CLIENT : COCA-COLA BEVERAGE PHILIPPINES, INC.

LEGEND :
NAME OF PROJECT : PROPOSED WAREHOUSE EXTENSION PHASE 1

LOCATION : CCBPI - Quezon City Distribution Center BUILDER FABRICATOR DESIGNER DEVELOPER PROPOSED :
P.O. NUMBER : 4501923459 Tels : 415-5686 / Fax : 414-5448

DATE STARTED : JULY 00, 2022 Email : jairoelynn@gmail.com / jose_junio@jairoelynn.com.ph

COMPLETION DATE : ACTUAL :


CONTRACT DURATION : 75 Calendar Days (BAR CHART / S-CURVE)
ACT. ACCOMPLISHMENT(%) JULY, 2022 AUGUST, 2022
DURATI
A C T I V I T I E S AMOUNT WEIGHT FACTOR (%) %
ON
NO. PREVIOUS PRESENT TO DATE 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

100.00%
1.0 GENERAL REQUIREMENTS 640,000.00 12.77 0.00 100 75 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
88.45
0.17
0.17
%0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
12.77

0.00

2.0 DEMOLITION / DISMANTLING WORKS 113,159.35 2.26 0.00 27 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
2.26

0.00
61.41%
3.0 EARTHWORKS 153,617.25 3.07 0.00 75 14 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
3.07

0.00

4.0 CIVIL WORKS 569,696.92 11.37 0.00 21 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54
11.37

0.00

5.0 STRUCTURALSTEEL/ROOF FRAMING 2,523,149.66 50.36 0.00 50 42 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
50.36

0.00

6.0 677,978.00 13.53 0.00 28 38.27% 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
13.53
ROOFING SHEETS AND BENDED ACCESSORIES
0.00

7.0 ELECTRICAL WORKS 332,395.00 6.63 0.00 13 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
6.63

25 0.00

TOTAL AMOUNT (VAT EX ) 11.52%


5,009,996.18 100.00 - - - 0.00

1.69% 0.00

0 0.00

NOTE / REMARKS: DATE PREPARED : June 24, 2022 NO. OF DAYS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 100.00

PREPARED BY : WEEKS 1 2 3 4 5 6 7 8 11 12 13

MARK ANTHONY DUSAL TARGET % 1.69 3.31 6.52 13.38 13.38 9.59 13.55 13.55 13.48 8.15 3.40

SITE ENGINEER TARG. CUM. 1.69 5.01 11.52 24.90 38.27 47.86 61.41 74.97 88.45 96.60 100.00

ACTUAL % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PEDRO TAGUINOD ACT. COM. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PROJECT ENGINEER VARIANCE

TARGET MANP. 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15

JOSE JUNIO ACT'L MANP. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0

PRESIDENT VARIANCE