1. A work program and budget is required for the declaration of commerciality of a solar project. It involves studies on the market, technical aspects, land acquisition, modeling, engineering design, management, social and environmental impacts, and financing.
2. Key documents needed include a market study, resource simulation reports, land agreements, impact studies, engineering plans, management plans, permits, and connection agreements.
3. Financial modeling is done to estimate generation costs and proof of funding is required through documents like bank certificates or agreements.
Original Description:
Original Title
Work Program and Budgetary Requirement for the Declaration of Commerciality
1. A work program and budget is required for the declaration of commerciality of a solar project. It involves studies on the market, technical aspects, land acquisition, modeling, engineering design, management, social and environmental impacts, and financing.
2. Key documents needed include a market study, resource simulation reports, land agreements, impact studies, engineering plans, management plans, permits, and connection agreements.
3. Financial modeling is done to estimate generation costs and proof of funding is required through documents like bank certificates or agreements.
1. A work program and budget is required for the declaration of commerciality of a solar project. It involves studies on the market, technical aspects, land acquisition, modeling, engineering design, management, social and environmental impacts, and financing.
2. Key documents needed include a market study, resource simulation reports, land agreements, impact studies, engineering plans, management plans, permits, and connection agreements.
3. Financial modeling is done to estimate generation costs and proof of funding is required through documents like bank certificates or agreements.
Work Program and Budgetary Requirement for the Declaration of Commerciality
Before start of Construction
Title Documents Needed Remarks Declaration of Commerciality (letter)
1. Market Assessment Market study *FS (*Feasibility Study)
(Study and Recommendation) 2. Technical Study a. Solar data gathering, Irradiation data, climate data should procure/install/gather data of solar monitoring interpretation and system, etc. analysis b. Initial modeling and Preliminary Resource Simulation FS annual energy yield estimates c. Solar Resource review FS and preliminary assessment d. land class identification, LGU Zoning Certificate delineation and negotiation with landowners e. Land rights acquisition Land lease agreement (SLUP, FLAg, FSLA, MOA, Lease Agreement, etc.) f. Access & TL Right of MOU/MOA Way (FLAg, DPWH, MOA & Lease Agreement, etc.) g. Final modelling and Yield simulation report based on final technology options FS annual energy yield estimates h. Geotechnical Study Geotechnical Assessment report (for ground-mounted solar projects) i. Studies pertaining to interconnection requirements: ㆍ System Impact Study System Impact Study (SIS) and Results of SIS Review from NGCP 138KV Done (SIS) submitted to NGCP ㆍ Facility Study (FS) Facility Study (FS) and Results FS Review from NGCP j. Engineering Design Detailed Engineering Design All plans should be dully sealed and (Layout, Technical signed by registered professionals Drawings and Specification) ㆍ Panel Technical Details NEMO ENG FS (number of units, total area, capacity, other details) ㆍ structural descriptions / NEMO ENG FS frames and mounts ㆍ substation and transmission line (proposed) k. Bid documents Technical and Legal Biding preparation and Documents negotiation of EPC Contracts 3. Management Study O&M and Management Plan (Including proposals and contracts) 4. Social and Environmental Social and Environmental Study Assessment Report a. Public consultation and acquisition of LGU Resolutions b. DENR permits (ECC, ECC CNC) c. NCIP (CNO, CPC) NCIP report Applied d. Other applicable permits: (BOI, NWRB) ㆍ BOI Annual report Done ㆍ NWRB Proof of application Drilling permit ㆍ LGU Permits ㆍ DOLE 5. Financial Study a. Financial Modeling Financial model based on: Project cost, estimated gen cost Done AMT / Funding Fs BOI, DOE b. Proof of Funding Bank certificate, AFS, MOA Financial Agreement 6. Legal agreements pertaining to interconnection requirements a. Connection Agreement CA - Requires technical references on the metering, protection, etc. that (CA) with NGCP includes SIS and FS b. Transmission Service TSA- requires technical references on High voltage equipment/ protection & Agreement (TSA) with secondary device. NGCP Refer to OATS Rules Annex D, E that includes SIS (completed) and FS c. MOA/CSP/PPA Letter of Intent and proof of response from DU MOU Under Negotiation with CENECO