MyCESMM2 Class F - Earthworks

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

.

EARAN

&...

o
88
on
^
I ,O 535 ^

.........,.
^

,,,,,,
,
.

..
.
^.,.
.
+
J

,,,
~....

,
I'"'

CLASS F
EARTHWORKS

MyCESMM2 I
LLD
Co ADDITIONAL -co^
CLASS F: EARTHWORKS MEASUREMENT RULES DEFINITION RULES COVERAGE RULES ^-
DESCRIPTION RULES
< o. <
^ Measurement covered under other classes: in or Cl A1 O 9: !!!
< in.
a The quantities of Earth shall be deemed items for excavation The commencing co Z r,
in earthwork shall be
co Geotextile and geogrid Oncluded in Class G: Geotechnical work). to be materials other shall be deemed to surface shall be
7=
= computed nett using than topsoil, natural include disposal of identified in the
= Site clearance <included in Class E Demolition and site clearance). ^'in
I. ,
dimension from the hard material. rock, excavated material description of each Noco
^^-
Excavation and backfill for drain and pipe in trenches Oncluded in drawings with no artificial hard material unless otherwise item or work involving Z do
Class O. Pi^ework and Class Q. ' Dr^hage work> allowance for bulking, or unsuitable material. stated. excavation for which "-
co=
shrinkage. or wastage unless otherwise stated the commencing Cto
Excavation for piles Included Oncluded in Class H. . Plying work) Where boundaries
^

in item description. C2 surface is not the co


^
Excavation for tunnels. shafts. heading and other sub. terranian cav Ies <1ncluded between different Items for excavation original surface. The to
.
In Class S: Tunnel work) materials are not 02 shall be deemed to excavated surface shall

Excavation for foundation for fences and gates (included in Class shown on the drawings, Natural hardmateria/ include up holding be identified in the co
40
Miscellaneous work) measurement shall be shall be material sides of excavation, description of each n
o
made on the site other than rock and additional excavation item of work Involving a
a
artificial hard material to provide working excavation for which
M2 that requires ripping space and removal of the excavated surface !^!
^

The commencing and other specialised dead services is not the original o
a
surface adopted in equipment. surface.
the preparation of C3
the bill of quantities 03 Items description for A2
shall be used for the Rock and artificial excavation shall be Item description for
measurement of the hard material shall deemed to include artificial hard material
completed work. be material that removal of existing shall state the material.
requires the use of pipes not exceeding and depth to which
M3 hydraulic rock breaker. 300 mm of any extent it shall be
An item shall be given pneumatic tools or material or diameter. excavated
for each separate stage explosives.
of excavation where As
separate stages in the 04 item description for
conduct of the work Disposal of excavated excavat, bn in rock shall
are expressly required material shall be state the method of
deemed to be disposal blasting. and whether
M4 off the site, unless for reuse or disposal.
Detached pieces of otherwise stated in
boulders shall only be item description. A4
regarded as natural Item description for
hard materia4 rock, or 05 excavation in natural
artificial hard material Sub-ballast shall be hard material and rock
if each individually ballast placed before shall state the method
exceeds 0.5 in' in the bottom ballast is of excavation, where Ci
volume and shall be laid appropriate. ;;
co
measured separately. co
71

in
>
=O
H
^
^:
o
23

MEASUREMENT RULES DEFINITION RULES Cov R G=RUL


CLASS F: EARTHWORKS D =SCRIPTION RUL . ,

Ms 06
An isolated volume of The commencing
-
Z
^
o
^

EAS REMENT RULES DEFINITION RULES COVERAGE RULES


DESCRIPTION RULES

Ms 06
An isolated volume of The commencing
artificial hard material surface shall be
or rock occuring within Identified un the
other material to be description of each
excavated shall not be item for work involving
measured separately excavation. boring. or
unless its volume driving for which the
exceeds I m' except commencing surface is
that the minimum not the original surface.
volume shall be 0.25
m' where the net width 07
of excavation is less The depths of
than 2 in. excavation stated in
accordance with the
work classification shall
be measured from the
commencing surface to
the excavated surface

FIRST DIVISION SECOND DIVISION THIRD DIVISION

I Topsoil M6 A5
I Excavation I Stripping
Area measured for Item description for
topsoil shall be the stripping of topsoil
plan area. shall state whether for
reuse or disposal.

