Boq DDC

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Date:03-03-2024

To
Mr. Aman
DDC, Mohakhali, Dhaka

Office Interior work & Cost estimation

Topics Detail Qua. unit Rate Amount

Working Top & Upper Cabinet


(12'X14') 2"X2", 1"X1" & 2"X1" Ms box 1 Job 175000 175,000.00
Framing with Powder Coated,
18mm & 12mm Melamine
board(Super/Akij/Equivalent)
palla & All hardware include.

Electrification All kind of electric work, 1 job 5000 5,000.00


necessery of cabinets with
BRB/BBS, Equivalent cable.

Grand Total 180,000.00

In Words: Taka Sixteen Lac eighty three thousand four hundred ninety only

Note: VAT & AIT not Included.

Rezaul Ahmed
Architect
Zenith Architects BD