Professional Documents
Culture Documents
1.c Title 3 and Abstract
1.c Title 3 and Abstract
This technical report will center on the expansion of the 138 kV bay at the 2x150 MVA, 138/69
kV CEPALCO Kirahon Substation. This bay is designed to accommodate two incoming 138
kV lines, addressing future capacity shortfalls in CEPALCO's metering points. The objective
is to enhance the reliability of CEPALCO's synchronization point while mitigating potential
capacity issues in the future.