BILL NO. A- PRELIMINARIES
UNIT
ITEM AMOUNT
DESCRIPTION QTY. UNIT RATE
NO. (RS)
(RS)
PRELIMINARIES
A Note : Following items to be priced as
appropriate
The tenderer is advised to visit the site of the Note
proposed work, as it is his responsibility to
ascertain the conditions, governing access to the
site, external working space, storage area, status
of the adjoining properties etc.
The contractor shall be responsible for any loss or Note
damage to the work, existing structures, adjoining
structures and unfixed materials.
The Contractor shall be responsible for providing Note
adequate provisions to reduce the amount of
vibration, dust, pollution and noise from the site
and shall be contractor's responsible any
complaints, damages or claims in connection with
the works.
The Contractor shall be responsible for providing Note
and maintaining access to the site. It would be his
responsibility to complete the access roads to suite
the requirement of the project.
The Contractor shall be responsible for carrying Note
out accurate survey to define the building works
etc., and check the layout and all levels and such
other surveys as may be necessary to establish
accurately the placing of forms and pouring of
concrete and all other works and setting out in
both vertical and horizontal plane.
All the temporary works shall be dismantled and Note
cleard away from the site on completion of the
work.
Any other preliminary items not listed Note
below/above but deemed to be included in the
tender rates, as no extras would be made.

