Project: ETAP Page: 1

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard

3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 7 8

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total

Number of Branches: 1 0 0 6 0 0 7

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 1 0 0 0 1 2

System Frequency: 50.00

Unit System: Metric

Project Filename: EACP_VATIOTRON_BHP

Output Filename: C:\ETAP 2000\EACP_VATIOTRON_BHP\SC.SI2S


Project: ETAP Page: 2

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global 20

Cable / Busway Resistance: Yes Global 20


Project: ETAP Page: 3

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

344TGF001 Load 0.400 0.400 1 100.00 0.00


Barra SSAA Load 0.400 0.400 1 100.00 0.00
Bus6 Load 7.200 7.200 1 100.00 30.00
Bus7 Load 0.400 0.400 1 100.00 0.00
Bus8 SWNG 0.400 0.400 1 100.00 0.00
Enchufe P&C Load 7.200 7.200 1 100.00 30.00
PRIM TR Load 0.400 0.400 1 100.00 0.00
SEC TR Load 7.200 7.200 1 100.00 30.00

8 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: ETAP Page: 4

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens per 1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

Cable1 1,0MCUN1 240 16.0 0.0 16 20 0.0760755 0.0920000 0.0001703 0.2396378 0.2263200

Cable3 1,0MCUN1 240 16.0 0.0 16 20 0.0760755 0.0920000 0.0001703 0.2396378 0.2263200

Cable4 15NCUN1 2/0 16.0 0.0 1 20 0.2611460 0.4594779 0.0000706 0.2622400 0.5828195 0.0000706

Cable6 15NCUN1 2/0 6.0 0.0 1 20 0.2611460 0.4594779 0.0000706 0.2615579 0.3986822 0.0000706

Cable7 1,0MCUS1 2/0 16.0 0.0 11 20 0.3019963 0.0773732 0.0001649 0.7610501 0.2306977

Cable8 1,0MCUN1 70 6.0 0.0 2 20 0.2682250 0.1070000 0.0002174 0.8449087 0.2632200

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

344TF001 3.500 0.400 7.200 5.50 11.41 0 0 0 0 0 5.50 YNd 30.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary

ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm

344TF001 3.500 0.400 7.200 D/Y Solid


Project: ETAP Page: 6

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

344TF001 2W XFMR PRIM TR SEC TR 13.25 151.18 151.76

Cable1 Cable Bus8 344TGF001 4.75 5.75 7.46 0.0000070

Cable3 Cable 344TGF001 PRIM TR 4.75 5.75 7.46 0.0000070

Cable4 Cable SEC TR Bus6 0.81 1.42 1.63 0.0000586

Cable6 Cable Bus6 Enchufe P&C 0.30 0.53 0.61 0.0000220

Cable7 Cable 344TGF001 Bus7 27.45 7.03 28.34 0.0000046

Cable8 Cable 344TGF001 Barra SSAA 50.29 20.06 54.15 0.0000004


Project: ETAP Page: 7

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Synchronous Generator Input Data

% Impedance in Machine Base

Synchronous Generator Rating Xd" Grounding Excitation


ID Type MVA kV RPM % PF R Adj. Tol. R/X Xd, sat Conn. Type Amp Type

344DG001 Diesel 3.000 0.400 1500 80.00 1.600 18.30 0.0 0.09 278.00 Wye Solid 0.00 Sal-Pole 160%

Total Connected Synchronous Generators ( = 1,00 ) : 3,000 MVA


Project: ETAP Page: 8

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Lumped Load Input Data

Motor Loads
Lumped Load % Impedance
Rating % Load Loading (Machine Base) Grounding mFact.
Lumped Load ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP

PALA_PROPEL 1000.0 7.200 80.19 80.00 19 81 152.00 114.00 2.47 16.48 0.15 Delta 0.15

Total Connected Lumped Loads ( = 1 ): 1000.0 kVA


Project: ETAP Page: 9

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: 344TGF001


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
344TGF001 Total 0.00 27.580 0.00 92.07 97.26 36.021 36.021 5.36E+001 5.47E+002 5.60E+001 1.34E+002

Bus8 344TGF001 1.34 25.885 2.87 92.55 96.43 34.515 36.021 5.52E+001 5.83E+002 5.60E+001 1.34E+002

