S/N DESCRIPTION QUANTITY UNIT

FIRE PUMP/WATER TREATMENT ROOM

1.11 INSITU CONCRETE WORKS ;

FORMWORK

Column;
Column;Sawn form work to sides of column 400mm x
A 400mm @ height of 3m from base slab 19 m2

B Sawn formwork to sides and suffit of column cap 31 m2

C Kickers;column 6 m

Reinforced Concrete wall;


Reinforced concrete wall ;sawn formwork to sides of
D wall ,height not exceeding 3m from base slab. 683 m2

E Kicker; walls 228 m

Roof deck;
F Edges of roof deck;not exceeding 200mm 94 m

G suffit of roof deck 540 m2


TO COLLECTION
RATE AMOUNT

1,700.00 32,640.00

1,700.00 52,700.00

340 2,176.00

1,700.00 1,161,015.00

340.00 77,401.00

340.00 31,892.00

1,700.00 917,966.00
###