A6
item description for
stripping shall state
the thickness of
excavation.

2 Cut to fill I Earth M7 08 C4 A7


3 Cut and dispose 2 Natural hard in item classed as Excavation to form items classified as Item description for
material excavation to remove a profile expressly excavation in cut shall excavation in cut
3 Rock ms unsuitable material required shall be be deemed to include shall state. where
4 Artificial hard ing shall be measured. classed as cut. transportation from expressly required,
material irrespective of the source to place of fill or the excavation to be
5 Unsuitable material ms method of excavation 09 disposal. carried out manually. Ci
in3 adopted by the Excavation in or under
6 Hazardous materials
contractor an embankment. CS A8
S;:
co
executed prior to Items classified as item description for co

placing of the fill, excavation in cut excavation in cut 71

= shall be classed as shall be deemed to for rock shall state in


^ >
in
excavat, bn in cut. include the trimming any requirement for .O
co and preparation of controlled blasting and H
^ =
excavated surface pre-splitting.
^ ^
N
o
^
7<
co
^ -co^
o ADDITIONAL
FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^"U
< a<
I Excavation MB D, O A9
= in a 61
^ The volume of disposal Hazardous material Item description for co Z c,
co-
in
of excavated material shall include any hazardous material
CJD 7=
^ measured shall be the material whose shall state the nature of ^C,
^ difference between excavation and the material. I'D 0 00
N ^^-

the total net volume of disposal is governed Z 'o


excavation and the net by legislation including A10 "-
an=
volume of excavated invasive plant species. Item description for cut cco
-.

material used for filling. and dispose shall state CD


^
D, , backfilling in layers and CD
=
Material, either artificial compaction. where
or natural. that are required. co
to
not to be used for the r,
o
works are classed as a
a
unsuitable material,
I^!
^

0,2 o
a
Disposal of excavated
material shall be
deemed to be disposal
off the site unless
otherwise stated in
item descriptions

4 Foundation I Earth ms M9 C6 All

2 Natural hard in3 The volume measured Items for excavation Excavation for
material for the excavation for for foundation shall foundation around
3 Rock ms foundat, bn shall be the include up holding pile shafts, and for
4 Artificial hard in
volume which is to be sides of excavation, underpinning. shall
material either occupied by or preparation of each be so described.
5 Unsuitable material ms vertically above any excavated surface.
part of the structure or additional excavation A12
building to provide working Item description
space and removal of for excavation for
dead services. foundat, bn to be
carried out under
water shall be so
described. C>

A13
^;
co
Maximum depth co
of excavation for r,

foundation shall be so in
described in the item >
=U
description ^
^
.^.
o

D =FINITION RULE

C7 A14
I Excavation 5 Under water M, O
Measurement of Items for excavation Item description for
excavation under under water shall be excavation under water
..
description. ^
^
^
o
^

COND DIVISION THIRD DIVISION MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES

I Excavation 5 Under water a, ,O C7 A14


Measurement of Items for excavation Item description for
excavation under under water shall be excavation under water
water shall be made deemed to include all shall identify the water
from soundings, unless necessary temporary body and the limit of
otherwise stated work. excavation.

M, ,
The volume measured
for excavat, bn below
a body of open water
shall be the nett
volume of excavation
commencing from
firm ground level such
as river or sea bed as
shown on the drawing
to which reference is
given in the preamble
in accordance with
414.

