Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RUBRO No. 3 PLANILLA No.

2
RUBRO No. 7 PLANILLA No. 2 RUBRO No. 8 PLANILLA No. 2 RUBRO No. 9 PLANILLA No. 2

RUBRO No. 1 PLANILLA No. 2


CIMIENTO MURO JUNTO A LAS GRADAS MURO JUNTO A LAS GRADAS (PANTALLA)
CASETA DE CLORACION

DESCANZO 1
TANQUE No. 1 LOSA NUEVA TANQUE No. 1 LOSA NUEVA
PLANTA CABLE
1 FLEXIBLE
MURO JUNTO AL TANQUE CANAL
MURO
ZAPATA
2 3 POSTERIOR 3 POSTERIOR
1
3
1LOSA 2 1LOSA 2
4

2 1 2 1
2
O O
AD AD
CABLE

5L 1 5L
FLEXIBLE
1 LOSA
DO
LOSA
DO FRENTE PARED FRONTAL

4L
A
4 LA
2 FRENTE 2 FRENTE
CABLE
FLEXIBLE
CANAL JUNTO AL MURO

0.20
CASETA BOMBA
0.30
CABLE
FLEXIBLE

MURO 4 4
DESCANZO 1
3 3
ZAPATA
5 A 5
RD HA
IE EC
PARED POSTERIOR PARED POSTERIOR QU ER
L IZ LD
DESCANZO 3 1 2 RA RA
DO DO
1
2 TE TE
3 LA LA LA LA
4

5
6
7

GRADA INGRESO

MURO TANQUE No. 2 CASETA BOMBA TANQUE No. 2 CASETA BOMBA

ZAPATA
3 POSTERIOR AREA
TAPA 3 POSTERIOR AREA
TAPA

CASETA CASETA

1LOSA 2 1LOSA 2
1 1
2 2
O O
AD LOSA PARED FRONTAL AD LOSA PARED FRONTAL

DO
1 4L O
1 4L
MURO JUNTO A LA CAPTACION
D
3 LA 3 LA
2 FRENTE 2 FRENTE
ZAPATA

GRADA INGRESO

3 4 CASETA BOMBA
FRENTE
CASETA BOMBA
POSTERIOR
CASETA BOMBA
LATERAL
3 4 CASETA BOMBA
FRENTE
CASETA BOMBA
POSTERIOR
CASETA BOMBA
LATERAL