Mode of payment for preliminary items shall be


as described below (refers to ICTAD Publication
No. ICTDA/ID/04);
(A) - Reimbursement of actual cost on submission
of the relevant documents acceptable to the
Engineer plus 50% of the actual cost of obtaining
the Insurance Policies and Securities, subjected to
the maximum quoted for that item.
(B) - To be paid on signing of the formal Contract
Agreement
(C) - 60% on completion of temporary buildings
or structures. 30% in equal installments over the
contract period and balance 10% on dismantling
and removal on completion.
(D) - Paid on satisfactorily completion of the item.
(E) - In equal installments over the contract
period.
(F) - Mode of payment to be mutually agreed
between Contractor and the Employer at the
commencement of contract in relation to the
programme of work.
(G) - On the completion of work.
Insurance and Securities
A.1 Allow lump sum for providing a Performance Allow Item Sum
Security as specified. 0.00
A.2 Allow lump sum for providing an Advance Allow Item Sum
Payment Security as specified. 0.00
A.3 Allow Item Sum
Allow lump sum for insurance of Works,
Machinery & Equipment, Plant, Materials, third
party persons & property and Employer’s 0.00
personnel & property at site as per the Contract.
A.4 Allow lump sum for insurance against accidents Allow Sum
and injury to Contractor’s personnel as per the
Contract. 0.00
Engineer’s facilities
A.5 Constructing, maintaining, dismantling and 0 Item
removal on completion of the Works, a temporary
building for Engineer’s office in conformity with
the plans provided for Engineer’s requirements,
including necessary furniture and fittings,
furnishing, sanitary facilities and other facilities. 0.00
A.6 0 Item
Allow lump sum for maintenance, rental and
consumption charges etc. for telephone and
facsimile facilities, electricity and water
services for the Engineer’s site office for their
use in connection with the Works. 0.00
Contractor’s facilities
A.7 Allow lump sum for constructing, Allow Item Sum
maintaining, dismantling and removal on
completion of the works, a temporary site
office at adequate size including staff rest
room and toilets and other facilities for the
Contractor’s site management staff in
accordance with the plans prepared by the
Contractor and concurred by the Engineer.
A.8 Allow Item Sum
Allow lump sum for constructing,
maintaining, dismantling and removal on
completion of the works, buildings to be used
as workshops and stores for materials. 0.00
A.9 Allow lump sum for constructing, Allow Item Sum
maintaining, dismantling and removal on
completion of the works, a temporary
buildings in accordance with the plans
prepared by the Contractor and concurred by
the Engineer to accommodate the following:
1. Worker’s rest room, canteen facilities,
kitchen
2. Toilet and wash areas
3. Sick/ First - Aid room
Facilities to the workmen shall confirm to the 0.00
latest public health and industrial regulations.
Construction Management and
Supervision
A.10 Allow lump sum for employing suitably 4 Months
qualified and experienced technical personnel
on full time basis for Construction
management Services at the site.
(a) For 1 nr. Engineer Assistant – Civil as
0.00
specified over contract period.
Setting out
A.11 Allow lump sum for setting out the Works in Allow Item Sum
accordance with drawings and other written
0.00
information given by the Engineer.
Quality, Standards and Progress
A.12 Allow lump sum for provision of progress 4 Months
reports including photographic records and
other schedules included in the CIDA
publication- Guidelines for Effective
Constriction Management. (CIDA/CM/01),
relevant to contract administration as directed
0.00
by the Engineer.
A.13 Item
Allow lump sum for all cost in connection with
preparing samples for testing, making
arrangements for testing Materials, Goods etc., as
stipulated in the specification, obtaining test 0.00
reports and submitting the same to the Engineer.
A.14 Item
Allow lump sum for provision of 2 sets of (j=hard
copies and soft copies) as-built drawings of all
services, for Engineer’s approval.
Health, Safety and Environment
A.15 Allow lump sum for provision of a first aid box Item
and regular supply of medicine, linen etc. 0.00
A.16 Item
Allow lump sum for providing all necessary
safety measures to workmen at site conforming to
the latest industrial safety regulations and as 0.00
directed by the Engineer.
A.17 Allow lump sum for maintaining the site in a Item
clean and orderly manner, “Dengue Prevention in
Construction site” using approved domestic type
“Larvicide application” as directed by the
National Dengue Control Unit (Health Ministry)
minimum once a week and during the entire
contract period.
A.18 Item
Allow lump sum for maintaining the site in a
clean and orderly manner at all times and during
the entire contract period. 0.00
A.19 Allow lump sum for demobilization, removal of Item
all rubbish & debris and clearing up site on
completion, leaving all in good order and
handling over. 0.00
Security and Protection
A.20 Allow lump sum for employing an adequate Item
number of security personnel on full time basis
throughout the period of construction, and provide
for necessary security lighting and a warning
system. 0.00
A.21 Allow lump sum for providing and maintaining Item
necessary fencing, hoarding and gates for
safeguarding the Works, Materials and Plant, as
directed by the Engineer. 0.00
A.22 Allow lump sum for supply of water for the Item
Works and paying all charges and other
expenses in connection with the supply from
water mains or any other alternative method
of water supply, storage and reticulation. 0.00
A.23 Allow lump sum for supplying temporary Item
electricity for the Works including
connection, distribution system for the
Works, internal arrangements and all
payments to the authorities for consumption. 0.00
Miscellaneous
A.24 Allow lump sum for providing and Item
maintaining a name board to the
specifications and/or as directed by the
Engineer. 0.00
A.25 Allow lump sum for providing Plaque at the Item
handing over of the project as directed by the
Engineer. 0.00
PRELIMINARY WORKS CARRIED TO
GRAND SUMMARY
Construction of Changing Room with Casual Toilets and Showers for Public Use at the
Premises of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quantities (BOQ)
BILL N . B- CONSTRUCTION OF WASHROOM
