The inspection report summarizes an inspection of the IKEA Sukhuvit project conducted on August 18, 2023. The inspection covered the mechanical, electrical, automatic control, and waste water treatment functions. Photos were taken before and after the inspection showing tube markings and breakers that needed to be replaced with dustproof models. The photos were reviewed and approved by various project roles including the foreman, site engineer, site manager, and project manager.
The inspection report summarizes an inspection of the IKEA Sukhuvit project conducted on August 18, 2023. The inspection covered the mechanical, electrical, automatic control, and waste water treatment functions. Photos were taken before and after the inspection showing tube markings and breakers that needed to be replaced with dustproof models. The photos were reviewed and approved by various project roles including the foreman, site engineer, site manager, and project manager.
The inspection report summarizes an inspection of the IKEA Sukhuvit project conducted on August 18, 2023. The inspection covered the mechanical, electrical, automatic control, and waste water treatment functions. Photos were taken before and after the inspection showing tube markings and breakers that needed to be replaced with dustproof models. The photos were reviewed and approved by various project roles including the foreman, site engineer, site manager, and project manager.
The inspection report summarizes an inspection of the IKEA Sukhuvit project conducted on August 18, 2023. The inspection covered the mechanical, electrical, automatic control, and waste water treatment functions. Photos were taken before and after the inspection showing tube markings and breakers that needed to be replaced with dustproof models. The photos were reviewed and approved by various project roles including the foreman, site engineer, site manager, and project manager.
INSPECTOR : MR. SAKSIPONG, MR. KEERATI, MR. PANUWATT INSPECTION DATE : 18-Aug-23 FUNCTION : Mechanical Electrical Automatic control Waste Water Treatment
PHOTO REPORT INSPECTION
BEFORE AFTER
EE ROOM 01 (M-3PB1A) Tube mark
EE ROOM 01 (M-3PB3A) ใสเ่ บรกเกอร์ผด
ิ (เปลีย ่ นเป็ นแบบกันดูด)
EE ROOM 01 (M-3EPB2A) Tube mark
EE ROOM 02 (M-3PB3B) ใสเ่ บรกเกอร์ผด
ิ (เปลีย ่ นเป็ นแบบกันดูด)
PHOTO BY CHECKED BY VERIFY BY APPROVED BY
FORMEMAN / ENGINEER SITE ENGINEER SITE MANAGER PROJECT MANAGER
DATE DATE DATE DATE INSEPCTION REPORT PROJECT NAME : IKEA SUKHUMVIT (BKK3) INSPECTOR : MR. SAKSIPONG, MR. KEERATI, MR. PANUWATT INSPECTION DATE : 18-Aug-23 FUNCTION : Mechanical Electrical Automatic control Waste Water Treatment
PHOTO REPORT INSPECTION
BEFORE AFTER
EE ROOM 02 (M-3EPB4B) Tube mark
EE ROOM 03 (M-3EPB3C) Tube mark
PHOTO BY CHECKED BY VERIFY BY APPROVED BY
FORMEMAN / ENGINEER SITE ENGINEER SITE MANAGER PROJECT MANAGER