M, 2
Item classed as
excavation under water
shall be measured,
irrespective of the
method of excavation
adopted by the
contractor

6 Dredging I Provision of plant MIS C8 A's


and equipment Item classed as Provision of plant Item description for
2 Dredging work dredging shall be and equipment for dredging shall state
measured, irrespective dredging shall be the location and limits
of the method of deemed to include of dredging.
excavation by the mobilisation and
contractor. demobilisation
Ci
M, 4 C9
Measurement of items classified as
^:
co
co
dredging shall be made excavation by dredging
shall be deemed to 71
from sounding. unless
Z otherwise stated. in
< include transportation
c, >
in from source to disposal =O
co
site.
= =
^
re ^
o
=.
^
co
*. ADDITIONAL
-. co ^
1.1
FIRST DIVISION SECOND DIVISION THIRD 01VISl MEASUREMENT RULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES
^""
< o. <
MIS CIO A's O ^ !!!
I Excavation rig^
=
The volume measured Items coverage for item description for co Z c,
^'I
in
co
for dredging below a dredging shall be dredging shall state ^:^^.
body of open water deemed to include the location and limits ^'in
:=
= shall be the net any mopping up of silt of dredging. N 000
^^
N
volume of excavation which accumulates ^to
commencing from after the final surface
un.
firm ground level such has been reached cco
-,
do
as river or sea bed as ^
shown on the drawing co
.
to which reference is
given in the MsCESMM 01
to
in accordance with 4.14. a
o
=
a
", 6
;^!
Dredging to remove ^

o
silt shall be measured =
only to the extent that
is expressly required.
2 Excavation in3 M, 7 A16
I Double handling of I Earth
ancillaries excavated material 2 Natural hard m' Double handling of item description for
material excavated material excavation ancillaries
3 Rock ms shall be measured, only in connection with
4 Artificial hard m' to the extent that it is excavation by dredging
material expressly required shall be so described.

M, a
The volume measured
for double handling
of excavated material
shall be that of the
void formed in the
temporary stockpile
from which the
materials are removed

2 Timber support M, 9
left-in The volume measured
3 Metal support for excavation within C)
left-in borrow pits shall be the ;;:
co
net volume measured
co
for filling Tl

M20 I;!
The area measured =.
-
for timber or metal ^
supports left-in shall be ^.
the area of supported o
=.
surface for which the 7<
supports are expressly co
required to be left-in
, . ,, U, UV , . .~,,,. ~V

for timber or metal :^


Z
supports left-in shall be ^:
the area of supported o
f rwhi h =u

IRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMEN ULES DEFINITION RULES COVERAGE RULES
DESCRIPTION RULES

3 Filling , General I Excavated material in3 M21 DT3 C, I At7


2 Embankments 2 Imported material ms All fly"rig shall be Excavated material items for filling shall Item description for
3 Replacement 3 Mass concrete ms measured nett. shall be deemed to be deemed to include filling using imported
4 To structure 4 Other stated ms Excavation after be from cut, or from filling in layers and material and excavated
5 To stated depth or material in3 "filling" shall only be borrow pit on the site. compaction. material shall state
thickness measured where it is the type, gradation
6 Below water ing expressly required. 0,4 C, 2 limit and size where
Imported material Items for filling applicable.
M22 shall be deemed to be shall be deemed to
Excavation from material from off site. include additional Ale
borrow pit on the Site filling necessitated Item description for
for f, Tmg, shall not be 0.5 by settlement or filling using mass
measured separately. Filling shall be classed penetration into concrete shall state
unless expressly as to stated depth underlying material. the specification of
required. or thickness where concrete.
material is provided C, 3
M23 of uniform total Items for fil"rig to
The volume of compacted depth or embankments or on
imported material thickness such as in sloping ground shall
measured shall be the drainage blankets. be deemed to include
difference between the topsoiling, pitching benches.
nett volume of fill^^g and beaching. Bulk
and the nett volume filling shall not be
of excavated material classed as to stated
derived from work depth or thickness
within Classes F and S not withstanding that
used for filling. it may be compacted
in separate layers of
M24 material of stated
The volume of thickness.
imported fill shall be
measured nett at the
place of fill