UNIT
ITEM AMOUNT
DESCRIPTION QTY. UNIT RATE
NO. (RS)
(RS)
Note: Note
All Tenders are advised to visit the site & make
careful study of existing condition of the
location, Site extent, transporting and storage of
materials & extent of works to be done under
this contract and price the BOQ accordingly.
Note: Note
Tenderers are requested to refer Conditions of
Contract, Specifications, and Drawings. General
Notes, Pricing Preambles, and all other relevant
documents prior to pricing of the following
items.
B.1 SITE PREPARATION
B.1.1 Clearing site vegetation bushes, scrubs under 145 m2
growth hedges and trees and stumps <= 300mm
girth, removing all debris from site.
B.1.2 Removing trees and stumps girth exceeding 8 Nr
300mm and less than 600mm including
grubbing uproots, cutting trunks to directed
sizes and properly stack on site and handover to
the client and remove all debris from site
(provisional). Rate shall included for holes
backfilled with approved earth.
B.1.3 Removing trees and stumps girth exceeding 4 Nr
600mm and less than 1500mm Including
grubbing uproots, cutting trunks to directed
sizes and properly stack on site and handover to
the client and remove debris from site
(provisional). Rate shall included for holes
backfilled with approved earth.
B.1.4 Removal of top soil up to a depth of 150mm. 13 m3
SITE PREPARATION CARRIED TO
SUMMARY
B.2 EXCAVATION AND EARTHWORK
Rate is included for:
Back filling with selected excavated material & Note
consolidating. Surface treatment compaction
before filling / foundation.
Disposal of surplus soil as directed & keeping Note
all excavations free from water unless
otherwise measured separately.
Any additional excavation for working space. Note
Earth work supports & dewatering if necessary. Note
All excavations are measured net. No Note
allowance made for working space.
Excavation for foundation commencing from Note
formed ground level.
B.2.1 EXCAVATION
B.2.1.1 For column Pits 18 m3
B.2.1.2 For Wall Foundation 22 m3
B.2.2 Filling
B.2.2.1
Filling with approved excavated earth to make 4 m3
up levels in 150mm thick layers well rammed
and consolidate (Well compacted to achieve
95% or more compaction.)
B.2.2.2
Filling with approved imported earth to make 25 m3
up levels in 150mm thick layers well rammed
and consolidate. (Well compacted to achieve
98% or more compaction.)
B.2.2.3 Bulk filing with Aggregate Base Course 9 14 m3
(ABC) up to approximate depth of 2m. Work
comprising supplying placing, leveling,
watering and compacting ABC using
machineries in 150 mm thk.( Well compacted to
achieve 98% or more.)
B.2.3 Surface Treatments
Work shall be carried out by a reputed pest Note
control Company approved by the Engineer.
Anti-termite treatment with Bifenthrine 10Tc Note
(Biflex) or approved equivalent as per
manufacture's specification and should be
complied with below given sub paragraph (a) to
(f) .Rate shall be included for 10 years
warranty from Project Handing Over address
in the name of the Employer.
Necessary recharging pipe network with 12mm Note
dia flexible hose and points shall be provided
for future refilling work. Pipe layout should be
approved by Engineer before proceed the work.
Plinth Area be measured of the building. Note
(a) Dilution ratio of chemical with water to be Note
1:200
(b) Minimum coverage of chemical solution to Note
be 5ltr/m2
(c) 18-20mm holes shall be drilled at 900mm Note
interval along exterior and Interior perimeter of
the structure up to 300mm depth.
(d) Entire soil surface of the structure shall be. Note
(e) Recharge filling point should be covered and Note
secure with appropriate method.
(f) Warranty should submit for 10 years by both Note
of reputed Pest control Company & Contractor
(For Material & workmanship)
B.2.3.1 Anti-termite treatment in building in building 100 m2
area.
EXCAVATION AND EARTHWORK WORKS CARRIED
TO SUMMARY
B.3 CONCRETE WORKS
The contractor is requested to refer Conditions Note
of Contract, Specifications, Drawings General
Notes Pricing Preambles, and all other relevant
documents prior to pricing of the following
items.
Rate shall include for depositing, handling, Note
curing, transporting hoisting into position,
vibrating etc. and making good after removal of
formwork etc.
The method of transporting concrete shall be Note
submitted for approval. Concrete shall be
transported in uncontaminated watertight
containers in such a manner that loss of material.
Rates for lean concrete shall include for Note
preparation of bottom of excavation prior to
pouring of lean.
Contractor shall ensure that the top of the lean Note
concrete layer shall be finished to receive
waterproofing layer where ever applicable.
Prior approval to be obtained for mix design Note
and all concrete shall be with river sand.
B.3.1 Mass concrete (Grade 15); poured in to
ground.
B.3.1.1 50mm thick Screed 42 m2
B.3.2 Concrete (Grade 20) poured in to floor slab.
B.3.2.1 In Ground floor / Pavement /Ramp/ Steps 6 m3
B.3.3 Concrete (Grade 25) poured in to Up to
DPC level
B.3.3.1 In footings 3 m3
B.3.3.2 In Columns/Stiffener 1 m3
B.3.3.3 In Tie Beams 6.5 m3
DPC Level to Roof Slab /Water Tank level
B.3.3.4 In Columns/Stiffener 5 m3
B.3.3.5 In roof slabs, Water Tank slab, Roof Beams, 15 m3
front entrance sunshade & edge curb
B.3.3.6 In Lintel & SH Beams 0.5 m3
B.3.3.7 0.5 m3
In Vanity Tops
B.3.4
FORM WORK
Formwork has been measured as the net contact Note
surface measurement between concrete and
Rates shall include for working in difficult
conditions such as structures for perimeter
walling. The contractor shall provide details of
his formwork system before commence the
work.
Rate for form work to be included for all Note
necessary boarding, supports, erecting, framing,
cutting angles , cleaning, wetting and any
surface treatment before and after placing of
concrete.
Easting, striking, removing and cleaning and Note
preparing for re-use and removal when no
longer.
Up to DPC level Note
B.3.4.1 In footing 14 m2
B.3.4.2 In Columns/Stiffener 18 m2
B.3.4.3 In tie Beams 55 m2
DPC Level to Roof Slab level
B.3.4.4 83 m2
In Columns/Stiffener
B.3.4.5 In Roof slab, Water Tank Slab, Roof Beams, 160 m2
front entrance sunshade & edge curb
B.3.4.6 In Lintel & Sill Beams 3 m2
B.3.4.7
In Vanity Tops 3 m2
B.3.5
REINFORCEMENT
Rate to include for supplying, cleaning, cutting Note
bending, fabricating and the provision of all
