1) The Superintending Engineer of GCC-I Chennai requests the Superintending Engineer of Protection and Communication Trichy to inspect 3 CRP panels for providing a new 110kV EHT service to M/s Cheyyar SEZ Developers.
2) The work was administratively approved and technically sanctioned to provide a maximum demand of 10,500KVA to M/s Cheyyar SEZ Developers located in Pelakuppam Village.
3) M/s Cheyyar SEZ Developers has paid Rs. 4,31,65,980 and requested inspection of the CRP panels which are located at M/s Voltech Manufacturing Company Pvt Ltd in Bangalore.
1) The Superintending Engineer of GCC-I Chennai requests the Superintending Engineer of Protection and Communication Trichy to inspect 3 CRP panels for providing a new 110kV EHT service to M/s Cheyyar SEZ Developers.
2) The work was administratively approved and technically sanctioned to provide a maximum demand of 10,500KVA to M/s Cheyyar SEZ Developers located in Pelakuppam Village.
3) M/s Cheyyar SEZ Developers has paid Rs. 4,31,65,980 and requested inspection of the CRP panels which are located at M/s Voltech Manufacturing Company Pvt Ltd in Bangalore.
1) The Superintending Engineer of GCC-I Chennai requests the Superintending Engineer of Protection and Communication Trichy to inspect 3 CRP panels for providing a new 110kV EHT service to M/s Cheyyar SEZ Developers.
2) The work was administratively approved and technically sanctioned to provide a maximum demand of 10,500KVA to M/s Cheyyar SEZ Developers located in Pelakuppam Village.
3) M/s Cheyyar SEZ Developers has paid Rs. 4,31,65,980 and requested inspection of the CRP panels which are located at M/s Voltech Manufacturing Company Pvt Ltd in Bangalore.
Er.R.M.Dinakar, B.Tech., The Superintending Engineer,
Superintending Engineer, Protection & Communication, General Construction Circle-I, Trichy. rd 230/110 KV GIS SS Campus, 3 floor, A-10, Thiru-vi-ka Industrial Estate, Guindy, Chennai – 32. Lr. No. SE/GCC-I/CNI/AEE/GL/AE/GL/F.Cheyyar SEZ/D. 1400 /2023, dt: 07.11.2023. Sir, Sub: GCC-I/Chennai – Extension of 1no New 110KV EHT Service at Pelakuppam Village for a maximum demand of 10500KVA to M/s Cheyyar SEZ Developers, Near Plot No:A1, Sipcot Industrial Park, Pelakuppam Village, Tindivanam, Villupuram District by making LILO arrangements for carrying out the entire extension works under Self-Execution – CRP panel- Inspection requested - Reg. Ref: 1.Circular Memo No.CFC.TR/FC/GL/DFC/Fin/TR/D.No.728/2022,Dt:11.08.2022. 2. Memo No: CE/Coml/SE/EE2/AEE2/F.M/s Cheyyar–New EHT/D:410/23, dt: 08.08.2023. 3. Memo.No.SE/VEDC/VPM/AEE/GL/CHD/TA/F.EHT Cheyyar /D.181/23-24, dt. 11.08.2023. 4. M/s Cheyyar SEZ Developers Pvt Ltd.,Lr.No.Nil, dt:13.10.2023. 5.Lr.No.EE/SSE/CNI/F/M/s.SEZ Cheyyar/D.No.581/23,Dt:26.10.2023. ******** The work of “Extension of 1no New 110KV EHT Service at Pelakuppam Village for a maximum demand of 10500KVA to M/s Cheyyar SEZ Developers, Near Plot No:A1, Sipcot Industrial Park, Pelakuppam Village, Tindivanam, Villupuram District” was administratively approved and technically sanctioned vide reference (2) and (3). Based on that M/s.Cheyyar SEZ Developers, have paid the amount of Rs.4,31,65,980/- on 21.08.2023 vide Doc.No.2350850561. M/s.Cheyyar SEZ has requested to inspect the CRP panel for the above subject work vide reference (4). The details of the materials are given below.
Sl. Description Qty Place of inspection
No M/s.Voltech Manufacturing Company Pvt Ltd., B-56, KSSIDC Industrial Estate, 1 CRP Panels 3 Nos Kumbalgodu, Banglore-560074. Contact Person: Mr.Janarthnan, Contact Number:9500023463. Hence, it is requested to depute one official from P&C wing to inspect above CRP panel for availing 110 KV EHT supply.
S/d..Er.R.M.Dinakar, B.Tech., dt:07.11.2023
SUPERINTENDING ENGINEER GCC-I/CHENNAI Copy submitted to the Chief Engineer/Transmission Projects-I/Chennai. -For kind information please. (By mail only) Copy to the Executive Engineer/SSE/Chennai. (By mail only)