Who is accountable for making
1. Routine activities and situations create - Reactive Controls
Likelihood
sure the controls and monitors are:
List specific activities to be performed taking hazards through day-to-day operations Who is exposed to the hazard The frequency and duration the (controls implemented to reduce the immediate impact of the RCE
Anything with potential to cause of harm. A chance that injury , ill health or damage could Safety or - in place, Consider the worse case scenario
into consideration the equipment to be used, and normal # # What causes the risk to come into effect? i.e. visitors, members of the person/group is exposed to the hazard e.g. risk occurring) Risk Control
Note: A hazard can pose more than one risk. occur as a result of uncontrolled hazard. health - implemented, without controls?
the personnel involved in the task. work activities; public, etc. Daily for 3 hrs. Effectiveness
- regularly reviewed for
2. Non-routine activities and situations Elimination
effectiveness.
are occasional or unplanned; Substitution
Engineering controls
Administrative controls
Personal protective equipment (PPE)
Next Review Date Template identifier: 240-70044602
(every 2 years):
me:
Document identifier R Safety 1A Fully effective I
gnation: II
Revision number: 1 N Health 2B Mostly effective
ed: III
Revision date: 31-May-24 3C Mostly ineffective
e: IV
4D None
5E
Additional Controls or Tasks Aimed at improving Existing Legal and Other Integrated Risk Management (IRM)
Monitoring Mechanisms Control Owner Target Date Current Status
Controls Requirements reference number
Include:
- Preventative Controls
(controls implemented to eliminate hazards or reduce the
likelihood of the risk occurring), and
How we know if we are
- Reactive Controls
succeeding. Include comments on Where relevant, list the
(controls implemented to reduce the immediate impact of the Person allocated the Once a date has been Pending, Where applicable, add IRM system
effectiveness. relevant legislative and or
risk occurring) responsibility for implementing agreed to, this can not be In Progress, reference number for tracking of 6 III II I I I
This may include i.e. Eskom requirements that
the agreed controls changed Complete treatment actions.
measurements, inspections, prescribe the control.
Consequences
Elimination
supervision where necessary.
Substitution
Engineering controls
Administrative controls
Personal protective equipment (PPE)
5 III II II I I
4 IV III II I I
3 IV III II II I
2 IV IV III II II
1 IV IV III III III
A B C D E
Likelihood
Occupational Health and Safety Baseline risk assess
Business/Operating unit:
Date:
Authorised by:
Name:
Document identifier
Designation:
Revision number: 1
Signed:
Revision date: 31-May-24
Date:
Consequence
- Reactive Controls
Likelihood
Where relevant, list the
(controls implemented to reduce the immediate impact of the RCE Person allocated the
relevant legislative and or
risk occurring) Risk Control responsibility for implementing
Eskom requirements that
Effectiveness the agreed controls
prescribe the control.
Elimination
Substitution
Engineering controls
Administrative controls
Personal protective equipment (PPE)
Consequences
5 III II II I I
4 IV III II I I
3 IV III II II I
2 IV IV III II II
1 IV IV III III III
A B C D E
Likelihood
R Safety 1A Fully effective I
II
N Health 2B Mostly effective
III
3C Mostly ineffective
IV
4D None
5E
6
Consequence rating
5
6
Consequence criteria
Description
Lost Time Injury. Irreversible health effects/occupational disease with permanent consequence
§ < 5% probability.
§ Could occur in “years to decades”
Short periods of time, a few times per
B Unlikely § May occur but not anticipated day/ intermittent (once in six months,
three months, or a month)
§ ≥ 5% and < 20% probability.
§ ≥ 90% probability.
Probability of exceeding OEL
Fully effective
Mostly effective
Mostly ineffective
None
SK CONTROL EFFECTIVENESS GUIDE
Guide
Nothing more to be done except review and monitor the existing controls.
Controls are well designed for the risk, are largely preventive and address
the root causes. Management believes that they are effective and reliable
at all times. Reactive controls only support preventive controls.
Most controls are designed correctly and are in place and effective. Some
more work to be done to improve operating effectiveness or management
has doubts about operational effectiveness and reliability of the controls.
While the design of controls may be largely correct in that they treat most
of the root causes of the risk, they are not currently operationally very
effective. There may be an over-reliance on reactive controls, or some of
the controls do not seem correctly designed in that they do not treat root
Virtually no credible control. Management has no confidence that any
degree of control is being achieved.
RISK MATRIX
6 I I
5 II II
Consequences
4 III III
3 IV III
2 IV IV
1 IV IV
A B
Likelihood
II I I
II I I
II II I
III II II
Action required