necessary temporary fixings and supports etc.
including binding wires, bends, hooks, chairs
tying wires, distance blocks, steel
separators/spacers (designed lops and m.s chairs
if included in High yield (to BS 4449 &
characteristic strength fy = 460 N/mm2) and
Mild Steel (to BS 4449 & characteristic strength
fy=250 N/mm2)
Up to DPC level
B.3.5.1 In footings 300 Kg
B.3.5.2 In Columns /Stiffener 180 Kg
B.3.5.3 In tie Beams 700 Kg
B.3.5.4 In Ground Floor /Ramp/ Pavement/Steps 500 Kg
DPC Level to Roof Slab level
B.3.5.5 In Columns/ Stiffener 900 Kg
B.3.5.6 In Roof slab, Water tank slab, Roof Beams, front 2000 Kg
entrance sunshade & edge curb
B.3.5.7 In Lintel & still Beams 100 Kg
B.3.5.8 60 Kg
In Vanity Tops
B.3.6 Supply and laying 2'' × 2'' mesh as instructed by
the Engineer to the concrete filling area and
other specified area
B.3.6.1
In Roof Top 80 m2
B.3.7 Supply and laying of 1:2:4 cement sand chips
concrete layer of minimum 40mm thick n water
proofing membrane as included by the engineer
B.3.7.1 m2
In roof top 75
B.3.8 Supply and installation of 1800mm length pre 86 Nr
stressed concrete pergolas 100 × 150 as per the
detail drawing.
CONCRETE WORKS CARRIED TO
SUMMARY
B.4 MASONRY WORKS
Rate is included for lifting, handling, weighting Note
all rough and fair cutting, plumbing angles,
normal straight cutting, forming rebated reveals
and raking out joints for plastering.
B.4.1
STONE WORK
B.4.1.1 150 × 225mm random rubble masonry in cement 32 m3
and sand (1:5) mortar in foundations/retaining
walls.
B.4.2 BRICK WORK
Brick walls in common bricks with 1:5 cement
& sand mortar for walls
DPC Level to Roof Slab /Water Tank level
B.4.2.1 m2
225mm thick. 150
B.4.2.2 112mm thick. 35 m2
MASONRY WORKS CARRIED TO
SUMMARY
B.5
WATER PROOFING
For the full description of materials and Note
workmanship refer to the relevant sections of
Specification of works, Pricing Preambles and
the drawings.
Contractor is supposed to furnish all technical Note
details, samples and any other related literature
available along with the quotation to the
Engineer for approval.
Waterproofing treatments to be followed Note
manufacturer's specifications and shall provide
a 10 year Guarantee acceptable to the Engineer,
and the materials to be approved by the Engineer
before the Procurement.
Note
Rate shall include for extra over for apply water
proofing around pipe and pipe fittings.
B.5.1 Horizontal damp proof membrane DPM 75 m2
girth>300mm; consisting of gauge 1000
polythene membrane laid on compacted earth
filling (measured net no allowances made for
laps)
B.5.2 Supply and Laying of 4mm thick Torch-on
membrane or any other equivalent product
marketed /installed. Rate shall include the
formation of edges, torch welding and fixing
metal strip on vertical walls at termination edges
as per the detail drawing. Protective screed
measured separately.
B.5.2.1 In roof Slabs 75 m2
B.5.3 Applying the flexible cementations water 70 m2
proofing membrane in specified wall areas. All
as per the manufacture's specification &
technical literature. (In area tile finished, exist
tile bed will act as protective screed and the
wall painted area Plaster will act as protective
bed).
B.5.4
Expansion Joints
B.5.4.1 Fill the groves (10mmx25mm) with the mastic 8 m
filler as per the details and instruction.
WATER PROOFING WORKS CARRIED
TO SUMMARY
B.6
CARPENTRY WORK
The Specified timber for doors and windows as Note
follow or otherwise as specified as per
Engineers instruction. All timber members to
be well seasoned & treated with wood
preservative.
Door/window Frame- All the timber frame Note
should be Thualang or equivalent approved by
engineer, size 75 × 100 mm or as specified in the
drawing.
Timber Door sash/ Window sash should be Teak Note
thickness 32mm after finish or as specified in the
drawing.
The Specified timber for doors and windows as Note
follow or otherwise as specified as per
Engineers Instruction.
All timber members to be well seasoned & Note
treated with wood preservative.10 years
warranty should be given for the treatment.
All timber door/window Surfaces to be well Note
planned and applied two coats of water base
stain sealer and two coats of water base coats
approved by Engineer.
All ironmongery to be heavy duty high quality Note
fittings with minimum 5 years warranty.
HPL works should be carried out by Note
specialized sub-Contractor. All the shop
drawings should be approved before proceed
the work.
Supply cost of the door locks are paid Note
separately and fixing and other cost of door
locks shall be associated with rate of
particular item
DOORS AND WINDOWS
B.6.1 Supplying & fixing of Type D1 2100 × 1100 2 nr
size single Sash timber door including all
necessary accessories as directed by the
Engineer. Minimum 6 nrs of hinges.
B.6.2 Supplying & fixing of Type D2 2100 × 890 7 nr
size single Sash timber door including all
necessary accessories as directed by the
Engineer. Minimum 5 nrs of hinges.
CARPENTRY WORKS CARRIED TO
SUMMARY
B.7
PLUMBING/SANITARY
INSTALLATIONS
Refer, General notes, Pricing preambles, Note
Drawings, Specifications, Conditions of
contract and other relevant documents prior to
pricing of this section of
Rates for all pipes shall include for pipe fittings Note
such as bends, tees, reducers, sockets etc. and
all fittings shall be molded fittings.
All pipes to be fixed to wall, soffit of slabs or Note
ceiling etc. shall be in suitable gauge aluminum
clips.
Rates shall include for screws nails, pipe Note
hooks, saddles, brackets, sockets, connections,
lagging short lengths, back nuts, nipple joints,
concrete blocks and the like and all holes
chasings etc. and making good in other trades
such as plaster and
All P.V.C pipes shall be National, S-Lon, Note
Anton or equivalent manufacture in suitable
type appropriate for the purpose.
B.7.1
WATER SUPPLY SYSTEM
Supplying and laying of Type 1000. PVC pipes
including all specials.
B.7.1.1 5 m
-do- 20mm dia.
B.7.1.2 20 m
-do- 25mm dia.
B.7.1.3 25 m
-do- 32mm dia.
B.7.2 SUPPLYING & FIXING OF BRASS GATE
VALVES
B.7.2.1 -do- 32mm dia. 2 nr
B.7.2.2 -do- 25mm dia. 3 nr
B.7.3 Water Tanks
Supply & Installation 2000L triple layer water
tanks of approved quality including placing and
other all connection pipes , fittings as per the
details.
B.7.3.1 In water tank floor level 2 nr
B.7.3.2 Supply & of approved quality 50mm dia. Brass 4 nr
bowl valve
B.7.4 SOIL & WASTE WATER DISPOSAL
SYSTEM

