ROAD HAZARDS SURVEY IDC - 38 From ZB-481 To ZB-504 - Compressed
ROAD HAZARDS SURVEY IDC - 38 From ZB-481 To ZB-504 - Compressed
IDC – 38
By: IBD
Page 1 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 ZB-504
1. Table of Contents
2. INTRODUCTION ......................................................................................... 3
3. OBJECTIVE.................................................................................................. 3
4. PREPARATIONS & PROCEDURES .......................................................... 4
5. MOVE DETAILS:................................................................................. 5
6. ROAD HAZARDS SURVEY ...................................................................... 7
7. MEDICAL COVERAGE PLAN:................................................................ 50
8. RIG MOVER REQUIREMENTS .............................................................. 50
9. HAZARD ANALYSIS ............................................................................. 51
10. SAFE DRIVING PRACTICES ................................................................ 53
11. COMMUNICATIONS ..................................................................................54
Page 2 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
2. INTRODUCTION:
Rig and camp footprint will be marked a day prior to the move and this
area will be kept out of bound for all vehicles. All obstacles/objects shall be
cleared from this area.
3. OBJECTIVE:
Page 3 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
Page 4 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
5. MOVE DETAILS:
Page 5 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
Check Point
Rail Road
Page 6 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
Page 7 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 8 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Right Turn
Page 9 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Left Turn
Page 10 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 11 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 12 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
DIST.FROM
ZB-481 TO ZB-504 DIST.TONEXT
Waypoint Hazard Control Type of road
POINT METER
• Slow down
paved road / two
P6 21.4KM 500 m Straight •Traffic control
directions
Straight
Page 13 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
DIST.FROM
ZB-481 TO ZB-504 DIST.TONEXT
Waypoint Hazard Control Type of road
POINT METER
• Slow down
paved road / two
P7 21.4KM 500 m Straight •Traffic control
directions
Page 14 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-608 TO ZB-504
DIST.FROM
ZB-481 TO ZB-504 DIST.TONEXT
Waypoint Hazard Control Type of road
POINT METER
Check Point
RiverCheck Point
Page 15 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type of road
ZB-481 TO ZB-504 POINT METER
• Slow down
paved road / two
P9 21.4KM 100 m Rail Road •Traffic control
• Stop for check
directions
Rail Road
Rail Road
Page 16 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type of road
ZB-481 TO ZB-504 POINT METER
Page 17 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type of road
ZB-481 TO ZB-504 POINT METER
• Slow down
paved road / one
P11 21.4KM 790 m .
Straight directions
Straight
Page 18 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
High tension 9m
Bridge
Page 19 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
left
Page 20 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
RIGHT TURN
Page 21 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Straight
Page 22 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Check Point
Page 23 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 24 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Straight
Page 25 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Left Turn
Page 26 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 27 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 28 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 29 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
High Tension 9m
Page 30 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 31 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
P25 21.4KM 100 m Traffic Right Turn • Slow down paved road / two
•Traffic control directions
Page 32 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 33 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 34 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 35 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 36 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Height 9 meters
Page 37 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 38 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 39 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 40 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 41 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
DIST.FROM DIST.TONEXT
Waypoint Hazard Control Type ofroad
ZB-481 TO ZB-504 POINT METER
Page 42 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
To keep control, one of the competent local rig crew members will be
following the convoy on a soft skin to make sure Rig Mover follows the
convoy procedures.
Page 43 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
8. HAZARD ANALYSIS:
A Route Assessment has been carried out and the hazards and
controls have been mentioned in the “Road Survey” section of this plan.
HAZARD PREVENTION
Trucks backing into Ensure that all trucks have been
personnel & equipment inspected and have a reversing alarm.
Cranes swing around and Ensure that all cranes have been
the counterweight hitting inspected and have a swing alarm.
personnel and/or other
equipment
Loads swinging and/or Make sure that every load has two
spinning taglines attached prior to lifting.
Page 44 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
Page 45 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
10. COMMUNICATIONS:
Prepared By:
IBD: Logistic Department
Page 47 of 48
RIG MOVEMENT PLAN IDC-38 -ROAD SURVEY FROM ZB-481 TO ZB-504
Page 48 of 48