Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

WORKS COMPLETION, UNIT DEFECTS & QUALITY ASSESSMENT

MECHANICAL & ELECTRICAL WORKS


Project: CADANGAN PEMBANGUNAN 502 UNIT PERUMAHAN PR1MA DI
ATAS SEBAHAGIAN LOT CL. 025359700, KINARUT, SABAH
Attention: VISALAND SDN. BHD

Reference
Number:
Date of Time of
Inspection: Inspection:
Location:
Scope of
Inspection: PHYSICAL
ITEMS ELEMENT COMPLETION REMARKS
1 Electrical Services
2 Sanitary Services
3 Cold Water Services

Remarks:
 All items are inspected based upon assessor’s visual observation & instrumental
methods in compliance with QLASSIC standard operating procedure.
 All defects indicated must be rectified within 14 days after issuance of this document.

JOINT INSPECTION / WITNESS


Prepared & Inspected By: Checked By: Received By:

Signature:

Name: Name: Name:


Date: Date: Date:
Position: Position: Position:

You might also like