Supplying and laying of T600 pipes


including all specials

B.7.4.1 -do- 160mm dia. 15 m


B.7.4.2 -do- 110mm dia. 25 m
B.7.4.3 -do- 75mm dia. 15 m
B.7.4.4 -do- 63mm dia. 40 m
B.7.4.5 10 m
-do- 50mm dia.
B.7.5 Man hole
Supply all materials and construct manholes in
Grade 25(20) reinforced concrete. Rate shall
include for excavation, backfilling remove
surplus earth away from site, 150mm thick seal
base slab, benching, 125mm thick wall,
medium duty double seal cast iron cover slab
cover slab, iron rungs, reinforcement at 150 c/c,
formwork and screed concreting as per detail
drawing. Top surface of concrete shall be
rendered with neat cement as instructed by
Engineer.
B.7.5.1 For size of 450 × 450 (Depth up to 0.45m) 4 nr
B.7.5.2 For size 600 × 600 (Depth between 0.45m up to 3 nr
0.6m)
B.7.5.3 For size of 750 × 750 (Depth between 0.6 m-1.2 2 nr
m)
B.7.6
Water Seal Catch Pit
Supply all material and construct water sealed
catch in Grade 25(20) reinforced concrete. Rate
shall include excavation, backfilling, remove
surplus earth away from site, Concrete for 125
mm thick base slab and 100 walls, medium duty
double seal cast iron cover slab, reinforcement
at 150 c / c, smooth formworks to and screed
concreting. Top surface of concrete shall be
rendered with neat cement instructed by
Engineer.
B.7.6.1 3 nr
For size 300 × 300 (Depth up to 0.4m)
B.7.6.2 For size of 450 × 450 (Depth between 0.4m up 5 nr
to 0.6m)
B.7.6.3 2 nr
For size of 600 × 600 (Depth above to 0.6m)
B.7.7
SEPTIC TANK AND SOAKAGE PIT
SEPTIC TANK
B.7.7.1 Supply & placing of 1.8m dia, 2.44m length 2 nr
pre-cast septic tank (Lanka Hume pipe or
similar quality) minimum volume of 6m3.
Rate shall be included for excavation,
backfilling, and necessary shoring, dewatering
if necessary, compacting bottom of excavation
and preparing surface, disposal of surplus
excavated materials away from site 200mm
sand bedding in bottom of excavation stacking
and launching of pre-cast septic tank in to
position and construction of two nor 450 ×
450mm inspection chamber (depth up to
600mm) on the pre-cast septic tank with
125mm thick grade 25mm wall consisting with
all necessary formwork, reinforcement
(T10@150c/c b/w), iron rungs, internal
plastering and covered with two numbers of
medium duty double seal cast iron cover lid
and 80mm dia GI vent pipe and all necessary
works to fixing and laying of type 600 ×
160mm dia pipe outlet complete to working
order as directed by the Engineer.

