Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROVISION OF ENGINEERING, PROCUREMENT,

CONSTRUCTION AND COMMISSIONING (EPCC) OF


GARRAF INTEGRATED WAREHOUSE AND MAINTENANCE
FACILITIES (IWMF) FOR PETRONAS CARIGALI IRAQ
HOLDING B.V.
Document No : GO-IWM-STC-CAL-0004
Revision : 3
Page : Page 9 of 188

3.5 SEISMIC LOADS

The table 4.1 in PTS 11.10.02 gave a summary of common codes that can be used for normal buildings, However
ASCE 7 will be used since it is mor compatible with the Iraqi Seismic notes than the BS EN 1998 1:2015, AS pe
the Iraqi seismic notes, the seismic Parameter Ss = 0.3g see below picture

You might also like