PRIM TR 344TGF001 0.09 1.697 0.08 92.06 97.28 1.506 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 0.00 0.000 0.00 92.07 97.26 0.000 0.000

Barra SSAA 344TGF001 0.00 0.000 0.00 92.07 97.26 0.000 0.000

344DG001 Bus8 105.00 25.885 105.00 105.00 105.00 34.515 36.021 5.05E+001 5.77E+002 4.10E+001 1.20E+002

SEC TR PRIM TR 1.86 1.697 53.58 107.28 56.25 1.506 0.000 1.31E+003 8.83E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.580 36.021 23.429 37.314
Peak Current (kA), Method C : 63.710 83.210 54.122 86.197
Breaking Current (kA, rms, symm) : 36.021 23.429 37.314
Steady State Current (kA, rms) : 8.648 36.021 23.429 37.314

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 10

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Barra SSAA


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Barra SSAA Total 0.00 26.293 0.00 84.47 110.88 32.032 32.032 1.04E+002 5.67E+002 2.14E+002 1.83E+002

344TGF001 Barra SSAA 9.86 26.293 20.27 89.15 103.35 32.032 32.032 1.04E+002 5.67E+002 2.14E+002 1.83E+002

Bus8 344TGF001 11.00 24.678 22.57 89.37 102.70 30.692 32.032 5.52E+001 5.83E+002 5.60E+001 1.34E+002

PRIM TR 344TGF001 9.93 1.618 20.33 89.15 103.37 1.339 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 9.86 0.000 20.27 89.15 103.35 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.293 32.032 22.242 34.973
Peak Current (kA), Method C : 58.970 71.840 49.884 78.437
Breaking Current (kA, rms, symm) : 32.032 22.242 34.973
Steady State Current (kA, rms) : 8.622 32.032 22.242 34.973

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 11

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Bus8


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Bus8 Total 0.00 27.853 0.00 92.82 95.79 36.841 36.841 4.94E+001 5.42E+002 4.10E+001 1.20E+002

344TGF001 Bus8 0.09 1.696 0.08 92.80 95.81 1.524 0.000 1.32E+003 8.84E+003

344DG001 Bus8 105.00 26.160 105.00 105.00 105.00 35.317 36.841 5.05E+001 5.77E+002 4.10E+001 1.20E+002

PRIM TR 344TGF001 0.18 1.696 0.16 92.79 95.84 1.524 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 0.09 0.000 0.08 92.80 95.81 0.000 0.000

Barra SSAA 344TGF001 0.09 0.000 0.08 92.80 95.81 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.853 36.841 23.668 38.099
Peak Current (kA), Method C : 64.799 85.709 55.062 88.638
Breaking Current (kA, rms, symm) : 36.841 23.668 38.099
Steady State Current (kA, rms) : 8.654 36.841 23.668 38.099

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 12

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Enchufe P&C


Nominal kV = 7.200
Voltage c Factor = 1.10 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Enchufe P&C Total 0.00 1.284 0.00 99.74 96.42 1.709 1.709 7.11E+001 6.83E+002 1.44E+001 1.53E+002

Bus6 Enchufe P&C 0.09 1.183 0.12 99.74 96.42 1.618 1.709 7.43E+001 7.42E+002 1.44E+001 1.53E+002

PALA_PROPEL Enchufe P&C 110.00 0.101 110.00 110.00 110.00 0.091 0.000 1.30E+003 8.67E+003

SEC TR Bus6 0.33 1.183 0.47 99.73 96.41 1.618 1.709 7.40E+001 7.41E+002 1.41E+001 1.53E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.284 1.709 1.095 1.764
Peak Current (kA), Method C : 2.990 3.980 2.551 4.108
Breaking Current (kA, rms, symm) : 1.709 1.095 1.764
Steady State Current (kA, rms) : 0.474 1.709 1.095 1.764

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 13

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: PRIM TR


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
PRIM TR Total 0.00 27.311 0.00 91.44 98.65 35.230 35.230 5.78E+001 5.52E+002 7.10E+001 1.48E+002