SOAKAGE PIT

B.7.7.2 Supply & placing of 1.38m dia, 1.22m length 2 nr


pre-cast soakage pit (Lanka Hume pipe or
similar quality) with 125mm thick C25
concrete (RF T10@100) covers lab 110mm dia
hole for fixing inlet. Rate shall be included for
excavation, backfilling, shoring if required,
dewatering where necessary, compacting
bottom of excavation and preparing surface,
disposal of surplus excavated materials away
from site, 50mm thick grade 15 screed on
bottom, stacking and launching of pre-cast
soakage pit in to position, 300mm 25-40mm
size metal filling layer on bottom of soakage pit
and construction of 450 × 450mm inspection
chamber on top of the soakage pit with 125mm
thick grade 25 concrete wall with necessary
form of work and reinforcement (T10@150c/c
b/w), internal plastering, medium duty cast iron
cover lid and all necessary pipe works
complete to working order as directed by the
Engineer.
B.7.8
RAIN WATER OUTLETS
B.7.8.1 Supplying and installation of rain water outlets 12 m
with type 600, 110mm dia, PVC pipe in roof
slab area.
B.7.9 SANITORY FITTINGS AND
ACCESSORIES
B.7.9.1 Supply and installation of Water closet (Rocell 3 nr
Aqua + or equal) suit consisting of pedestal pan
with ' trap, close coupled flushing cistern
including all accessories complete to working
order to Engineers approval. (Prime Cost
52,000/=)
B.7.9.2 Supplying and installation of vanity type wash 4 nr
basin (Rocell Zen or approved by Engineer)
with angle valve, flexible connection,
chromium plated pillar tap, rubber plug and
chromium plated chainwast, bottle trap fixed as
including water supply and waste water
connection all complete to working order.
(Prime Cost 15,000/= Excluding VAT)
B.7.9.3 Supply and installation of Bowl type urinal 2 nr
(Rocell FLO or approved by Engineer), cistern
and including individual flush valve (chromium
plated) all spreader and flushing pipe, waste
outlet bottle trap as specification and detail,
complete to working order. Urinal flush valve
is manual (Prime Cost 35,000/=)
B.7.9.4 Supply & fixing of Chromium plated bidet 3 nr
spray with angle valve and necessary
accessories (Prime Cost 4,500/=)
B.7.9.5 Supply & fixing of approx. 1850mm × 750mm 2 nr
mirror over vanity basin with 15mm thick
100mm wide teak timber framework and
necessary accessories (Prime Cost 2,000/= )
B.7.9.6 Supply & fixing of 600mm × 750mm mirror
over half pedestal type wash basin with Nos. Rate only
necessary accessories.
B.7.9.7 Supply & fixing of 20 mm Chromium plated 3 nr
brass bib taps. (Prime Cost 3,500/=)
B.7.9.8 Supply & fixing of S/S 150 × 150 × 125 mm 14 nr
deep injunctions molded PVC floor trap (catch
pit) with stainless steel grating cover top
(Prime Cost 4,500/=)
B.7.9.9 Supply and installation of stainless steel mat 3 nr
finished soap dispenser in toilets. (Prime Cost
5,000/=)
B.7.9.10 Supply and fixing of Hand Dryer with 2 nr
necessary accessories. (Prime Cost 25,000/=)
B.7.9.11 Supply and fixing of Hand Towel Dispenser 2 nr
with necessary accessories. (Prime Cost
14,500/=)
B.7.9.12 Supply & fixing of Chromium plated Towel 6 nr
Rail with necessary screws. (Prime Cost
3,000/=)
B.7.9.13 Supply & fixing of Chromium plated shower 4 nr
rose with conceal valve & necessary
accessories (Prime Cost 6,000/=)
PLUMBING WORKS CARRIED TO
SUMMARY
B.8 FLOOR / WALL AND CELING FINISHES
The contractor is requested to refer Conditions Note
of Contract, Specifications, Drawings, General
Notes, Pricing Preambles, and all other relevant
documents prior to pricing of the following
items.
Rate shall be included tile laying using tile Note
addehisive.
Reveals are not measured separately. Note

