Name:-Yadhunandan Roll No:-20222MLS0091 Class: - Sec 17 Exercise:-08 Date: - 12/02/2024

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

SUPPLY CHAIN To increase Efficiency in terms of completion time/ id

ANALYTICS(MBA4035) Different tasks have to be completed corresponding


NAME:-YADHUNANDAN The completion time (hrs) is indicated in the followin
Roll No :- 20222MLS0091
Class :- sec 17 A. Determine the total completion time of all the task
Exercise :-08 B. Find out if the completion time can be reduced. If
Date :- 12/02/2024 C. What is the increase in efficiency related to compl

TASK M1 M2
A 3 1
B 8 0
C 11 3
D 4 7
E 5 5
F 10 2
G 2 5

1. Based on First come First serve methoud

M1 M2
TASK S P F Wt S P
A 0 3 3 0 3 1
B 3 8 11 0 11 0
C 11 11 22 0 22 3
D 22 4 26 0 26 7
E 26 5 31 2 33 5
F 31 10 41 0 41 2
G 41 2 43 0 43 5
Total WT= 2hrs Makespan
s of completion time/ idle/waiting time :
mpleted corresponding to jobs on two machines M1 and M2.
ndicated in the following table.
tion time of all the tasks on both machines.
time can be reduced. If yes, how many hours can be reduced.
ciency related to completion time?

ud

F
4
11
25 1. Saving in Comp
33
38
43
48
Makespan
JOHNSON RULE

TASK M1 M2
A 3 1
B 8 0
C 11 3
D 4 7
E 5 5
F 10 2
G 2 5

The new order to Apply Jhonson Rule on Machine A &Machine B

M1 G D E C A B M2

M1 M2
TASK S P F WT S P F
G 0 2 2 0 2 5 7
D 2 4 6 1 7 7 14
E 6 5 11 3 14 5 19
C 11 11 22 0 22 3 25
A 22 3 25 0 25 1 26
B 25 8 33 0 33 0 33
Total WT= 4hrs Makespan

1. Saving in Completion Time : 48-33 = 15hrs. Eff increase in time = 15x100/ 48= 31.25 %
Machine B

48= 31.25 %