This document provides details on scaffolding materials needed for plastering work on the admin building at a PMAC site. Scaffolding will be erected on the north and east sides of an entrance area and will stand 10.5 meters high on the north side and 10.5 meters high on the east side. A total of 700 square meters of scaffolding is needed, requiring 230 vertical pipes, 120 horizontal pipes, 65 20-foot pipes, 20 10-foot pipes, and various other hardware.
This document provides details on scaffolding materials needed for plastering work on the admin building at a PMAC site. Scaffolding will be erected on the north and east sides of an entrance area and will stand 10.5 meters high on the north side and 10.5 meters high on the east side. A total of 700 square meters of scaffolding is needed, requiring 230 vertical pipes, 120 horizontal pipes, 65 20-foot pipes, 20 10-foot pipes, and various other hardware.
This document provides details on scaffolding materials needed for plastering work on the admin building at a PMAC site. Scaffolding will be erected on the north and east sides of an entrance area and will stand 10.5 meters high on the north side and 10.5 meters high on the east side. A total of 700 square meters of scaffolding is needed, requiring 230 vertical pipes, 120 horizontal pipes, 65 20-foot pipes, 20 10-foot pipes, and various other hardware.
This document provides details on scaffolding materials needed for plastering work on the admin building at a PMAC site. Scaffolding will be erected on the north and east sides of an entrance area and will stand 10.5 meters high on the north side and 10.5 meters high on the east side. A total of 700 square meters of scaffolding is needed, requiring 230 vertical pipes, 120 horizontal pipes, 65 20-foot pipes, 20 10-foot pipes, and various other hardware.
VERTICAL PIPE(2M PIPE) 20' SCAFFOLDING PIPE KAVADI PIPE X BASE PLATE 10.50 X JOINT PIN Entrance Area Scaffolding Material For Masonry Work Purpose. X X NORTH SIDE : 12.00RM MS CLAMP HEIGHT : 10.50M X X EAST SIDE : 55.50RM HEIGHT : 10.50M 55.500 TOTAL AREA IN SQM. : 700.00 VERTICAL PIPE 2M = 230nos HORIZONTAL PIPE(kavadi) 1.2M = 120 nos 20' M.S PIPE = 65nos 10' M.S PIPE = 20nos INCLINED CLAMP = 50nos SUPPORTING PIPE JOINT PIN = 45nos BASE PLATE = 50nos 12.000