FLOOR FINISHES
B.8.1 Cement sand (1:3) screed, level and to slopes ≤
15 from horizontal, 20mm thick finished
smooth natural cement rendering.
B.8.1.1 10 m2
In ground floor
B.8.1.2 In Roof Slab 50 m2
B.8.2 Ditto - but 100 mm high skirting
B.8.2.1 In ground floor 10 m
B.8.3 Supplying and fixing 600mm × 600mm 55 m2
porcelain (non skid) floor tiles to an approved
manufacture, colour and design on and
including 20 mm thick cement and sand 1 : 3
bedding and pointing with tile grout to match
the colour of tiles. (Prime cost sum for tile -
Rs.1,100.00 display price per 600x600mm
tile)
B.8.4 do Skirting 50 m
B.8.5 Supplying and fixing 600mm × 600mm 20 m2
porcelain (non skid) rustic floor tiles for ramp
area to an approved manufacture , colour and
design laid on and including 20 mm thick
cement and sand 1:3 bedding and pointing with
tile grout to match the colour of tiles. (Prime
cost sum for tile - Rs.1,150.00 display price
per 600x600mm tile)
B.8.6 WALL FINISHES
All masonry mortar to be in river sand.
The rate is included for all temporary rules,
screeds, grounds etc. for raking out joints of
new brick work or hacking new concrete for ,
internal & curved angles, joints between
different surfaces arises quirks, inter sections
between curved or irregular shapes.
Up to DPC level
B.8.6.1 Plinth plastering with 20mm thick 1:3 cement 21 m2
sand plaster finished smooth with colour
cement floating
DPC Level to Roof Slab level
External
16mm thick cement & sand (1:5) plaster
finished semi rough with wood float on
external faces, on brick / concrete surfaces.
B.8.6.2
In Ground floor level 100 m2
B.8.6.3 m2
In Water Tank Level 20
Internal
16mm thick cement & sand (1:5) plaster
finished semi rough with wood float on internal
faces on brick/ concrete surfaces.
B.8.6.4 In Ground floor level 110 m2
B.8.6.5 In Water Tank Level 20 m2
B.8.7 Supplying and fixing 600mm × 300mm 80 m2
ceramic wall tiles for wash room walls to an
approved manufacture, colour and design laid
on and including 20 mm thick cement and sand
1:3 bedding and pointing with tile grout to
match the colour of tiles. (Prime cost sum for
tile - Rs.850.00 display price per 600x300mm
tile)
B.8.8 Supply and laying Dress Rubble approx. 50 m2
50mm thick. Natural rubble slates for external
walls, laid on and including 20 mm thick
cement and sand 1:3 bedding using cement
slurry as directed by the Engineer.
B.8.9 Supply and laying Polished Granite 20mm 2.2 m2
thick. Absolutely black for vanity/work top/
pantry, laid on 20 mm thick cement sand 1:3
screed level off using cement slurry.net area
will be measured . (Prime Cost Rs. 2200 per 1
Sq.ft of granite)
B.8.10 Preparation of Dripped Edge at roof slab as 20 m
instructed by Architect.
FLOOR AND WALL FINISHES CARRIED
TO SUMMARY
B.9 PAINTING AND DECORATION
The contractor is requested to refer Conditions Note
of Contract, Specifications, Drawings, General
Notes, Pricing Preambles, and all other relevant
documents prior to pricing of the following
items.
Rate shall include for supply, preparation of Note
surface cleaning down, smoothing, knotting,
stepping etc. protection of floors and fitting,
removing & replacing door and window,
furniture, and cleaning windows etc. upon
completion.
Paint shall be from CIC or better quality Note
approved by Engineer
B.9.1 External wall
Prepare and apply two coats of elastomeric
primer and two coats of weather shield paint as
per manufacture and to the design to Engineer's
B.9.1.1 m2
In Ground floor level 105
B.9.1.2 In Water Tank Level 20 m2
B.9.1.3 Prepare and apply two coats of elastomeric and 10 m2
two coats of weather shield paint as per
manufacture and to the design to Engineer's
satisfaction Rate is included for preparing the
surface with approved weather proof skim coat
B.9.2 Internal wall
Prepare and apply one coat of primer and two
coats of emulsion paint of approved Colour and
quality to internal faces of walls. Rate is
included for preparing the surface with
approved skim coat.
B.9.2.1 110 m2
In Ground floor level
B.9.2.2 20 m2
In Water Tank Level
B.9.3
Soffit and Beams
B.9.3.1 Painting the soffit / side of the slab, beams, 115 m2
staircase with one coat of primer and two coats
of Emulsion Rate is included for preparing the
surface with skim coat.
PAINTING AND DECORATION
CARRIED TO SUMMARY
B.10
ELECTRICAL WORKS
Rates in Bill of Quantities shall include all Note
necessary materials (Cables, conduits, PVC
sunk box, bulbs switches etc.) and labour
required to complete the electrical installation to
good working order.
Rates for all items shall be inclusive of
following
a) Provisions of holes, chases......Etc.
b) All necessary of Scaffoldings.
c) Contractor's overheads & profits.
Cables, enclosures connectors, nuts terminals, Note
Fittings and all Accessories should be able to
withstand the Environmental condition at the
premises.
All types of fittings, materials, painting and Note
finishes shall be approved by the Engineer prior
to installation.
The whole installation shall be carried out Note
according to IEE wiring regulations 18th
edition.
Shall include to securely concealed each and Note
every exposed cable contact points connector
bars of the fittings, connector bars of the point
wiring, etc. using approved mastic tape of
every new fitting and new holder termination
points. (Prevent oxidation of CU parts due to
salty condition at the premises)
Rate shall include to clean all contact of the Note
point wiring using approved contact cleaner
prior to fixing the fitting.
Consumer units
Supply and installation of single phase and Note
neutral wall mounted sunk type consumer units
(CU) complete with plastic enclosure and
cover.
CU shall include incoming isolating switch? Note
MCB, RCD, outgoing MCBs, bus bars,
terminals. Mounting rails and all required
accessories.
Make of MCBs RCD and isolator shall be Note
European make or equivalent approved be
engineer.
B.10.1
CU – G (Ground floor)
B.10.1.1 1 no. 2 pole, 20A< MCB {INCOMER} 1 no. 1 nr
of 2 pole, 40A, 30mA RCD 10 NOS. of 1
pole, 6A?16A MCBs
B.10.2
Cables
Supply and installation (with all materials
required including conduits and termination) of
following PVC and XLPE insulated cable.
B.10.2.1 20 m
6mm2 CU/PVC/PVC 2C cable.
B.10.3
Erath cable
Supply and installation (with all materials
required including conduits and termination) of
following PVC insulated earth cables.
B.10.3.1 6mm2 CU/PVC 1C earth cable. 10 m
B.10.4 Earth rod & Accessories
Supply and installation of copper clad steel earth Note
electrodes and cooper earth conductors and
provide building earth with earth resistance
complying with the regulations.
B.10.4.1 16mm dia 1.2m long copper bonded steel earth 1 Item
electrode driven into the earth with clamp
connection to earth conductor and accessories.
B.10.4.2 In-site concrete Earthing pit of 300mm (L) x 1 Item
300mm (W) x 200mm (D) and with a 50mm
thick removable concrete lid.
B.10.5 Socket outlets
Note
Make of socket outlets shall be SLS certified
approved by engineer.
Rate to include for all cables, conduits, conduit Note
boxes and all accessories.
B.10.5.1 Supply & installation of 13A power socket 5 nr
outlet with 2.5sqmm Cu PVC/PVC cable in
radial circuits and 2.5sq Cu PVC earth wire,
drawn through the concealed PVC conduits,
from the respective consumer units.
Wiring of light points
Wring includes supply of required cables and Note
accessories, flush switch and all other required
Rate shall include to clean to all contact of the Note
point wiring using approved contact cleaner
prior to fixing the fitting.
B.10.6 Light point wiring
B.10.6.1 Wiring (including supply of the all material & 38 nr
switch) OF THE LIGHT POINT USING
APPROVED TYPE 1.0 MM2 Cu
/PVC/PVC+1.5MM2, Cu/PVC earth cables
drawn through securely fixed concealed PVC
conduits.
B.10.7 Lights & fittings
Lights fitting shall be of the highest quality and Note
each type of lights fitting shall be subject to the
approval of the engineer.
All the holders, connectors, internal cables Note
should be made out of high-quality Cu
material, high quality brass terminals and
screws have high conductivity manufactured
according to BS/SLS standards LED shall be
European equivalent make.
LED should have minimum 2 year Warranty Note
for defects.
B.10.7.1 Supply and installation of soft mounted 7W 25 nr
LED lamp with Diecast aluminum?
Polycarbonate housing and all other accessories
required. (prime cost – 5,000)
B.10.7.2 Supply and installation of mirror lamp 2 nr
containing 5W LED and all other accessories
required. (prime cost-2,500)
B.10.7.3 Supply and installation of bulkhead type light 10 nr
with die cast aluminum housing 11W CFL and
all other ACCESSORIES REQUIRED
(outdoor weatherproof type (prime cost
5,000)
B.10.8 Inspection and testing
B.10.8.1 Testing the installation of the system and 1 Item
rectify any defects and submit a certificate by a
chartered electrical engineer. (Mega Testing)
ELECTRICAL WORKS CARRIED TO
SUMMARY

