Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

The Five S's (5S)

Purpose: To remove waste, we turn to the five


The Seven Speed Bumps
Purpose: To accelerate flow, you will want to
Lean
Six Sigma
S's. The principles of reorganizing work so that it's eliminate the seven speed bumps which are consid-
simpler, more straightforward, and visually man- ered "Muda"—non-value added waste. Muda is any
ageable are: activity which absorbs money, time, and people but
1.Sort — keep only what is needed. Pitch every- creates no value.
thing else. The workplace often becomes 1. Overproduction (the most common type of Fire Up Your Profits!
cluttered with products, tools, and waste waste) which creates inventories that take up
materials that don't really belong there. Get rid of space and capital.
them. 2. Excess inventory caused by overproduction.
2.Straighten — A place for everything and 3. Waiting—Don't you hate standing in line? So do
everything in its place. Establish standardized your products or services. So do employees.
places for incoming raw materials, tools, etc. Are they always waiting for something?
3.Shine — clean machines and work area to 4. Unnecessary movement of work products.
expose problems. When you break the silos into cells, the products
4.Standardize — develop systems and proce- don't have to travel so far between processes.
dures to monitor conformance to the first three
5. Unnecessary movement of employees. Are
rules. (This includes the define and measure
parts and tools too far from where they're
aspects of Six Sigma's DMAIC.)
needed? Walking is waste.
5.Sustain — maintain a stable workflow. (This
6. Unnecessary or incorrect processing. Why
includes the Analyze, Improve, and Control
have people watch a machine that can be taught
phases of Six Sigma.)
to monitor itself?
7. Defects leading to repair, rework, or scrap. Quick Reference Card
Design for One-Piece Flow Lean thinking will help you reduce or eliminate $3.00
numbers 1-5. Six Sigma will help you reduce 6-7.
Purpose: Stop producing big batches of product. © 2011 Jay Arthur
When you rearrange your production or service floor
Start producing one piece at a time. KnowWare® International, Inc.
into production cells with right-sized machines and
1. Focus on the part, product or service itself. quick change-over, you can quickly reduce most of 2253 S. Oneida St., Ste 3D
Follow the product through its entire production these common kinds of waste by 50-90 percent. Denver, CO 80224
cycle looking for opportunities to reduce delay,
inventory, waste and rework. Common measures of flow: (888) 468-1537 or (303) 756-9144
• Lead (or cycle) time: time product stays in the (888) 468-1536 or (303) 753-9675 (fax)
2. Realign the work flow into production "cells" to
eliminate delay, rework, and scrap. system
• Value-added ratio: knowwareman@qimacros.com
3. "Right size" the machines and technology to www.qimacros.com
(Value-added time)/(lead time)
support smaller batches, quick changeover, and
one-piece flow. • Travel distance of the product or people doing Order Lean Six Sigma Demystified and
the work
Focus on mission-critical and profit-critical Lean Six Sigma for Healthcare
processes and issues first! • Productivity: (people hours)/unit from Amazon.com
• Number of handoffs Free Money Belt Training at www.lssmb.com
• Quality rate or first pass yield
Lean - Reduce Delay Six Sigma - Reduce Defects 6σ - Reduce Deviation
Value Stream Map: Map Control Chart: Show data trends over time. Control Chart: Show data trends over time.
the value stream or process The Y-axis (left) shows the defects, time, The Y-axis (left) shows the defects, time,
at a high level to identify cost and the X-axis (bottom) shows time cost and the X-axis (bottom) shows time
delays between steps and (minute, hour, day, week, etc.). (minute, hour, day, week, etc.).
time for each step.
Pareto Chart: Focus the improvement ef- Histogram: Determine the capability (i.e.,
Spaghetti Diagram: To fort by identifying the 4% (vital few) of the the level of performance the customers can
show the flow of people and contributors that create 50% of the time consistently expect) of the process and the
products around a work defects or costs in any process. distribution of measurable data.
area as a way of redesigning Cause-Effect: Systematically analyze the
4-50 Rule: 4% of any business process
a work cell for one-piece root causes of problems. It begins with
produces over 50% of defects.
flow. major causes and works backward to root
Cause-Effect: Systematically analyze the causes.
root causes of problems. It begins with
major causes and works backward to root Verify Results: Show improvement using
Purpose: Eliminate the Speed Bumps of Lean causes. control charts and histograms.
1. Delay (unnecessary waiting)
2. Overproduction (leads to excess inventory) Verify Results: Show improvement (before
3. Waste and rework due to defects or deviation and after using control charts and paretos).
4. Non-value added processing
5. Transportation - Unnecessary movement Sustain the Improvement: Use control
6. Inventory (excess incoming or outgoing) charts and histograms to monitor and cor-
7. Movement of people (walking is waste) Sustain the Improvement: Use control rect performance.
8. Employee creativity (unused) charts to monitor and correct performance.

Purpose: Reduce or eliminate deviation (a.k.a.,


Process Purpose: Reduce or eliminate defects to cut costs variation) in products or services.
FISH Step Activity and boost profits.
Process
Focus 1 Use Value Stream Mapping to... Process
FISH Step Activity
FISH Step Activity
Improve Identify and eliminate unnecessary
delays between steps. Focus 1 Control chart of deviation over time
Focus 1 Control chart of defect rates over time
2 Histogram of deviation
2 Pareto chart of defect types
2 Use 5S to simplify the work area. 3 Analyze root causes of deviation
3 Analyze root causes of defects
3 Use Spaghetti Diagrams to Improve 4 Implement countermeasures
Improve 4 Implement countermeasures
identify and eliminate unnecessary 5 Verify results meet target
movement of people and materials. 5 Verify results meet target
To jump start your improvement efforts consider To automate these charts, get the QI Macros for
our One Day Lean Six Sigma Workshop Excel. Download a FREE 30 day trial at Download your FREE SPC quick reference card:
qimacros.com/lean-six-sigma-workshop.html www.qimacros.com/freestuff.html www.qimacros.com/pdf/spc-free-training.pdf

You might also like