The document describes the assembly process and bill of materials for a wind turbine. It is broken down into 5 levels of assembly (Rakitan 1-5) with the components needed for each level. It also includes data on current inventory levels, components on order, lead times and whether each component is manufactured (MFG) or bought-out (BO).
The document describes the assembly process and bill of materials for a wind turbine. It is broken down into 5 levels of assembly (Rakitan 1-5) with the components needed for each level. It also includes data on current inventory levels, components on order, lead times and whether each component is manufactured (MFG) or bought-out (BO).
The document describes the assembly process and bill of materials for a wind turbine. It is broken down into 5 levels of assembly (Rakitan 1-5) with the components needed for each level. It also includes data on current inventory levels, components on order, lead times and whether each component is manufactured (MFG) or bought-out (BO).
Rakitan Nama Komponen Level Number Operasi Bantu Kerja WT.0012 Nacelle Body WT.0002 Mur Kecil A WT.0011 Generator WT.0002 Mur Kecil B Rakitan WT.0008 Gear Level Perakitan Obeng Perakitan 1 WT.0013 Nacelle Cover 3 WT.0003 Baut Sedang A WT.0003 Baut Sedang B WT.0003 Baut Sedang C WT.0003 Baut Sedang D Rakitan 1 WT.0006 Bearing A WT.0006 Bearing B Rakitan Level WT.0003 Baut Sedang E Perakitan Obeng Perakitan 2 2 WT.0003 Baut Sedang F WT.0003 Baut Sedang G WT.0003 Baut Sedang H WT.0001 Rotor Blade A WT.0001 Rotor Blade B WT.0001 Rotor Blade C Rakitan Level WT.0010 Rotor Hub Perakitan Obeng Perakitan 3 2 WT.0003 Baut Sedang I WT.0003 Baut Sedang J WT.0003 Baut Sedang K Rakitan 2 Rakitan 3 Rakitan WT.0005 Tail Boom Level Perakitan Obeng Perakitan 4 WT.0009 Tail Fin 1 WT.0004 Tower WT.0003 Baut Sedang L Rakitan 4 WT.0014 Ground WT.0015 Baut Konektor Bawah A Rakitan WT.0015 Baut Konektor Bawah B Level Perakitan Obeng Perakitan 5 WT.0015 Baut Konektor Bawah C 0 WT.0015 Baut Konektor Bawah D WT.0015 Baut Konektor Bawah E WT.0007 Konektor Tower Data Bill of Material Wind Turbine No. Part Number Nama Komponen Jumlah Komponen (Unit) Bahan MFG/BO 1 WT.0001 Rotor Blade 3 Polyethylene MFG 2 WT.0002 Mur Kecil 2 Besi BO 3 WT.0003 Mur Sedang 12 Besi BO 4 WT.0004 Tower 1 Polyethylene MFG 5 WT.0005 Tail Boom 1 Polyethylene MFG 6 WT.0006 Bearing 2 Polyethylene BO 7 WT.0007 Konektor Tower 2 Polyethylene BO 8 WT.0008 Gear 1 Besi MFG 9 WT.0009 Tail Fin 1 Polyethylene MFG 10 WT.0010 Rotor Hub 1 Polyethylene MFG 11 WT.0011 Generator 1 Polyethylene BO 12 WT.0012 Nacelle Body 1 Polyethylene MFG 13 WT.0013 Nacelle Cover 1 Polyethylene MFG 14 WT.0014 Ground 1 Polyethylene BO 15 WT.0015 Mur Konektor Bawah 5 Besi BO Data Item Master File Record Wind Turbine Current Nama Allocated On Order Due Date Lead Time Inventory MFG/BO Komponen Inventory (unit) (unit) (bulan) (bulan) (unit) Wind Turbine 81 13 2 MFG Rakitan 4 88 54 2 MFG Tail Fin 91 33 1 MFG Tail Boom 97 56 1 MFG Tower 72 52 2 MFG Rakitan 3 104 11 2 MFG Rakitan 2 115 18 2 MFG Rotor Blade 88 24 1 MFG Rotor Hub 116 47 2 MFG Rakitan 1 72 20 1 MFG Nacelle Body 94 42 2 MFG Gear 85 58 2 MFG Nacelle Cover 72 50 1 MFG Mur Kecil 82 16 70 50 1 BO Baut Sedang 118 32 46 52 1 (Rakitan 2) BO Baut Sedang 104 11 36 54 1 (Rakitan 3) BO Baut Sedang 94 48 49 49 2 (Rakitan 4) BO Bearing 92 16 41 51 1 BO Konektor Tower 114 28 45 55 2 BO Generator 79 48 35 53 1 BO Ground 117 49 61 51 2 BO Baut Konektor 90 42 53 53 1 BO