B.11 METAL WORK


Rate shall include for applying all G.I. pipes Note
with 2 coats of enamel paint (spray painted) over
a coat of etch primer
B.11.1
Metal Ladder
B.11.1.1 Supply and fix 4000mm height G.I. ladder. Rate 1 nr
shall include for marine paint. As per the
Engineer's specifications.
B.11.1.2 Supply and fix 7050mm height G.I. ladder. Rate 1 nr
shall include for marine paint. As per the
Engineer's specifications.
B.11.2
Handrail
B.11.2.1 Supply and installation of 18000mm length 18 m
handrail, Lanwa GI 50mm × 50mm square tube
Bars with the wall thk of 1.3mm As per the
Engineer's specifications.
METAL WORKS CARRIED TO
SUMMARY
CONSTRUCTION OF WASHROOM
CARRIED TO
SUMMARY

Construction of Changing Room with Casual Toilets and Showers for Public Use at the
Premises of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quantities (BOQ)
BILL NO. B - SUMMARY CONSTRUCTION OF WASHROOM
ITEM DESCRIPTION AMOUNT RS
B.1 SITE PREPERATION
B.2 EXCAVATION AND EARTHWORK
B.3 CONCRETE WORKS
B.4 MASONARY WORKS
B.5 WATER PROOFING
B.6 CARPENTRY WORK
B.7 PLUMBING/SANITARY INSTALLATION
B.8 FLOOR/WALL AND CELING FINISHING
B.9 PAINTING
B.10 ELECTRICAL INSTALLATION
B.11 METAL WORKS
SUB TOTAL OFF BILL NO. B - CARRIED GRAND SUMMARY
Construction of Changing Room with Casual Toilets and Showers for Public Use at the
Premises of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quantities (BOQ)
BILL NO. C- EXTERNAL WORKS
UNIT
ITEM
DESCRIPTION QTY. UNIT RATE AMOUNT (RS)
NO.
(RS)
C EXCAVATION AND EARTH WORKS
The tenderers are requested to refer the general Note
notes given under Excavation & Earth works in
B.2
C.1.1 EXCAVATION
Excavation for foundation in any material 18 m3
except rock requiring blasting up to a depth of
1.5m from existing level in followings Rate is
C.1.1.1 included for working space.
C.1.2 Filling
20 m3
Filling with approved imported earth to make
up levels in 150mm thick layers well rammed
and consolidate at given gradient for ground
preparation works. (Well compacted to achieve
C.1.2.1 98% or more compaction.)
SITE PREPERATION & EXCAVATION WORK
CARRIED TO SUMMARY
C.2 CONCRETE WORKS
The tenderers are requested to refer the general Note
notes given under concrete works in B.3
50mm thick Grade 15 mass concrete under 54 m2
C.2.1 foundation.
Grade 20 Concrete in followings
23 m3
C.2.2 In Ground floor beam
C.2.3 FORM WORK
The tenderers are requested to refer the general Note
notes given under Form works in B.3.4
C.2.3.1 12mm thk plywood form work 180 m2
CONCRETE WORK CARRIED TO SUMMARY
C.3 MISCELLENIOUS WORK
LANDSCAPING WORKS
An approved variety of healthy plants well Note
growth and well formed.
Tamping and watering daily until the plant Note
growth is taken roots and is established.
Rate shall be included for 3 months of Note
maintenance period including watering,
weeding, fertilizing etc.
C.3.1 Trees and Plants
Note
Supply and planting good quality plant and trees
as specified. Rate shall be included for
necessary soil, growing media (coir dust and
suitable fertilizer), watering.
Planting two separate parallel line of Thakkada Note
plant as per Engineer's Instructions.
Dam Trees (1500mm-2000 height) root bolted
C.3.1.1
trees
C.3.1.2 Thakkada Plant (300mm - 450mm height) Nos. Rate Only

C.3.1.3 Supply and placing of "boralu " approx. 50mm m3 Rate Only
thick layer on finished ground
LANDSCAPING WORKS CARRIED TO SUMMARY
C.4 PAVING AREAS
Rate shall be included for placing of 35 mm-50
mm quarry dust / fine sand base course
Nos. Rate Only
including site preparation such as trimming
leveling compact with plate compactor.
Supply, placing & compaction of ABC layer 16 m3
C.4.1 98% density in specified areas as per the details
drawings
Supply and laying of Type Eliana, natural 75 m2
C.4.2 paving blocks size 100mm × 100mm × 60mm
(Minimum crushing strength 15N/mm2) as per
the instruction & detail drawing.
Supply and laying of 300mm × 300mm × 75mm
C.4.3 concrete step blocks laid on compacted earth Nos. Rate only
surface complete.
C.4.4 PLACING OF CURB
Supply & Laying path edge curb in specified 100 m
area. (0.600m × 50m × 150m) including
C.4.4.1
necessary concrete to place the Curb as per the
detail drawings.
C.4.4.2 TURFING m2 Rate only
MISCELLENIOUS WORK CARRIED TO SUMMARY

Construction of Changing Room with Casual Toilets and Showers for Public Use at the
Premises of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quantities (BOQ)
BILL NO. C- EXTERNAL WORKS
ITEM DESCRIPTION AMOUNT RS
C.1 EXCAVATION AND EARTHWORK
C.2 CONCRETE WORKS
C.3 SOFT LANDSCAPING
C.4 PAVING AREAS & PLACING OF CURB
SUB TOTAL “C” CARRIED TO GRAND SUMMARY
Construction of Changing Room with Casual Toilets and Showers for Public Use at the Premises
of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quantities (BOQ)
BILL NO. D- PROVISIONAL SUM
ITEM UNIT RATE
DESCRIPTION QTY. UNIT AMOUNT (RS)
NO. (RS)
D PROVISINAL SUM
D.1 Allow provisional sum for providing a Pro.sum 20,000.00
Performance Security as specified (refers
to boq item A.1)
D.2 Allow provisional sum for providing an Pro.sum 100,000.00
Advanced Payment Security as specified
(refers to boq item A.2)
D.3 Pro.sum 20,000.00
Allow provisional sum for insurance of
Works, Machinery & Equipment, Plant,
Materials, third party persons & property
and Employer’s personnel & property at
site as per the Contact (refer to boq item
A.3)
D.4 Allow provisional sum for insurance Pro.sum 5,000.00
against accidents and injury to
Contractor’s personnel as per the Contract
(refer the boq item A.4)
D.5 Allow sum for supply & installation of Pro.sum 200,000.00
Booster Pump with all necessary
accessories as directed by the Engineer.
D.6 Allow sum for chain link fence Pro.sum 200,000.00
D.7 Allow provisional sum for any other Pro.sum 100,000.00
unforeseen work arises during
construction phase due to unavoidable
reason.
SUB TOTAL OF PROVISIONAL SUM
645,000.00
CARRIED TO SUMMARY
Construction of Changing Room with Casual Toilets and Showers for Public Use at the
Premises of Sulanka Bangalow - NHR Benthota
Contract No: SLTDA/RM/W/NCB/Sulanka - Development/2021/18
Bill of Quamtities (BOQ)
BILL
DESCRIPTION AMOUNT RS
NO.
A PRELIMINARIES

B CONSTRUCTION OF WASHROOM

C EXTERNAL WORKS
D PROVISIONAL SUM 645,000.00
SUB TOTAL 2
( - ) Discounts (if any)
SUB TOTAL 3
Contingencies (10%)
SUB TOTAL 3 (Excluding VAT)
(+) Applicable VAT %
GRAND TOTAL

VAT Registration Number : ………..……………….


(A copy of the VAT Registration form should be annexed).

Name of Bidder :
........................................................................................................................
[insert complete name of Bidder]

Signature of Bidder : .............................................................

[signature of person signing the Bid]

Seal : ....................................................................................

Date : .......................................................

You might also like