0.40
2 2
1 DO 1 DO
DO LA DO LA
LA LA

TANQUE No. 3 CASETA CLORACION 1 TANQUE No. 3 CASETA CLORACION 1


AREA
LOSA 2 AREA
LOSA 2
3 POSTERIOR CASETA
3 POSTERIOR CASETA

TAPA PARED FRONTAL TAPA PARED FRONTAL


1LOSA 1LOSA
2 2
D O D O
1 4 LA 1 4 LA
O O
AD CASETA BOMBA CASETA BOMBA
AD CASETA BOMBA CASETA BOMBA

3L 3L
FRENTE POSTERIOR FRENTE POSTERIOR

2 FRENTE 2 FRENTE

4 4

3 3

3 3
2 2
DO CASETA BOMBA DO CASETA BOMBA

LA LATERAL
LA LATERAL

PARED POSTERIOR 1 PARED POSTERIOR 1


DO DO
LA LA

RUBRO No. 10 PLANILLA No. 2 RUBRO No. 11 PLANILLA No. 2 RUBRO No. 17 PLANILLA No. 2

TANQUE No. 1 LOSA NUEVA TANQUE No. 1 LOSA NUEVA

3 POSTERIOR 3 POSTERIOR

2 1LOSA 2 MURO JUNTO AL TANQUE

2 1 2 1
O O
AD AD
O
1 5L PISO PARED FRONTAL O
1 5L LOSA FRENTE
AD AD
4L 2 FRENTE 4L 2 FRENTE C

1
C
1 PISO
1 2 3
2

B
3
4 4 B

3 3 A B C

5 5 C B A
A

PARED POSTERIOR POSTERIOR A


1 2 1 2
DO DO DO DO 1 2 3
LA LA LA LA

1 2 3
PANTALLA MURO JUNTO A LA LAVANDERIA

CASETA DE CLORACION

TANQUE No. 2 CASETA BOMBA TANQUE No. 2 CASETA BOMBA


CABLE
FLEXIBLE

3 POSTERIOR 3 POSTERIOR TAPA


ZAPATA MURO JUNTO
AREA
CASETA A LA LAVANDERIA

2 1LOSA 2
2 1 2 1 CABLE

O O FLEXIBLE

AD PISO PARED FRONTAL AD LOSA FRENTE


O
1 4L O
1 4L
AD AD
Planilla de hierros

4L 3L
Peso Long. Long.
barra unitario de barra total de
2 FRENTE 2 FRENTE (mm) Mc A B C D E G kg/m (m) barra Kilaje
CABLE 12 12 1 0.00 0.12 5.93 0.12 0.00 0.00 0.89 6.12 73.38 65.16
FLEXIBLE estructural

1 PISO estructural
196 10 2 0.11 0.15 0.20 0.15 0.20 0.11 0.62 0.86 168.13 103.74

12 12 3 0.00 0.12 3.95 0.12 0.00 0.00 0.89 4.14 49.62 44.06
estructural
CASETA BOMBA
7 12 4 0.13 5.9 0.00 0 0.00 0.13 0.89 6.15 43.05 38.23
CABLE estructural
CIMIENTO MURO JUNTO A LAS GRADAS FLEXIBLE 11 12 5 0.13 3.95 0.00 0 0.00 0.13 0.89 4.2 46.2 41.03
estructural
14 12 6 0.00 0.11 1.97 0.11 0.00 0.00 0.89 2.14 30 26.64
estructural

4 5 3 4 CASETA BOMBA
FRENTE
CASETA BOMBA
POSTERIOR
CASETA BOMBA
LATERAL estructural
22 12 7 0.00 0.11 1.46 0.11 0.00 0.00 0.89 1.63 35.93 31.90

274 446.31 350.76

PARED POSTERIOR 2 2
1 DO 1 DO 2
DO LA DO LA
LA LA

TANQUE No. 3 CASETA CLORACION 1 TANQUE No. 3 CASETA CLORACION 1


PISO 2 LOSA 2 MURO JUNTO A LA CAPTACION
AREA

3 POSTERIOR 3 POSTERIOR CASETA

PARED FRONTAL TAPA PARED FRONTAL ZAPATA

1LOSA 1LOSA
2 2
D O D O
1 4 LA 1 4 LA
O O
AD AD CASETA BOMBA CASETA BOMBA

3L 3L
FRENTE POSTERIOR

2 FRENTE 2 FRENTE

4 4

3 3

0.40
3 3
2 2
DO DO CASETA BOMBA

LA LA LATERAL

PARED POSTERIOR 1 PARED POSTERIOR 1


DO DO
LA LA

RUBRO No. 1 RUBRO No. 2 RUBRO No. 2

LOSA TANQUE
ARMADO ACERO DE REFUERZO LOSA DE TANQUE
A B C LOSETA CUARTO
DE MAQUINAS COLUMNA
1 PANTALLA MURO JUNTO A LA LAVANDERIA
COLUMNA
C
1 2 3
4.20m
2.10m 2.10m

2 3.025

ZAPATA MURO JUNTO


A LA LAVANDERIA

6.05 B
DESCANZO 1
3

3.025
DESCANZO 2

DESCANZO 3

2.10 2.10

4.20

1 2 3

MURO JUNTO AL TANQUE

CIMIENTO MURO JUNTO AL TANQUE


0.55

MEJORAMIENTO DEL SISTEMA DE AGUA DE


0.50

0.45

CONSUMO HUMANO EN LA COMUNIDAD DE


BUSILCHE, PARROQUIA TIXAN, CANTON ALAUSI.

01
01

You might also like