BUDGETING OF SAFETY
DEFINITION OF BUDGETING
PLANNIN CONTROLLIN
G SCHEDULING G
A table described here about the
timing of the budgeting process
ELEMENTS TIMING OF TOOLS
APPLYING
Planning Before the start of Cash flow charts,
budget process Personnel data charts,
Estimates of time and
cost
Scheduling Before the start of Milestone charts, CPM
budget process and PERT networks,
Gantt charts
Controlling After the start of budget PERT charts, updating
process and resource allocation
on the basis of crash
costs, quantity of work
completed etc.
DIMENSIONS DESCRIPTION
WEARABLE TECHNOLOGY In the safety budget, basic dimension
we can consider the different new
technological devices like including of
smart watches, sensors, etc. This
technology can give correct and
accurate information about different
safety issues, also announcement
system can be introduced, thus
ductility is maintained and health of
many workers and trainees can be
saved in this process.
ERGONOMIC INTERVENTIONS We can analyse our surrounding
especially through the accident prone
areas by introducing the software
which would help in detecting any
problem occurring in any part of the
area.
DIMENSIONS DESCRIPTION
This would help in maintaining proper
atmosphere in the workplace, thus
saving lot of money and labour as well
as resources, moving the budget
network in right path.
WORKPLACE DESIGN Workplace design has a profound
impact on the productivity of workers.
Making the best use of space through
optimum placement of equipment,
integrating the human factor into
workplace design, and effectively
aligning the workplace into the
surrounding environment are
important aspects of ergonomics. This
ergonomic conditions can lower the
budget and maintain the critical
network path.
DIMENSIONS DESCRIPTION
LEADERSHIP DEVELOPMENT In safety management and budgeting,
proper leadership is one of the major
cause. Proper leader can only prepare
the budget network in the most
efficient way making it the max
probability of working, without being
crashed. This helps in proper cast
maintainance.
EMPLOYEE RELATIONSHIP Proper relationship between the
employees and the higher
management, allows the project to
continue within the critical path of
resources with min input of resources
and max outcome of profit by reducing
no of accidents and maintaining
proper health among workers.
TOOLS AND TERMS FOLLOWED
FOR SAFETY BUDGET NETWORK
Before starting a design of safety budget network, let us
discuss some terms regarding some tools followed in
network, given in the following table:-
DURATION
SERIAL CONCURRENT
texp=t0+4te+tp
6
Variance determined as σ2=tp-to
6
Now after following the expected time, the
critical path can be determined which will
be shown in the diagram
Now the expected time can be as defined
in 3 cases as:-
Case 1 :- texp= te which is possible only if
the te, to, tp are given in a common
interval.
Case 2:- texp>te
Case 3:- texp<te
The above 2 cases are possible when to,
tp, te are not given in common interval.
CRITICAL PATH METHOD(CPM)
THANK YOU