STR SCT 4-Daily Plan-Consolidated RFI On 11-03-2024
STR SCT 4-Daily Plan-Consolidated RFI On 11-03-2024
Improvement and Maintenance of the National Road 13 South, Section 4 (Length 78 km) from (km 268+000) to (km 346+000) in Khammouane Province
RFI Summary
Submission Date: January
Chainage
Length Inspection Inspection Name of the
RFI No. Department Description Side Contact No Remarks Status Item
From To (m) Date Time Contact person
II.Structure:
the work it is
Pouring Concrete 15 Mpa and Take not ready on
Sample for Boxculvert Extension 12/1/2024 and
NR13P4/STR/852 STR 337+774 RHS 13/1/2024 10:00AM Mr. Souliyanh 2098219622
Cement Concrete Lean of Bottom Continue to
Slab and Apron, Km 337+774 LHS have plan on
13/1/2024
Unsuccessful
construction
area on 05-2-
Pouring Concrete 25 Mpa and Take
NR13P4/STR/937 STR 334+150 334+200 LHS 50 6/2/2024 10:00AM Mr.Khamhou 2056806347 2024 and
Sample for Wall U Ditches
continue to have
request on 06-2-
2024