M25
Backfill material for
excavation to remove
unsuitable material
shall be measured as
Ci
filling under item for
filling for replacement. ^;:
co
co
M26
Tl
When rock is
=
.<
r, deposited into soft ^!
in
co
areas, the volume shall ^
Z be measured as in the Z
=
re transport vehicle at the ^:
place of deposition. o
^
^
co
-coZ
:^: FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASUREMENT RULES EFINITION RULES COVERAGE RULES
ADDITIONAL
^""
DESCRIPTION RULES
< o. <
^ -.

^ 3 Filling M27
in=
^ Filling of excavation co^,
in
un
around completed ^.

^ structures shall ^ 8. in
Z be measured nett re oon
re - --
between the volume of ^to
excavation under rule
co=
M9 and the completed = 00
^

structure measured co
B
from the commencing co
.
surface.
Un
co
M28 et
o
Where filling is to be =
a
deposited below water.
I^!
and the quantity ^
^.
o
cannot be measured =
satisfactorily by
any other means.
the volume shall be
measured as in the
transport vehicle at the
place of deposition.
Where filling is by
pumping, the volume
shall be measured by
settlement plates
7 High energy impact I Selected excavated M29
compaction general material other than High energy impact
filling topsoil or rock compact, bn general
21mported natural finexisting ground
material other than shall be measured to
topsoil or rock the surface area to be
3 Existing ground treated.

C,

^:
co
co
,I

^:
=O
H
=
^:
o
=o
.

M30 0,6 C. 4 A19


4 Landscaping I Turfing
2 Hydroseeding Measurement for spot The girth of trees Items for landscaping item description for
""~^"~,. I ,,""'" bai 'rid. ,d h ball h PR^L, bal eemed Jandscaning a at
^
^
^:
o
^

FIRST DIVISION SECOND DIVISION THIRD DIVISION MEASURE E T RUL S DEFIN1 10N RULES COVERAGE RULES
DESCRIPTION RULES

4 Landscaping I Turfing MsO DIG C, 4 A19


2 Hydroseeding Measurement for spot The girth of trees Items for landscaping item description for
3 Bio-degradable turfing shall include the shall be measured shall be deemed landscaping shall state
erosion control areas of unturfed space from ground level to to Include digging, the species of the
blanket between the sods. one-third height of planting media, turfing, hydroseeding,
4 Hedges the trees or jin from bedding. stalking. hedges and trees
5 Trees Ms. ground level. whichever protection. watering. required.
The area of turfing and is lower. weeding, required
hydroseeding shall be fertilising, and A20
the area to the slope, if 0,7 replacement of Item description for
applicable. The height of trees dead items until turfing shall state the
shall be measured the vegetation is type of turfing (close
Ms2 from ground level to established. or spot).
Ungrown areas the lowest branch or
of turfing and crown, whichever is CIS A21
hydroseeding lower. Items for turfing on Item description for
exceeding I in' shall slopes steeper than hydroseeding shall
not be measured I lyertical) and 3 state the technical
(horizontal) shall be specification.
Mss deemed to include
The lengths of hedges pegging down with A22
measured shall be their stakes. Item description
developed lengths for bio-deg, adable
along the centre line. c, 6 erosion control blanket
Items for bio. shall state the location
M34 degradable erosion and the spacing of the
The area of bio. controlblanket shall fastening hook.
degradable erosion be deemed to include
control blanket shall fastening hooks and A23
be measured nett and netting required. Item description for
no allowance shall be trees shall state the
made for laps. minimum girth and
height.

A24
Item description for
landscaping and
hydroseeding shall
identify work upon
surface which is C,

inclined at an angle ;;:


co
exceeding 10' to the co
horizontal.
,I
Z
,:^
in
1:1
20
co H
^ ::r
^
re ^
o
a.
^
7<
Vl co