344TGF001 PRIM TR 1.32 25.614 2.81 91.87 97.84 33.741 35.230 6.00E+001 5.89E+002 7.10E+001 1.48E+002

SEC TR PRIM TR 1.79 1.698 53.26 107.31 57.03 1.489 0.000 1.31E+003 8.83E+003

Bus8 344TGF001 2.65 25.614 5.62 92.32 97.03 33.741 35.230 5.52E+001 5.83E+002 5.60E+001 1.34E+002

Bus7 344TGF001 1.32 0.000 2.81 91.87 97.84 0.000 0.000

Barra SSAA 344TGF001 1.32 0.000 2.81 91.87 97.84 0.000 0.000

Bus6 SEC TR 1.80 0.094 53.26 107.31 57.03 0.069 0.000 5.54E+003 6.84E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.311 35.230 23.195 36.548
Peak Current (kA), Method C : 62.658 80.827 53.215 83.853
Breaking Current (kA, rms, symm) : 35.230 23.195 36.548
Steady State Current (kA, rms) : 8.642 35.230 23.195 36.548

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 14

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: SEC TR


Nominal kV = 7.200
Voltage c Factor = 1.10 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
SEC TR Total 0.00 1.287 0.00 99.76 96.33 1.715 1.715 7.02E+001 6.82E+002 1.32E+001 1.51E+002

Bus6 SEC TR 0.02 0.101 0.02 99.76 96.33 0.091 0.000 1.30E+003 8.68E+003

PRIM TR SEC TR 22.46 1.186 59.21 64.43 111.71 1.625 1.715 * 7.32E+001 7.40E+002 1.32E+001 1.51E+002

Enchufe P&C Bus6 0.03 0.101 0.03 99.76 96.34 0.091 0.000 1.30E+003 8.68E+003

344TGF001 PRIM TR 23.37 21.357 59.91 64.38 111.71 16.371 0.000 3.20E+002 5.26E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.287 1.715 1.098 1.774
Peak Current (kA), Method C : 3.001 4.000 2.561 4.136
Breaking Current (kA, rms, symm) : 1.715 1.098 1.774
Steady State Current (kA, rms) : 0.474 1.715 1.098 1.774

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 15

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

344TGF001 0.400 27.580 63.710 8.648 36.021 83.210 36.021 36.021 23.429 54.122 23.429 23.429 37.314 86.197 37.314 37.314
Barra SSAA 0.400 26.293 58.970 8.622 32.032 71.840 32.032 32.032 22.242 49.884 22.242 22.242 34.973 78.437 34.973 34.973
Bus8 0.400 27.853 64.799 8.654 36.841 85.709 36.841 36.841 23.668 55.062 23.668 23.668 38.099 88.638 38.099 38.099
Enchufe P&C 7.200 1.284 2.990 0.474 1.709 3.980 1.709 1.709 1.095 2.551 1.095 1.095 1.764 4.108 1.764 1.764
PRIM TR 0.400 27.311 62.658 8.642 35.230 80.827 35.230 35.230 23.195 53.215 23.195 23.195 36.548 83.853 36.548 36.548
SEC TR 7.200 1.287 3.001 0.474 1.715 4.000 1.715 1.715 1.098 2.561 1.098 1.098 1.774 4.136 1.774 1.774

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: ETAP Page: 16

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)

ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

344TGF001 0.400 0.00086 0.00875 0.00879 0.00210 0.00893 0.00917 0.00090 0.00214 0.00232 0.00000 0.00000 0.00000

Barra SSAA 0.400 0.00166 0.00907 0.00922 0.00290 0.00925 0.00970 0.00343 0.00293 0.00451 0.00000 0.00000 0.00000

Bus8 0.400 0.00079 0.00867 0.00871 0.00203 0.00885 0.00908 0.00066 0.00192 0.00203 0.00000 0.00000 0.00000

Enchufe P&C 7.200 0.36874 3.54302 3.56216 0.75656 3.59894 3.67760 0.07445 0.79544 0.79892 0.00000 0.00000 0.00000

PRIM TR 0.400 0.00093 0.00883 0.00888 0.00216 0.00901 0.00927 0.00114 0.00237 0.00263 0.00000 0.00000 0.00000

SEC TR 7.200 0.36382 3.53453 3.55321 0.75184 3.59041 3.66828 0.06869 0.78372 0.78673 0.00000 0.00000 0.00000