cable screens are earthed in accordance with documentation N/A N/A N/A N/A N/A N/A N/A N/A
24 There is no obvious damage to cable
25 Sealing of trunking ducts, pipes and / or conduits is satisfactory N/A
26 Stopping boxes and cable boxes are correctly filled N/A N/A N/A N/A
Integrity of conduit system and interface with mixed system is
27 maintained
N/A N/A
Earthing connections, including any supplementary earthing
28 bonding connection are satisfactory (for example connections N/A
are tight and conductors are of sufficient cross-section)
Fault loop impedance (TN system) or earthing resistance is
29 satisfactory
N/A
30 Insulation resistance is satisfactory N/A N/A
Automatic electrical protective devices operate within permitted
31 limits
N/A
Automatic electrical protective devices are set correctly (auto
32 re-set not possible)
N/A
33 Point to point connections are all correct N/A N/A N/A N/A N/A N/A N/A N/A
Earth Continuity is satisfactory (e.g. connection are tight,
34 conductors are of sufficient cross-section) for non-galvanically N/A N/A N/A N/A N/A N/A N/A N/A
isolated circuits
INSTALLATION
35 Earth connections maintain the integrity of the type of protection N/A N/A N/A N/A N/A N/A N/A N/A
Intrinsically safe circuit earthing and insulation resistance is
36 satisfactory
N/A N/A N/A N/A N/A N/A N/A N/A
Separation is maintained between intrinsically safe and non-
37 intrinsically safe circuit in common distribution boxes or relay N/A N/A N/A N/A N/A N/A N/A N/A
cubicles
B.
44 of 45
Doc. No. : 26071-100-GQI-GCQ-00017
53 Protective gas pressure and / or flow is adequate N/A N/A N/A N/A N/A N/A N/A N/A
Pressure and / or flow indicators, alarms and interlocks
54 functions correctly
N/A N/A N/A N/A N/A N/A N/A N/A
Condition of spark and practical barrier of ducts for exhausting
55 the gas in hazardous area are satisfied
N/A N/A N/A N/A N/A N/A N/A N/A
Equipment is adequately protected against corrosion, weather,
ENV
Accessories Item
Note :
45 of 45