DATA

Hole
Casing
Excess Cement
Mud weight
tail
Lead
HOLC
HOTC
Shoe

TAIL CEMENT
density
mixing water
Slurry Yield

LEAD CEMENT
Density
Mixing water
Slurry Yield

CAPACITY FACTORS
V&H between Casing & Hole
Capacity of Casing

HYDROSTATIC HEAD
Mud
Lead Cement
Tail Cement

BUOYANCY FACTORS
Mud
Lead Cement
Tail Cement

VOLUMES
Tail Cement
Excess Cement 100%
Sacks
Mixing Water

Lead Cement
Excess Cement 100%
Sacks
Mixing Water
DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

outside Pressure
Tail Cement
Lead Cement
Total Hydrostatic

Inside Pressure
Mud

Differential Pressure
Delta P

CRITICAL PRESSURE WHEN CASING REACHES BOTTOM

Area

Hook Load

Pressure

Resulting Force

Force Down

Force Up

Resulting Force

Prepared by
26 inches
20 inches
100 %
8.5 ppg
15.8 ppg
13.2 ppg
350 ft
150 ft
500 ft

15.8
5
1.15

13.2
10.2
1.89

1.5053
0.3552

Density*0.05195*Depth 0.441575
Density*0.05195*Depth 0.68574
Density*0.05195*Depth 0.82081

65.449-density/65.449 0.870128
65.449-density/65.449 0.798316
65.449-density/65.449 0.758591

HOTC*Capacity ft3/ft 225.795


Tail cement volume * 2 451.59
Volume in ft3/Yield of Tail cement 392.687
Numbers of sacks * Gals/sacks 46.74845

HOLC*Capacity ft3/ft 526.855


Lead cement volume * 2 1053.71
Volume in ft3/Yield of lead cement 557.5185
Numbers of sacks * Gals/sacks 135.3974
total height * capacity bbls/ft 177.6

Density*0.05195*Depth 123.1215
Density*0.05195*Depth 240.009
363.1305

Density*0.05195*Depth 220.7875

outside pressure-inside pressure 142.343

(OD of casing)^2*0.7854 314.16

total height*casing weight*buoyancy factor 40896.01

hookload/area 130.1757

total height * casing weight * bouyancy factor 40896.01

pressure*area 44718.48

force up - force down 3822.466

Malik Muhammad Usama Anjum


malikmuhammad.usamaanjum@halliburton.com
#FMT
94 lbs/ft

CLASS G
CLASS G+8% BENTONITE

ppg
gal/sk
ft3/sk

ppg
gal/sk
ft3/ft

ft3/ft
bbls/ft

psi/ft
psi/ft
psi/ft

ft3
ft3
sks
bbls

ft3
ft3
sks
bbls
bbls

psi
psi
psi

psi

psi

in2

lbs

psi

lbs downward

lbs upward

lbs upward
DATA
Hole
Hole depth
Casing
Drill Pipe
Excess Cement

Mud weight
Tail
Lead
HOLC
HOTC
Shoe

TAIL CEMENT
density
mixing water
Slurry Yield

LEAD CEMENT
Density
Mixing water
Slurry Yield

CAPACITY FACTORS
V&H between Casing & Hole
Capacity of Drill Pipe

HYDROSTATIC HEAD
Mud
Lead Cement
Tail Cement

BUOYANCY FACTORS
Mud
Lead Cement
Tail Cement

VOLUMES
Tail Cement
Excess Cement 100%
Sacks
Mixing Water
Lead Cement
Excess Cement 100%
Sacks
Mixing Water

DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

outside Pressure
Tail Cement
Lead Cement
Total Hydrostatic

Inside Pressure
Mud

Differential Pressure
Delta P

CRITICAL PRESSURE WHEN CASING REACHES BOTTOM

Area
Hook Load
casing
Drill pipe
Total force down

Pressure

Resulting Force
Force Down
casing
drill pipe
Total force down

Force Up

Resulting Force

Prepared by
26 inches
322 ft
20 inches 94
5 inches 19.5
100 %

8.5 ppg
15.8 ppg CLASS G
13.2 ppg CLASS G+8% BENTONITE
212 ft
100 ft
312 ft

15.8 ppg
5 gal/sk
1.15 ft3/sk

13.2 ppg
10.2 gal/sk
1.89 ft3/ft

1.5053 ft3/ft
0.01776 bbls/ft

Density*0.05195*Depth 0.441575 psi/ft


Density*0.05195*Depth 0.68574 psi/ft
Density*0.05195*Depth 0.82081 psi/ft

65.449-density/65.449 0.870128
65.449-density/65.449 0.798316
65.449-density/65.449 0.758591

HOTC*Capacity ft3/ft 150.53 ft3


Tail cement volume * 2 301.06 ft3
Volume in ft3/Yield of Tail cement 261.7913 sks
Numbers of sacks * Gals/sacks 31.16563 bbls
HOLC*Capacity ft3/ft 319.1236 ft3
Lead cement volume * 2 638.2472 ft3
Volume in ft3/Yield of lead cement 337.6969 sks
Numbers of sacks * Gals/sacks 82.01211 bbls

total height * capacity bbls/ft 5.54112 bbls

Density*0.05195*Depth 82.081 psi


Density*0.05195*Depth 145.3769 psi
227.4579 psi

Density*0.05195*Depth 137.7714 psi

outside pressure-inside pressure 89.68648 psi

(OD of casing)^2*0.7854 314.16 in2

total height*casing weight*buoyancy factor 25519.11 lbs


total height*drill pipe weight*buoyancy factor 5293.858 lbs
casing load + dill pipe load 30812.97 lbs

hookload/area 98.0805 psi

total height * casing weight * bouyancy factor 25519.11 lbs


total height * drill pipe weight * bouyancy factor 5293.858 lbs
casing load + dill pipe load 30812.97 lbs

pressure*area 28175.9 lbs

Force Down - Force Up 2637.064 lbs


Malik Muhammad Usama Anjum
malikmuhammad.usamaanjum@halliburton.com
#FMT
lb/ft
lb/ft
downward
downward
downward

upward

upward
DATA
Hole 17.5
Hole depth 2506
Surface Casing 13.375
Conductor Casing 20
Excess Cement in open hole 75

Mud weight 9.5


Tail 15.8
Lead 14.15
TOTC 2000
HOTC 500
Float shoe 2500
Float collar 2420
Shoe Track 80
Previous Shoe 500
Lead cement in OH 1500

TAIL CEMENT
density
mixing water
Slurry Yield
HOTC

LEAD CEMENT
Density
Mixing water
Slurry Yield
HOLC

CAPACITY FACTORS
V&H between Casing & Hole
V&H between 13.375" 68 lbs/ft & 20" 94 lbs/ft Casing
Capacity of 13.375" 68 lbs/ft Casing Shoe Joint
Capacity of 13.375" 68 lbs/ft Casing

HYDROSTATIC HEAD
Mud Density*0.05195*Depth
Lead Cement Density*0.05195*Depth
Tail Cement Density*0.05195*Depth

BUOYANCY FACTORS
Mud 65.449-density/65.449
Lead Cement 65.449-density/65.449
Tail Cement 65.449-density/65.449
VOLUMES
Tail Cement
cuft(annulus) HOTC*Capacity ft3/ft
Excess Cement 75% Tail cement volume * 1.75
cuft(shoe joint) shoe track length*capacity ft3/ft
Total cement shoe track+excess cement
Sacks Volume in ft3/Yield of Tail cement
Mixing Water Numbers of sacks * Gals/sacks

Lead Cement
cuft(OH) OH *Capacity ft3/ft
Excess Cement 75% Lead cement volume * 1.75
cuft(csg-csg) Previous Shoe*capacity ft3/ft
Total cement cuft csg csg +excess cement
Sacks Volume in ft3/Yield of lead cement
Mixing Water Numbers of sacks * Gals/sacks

DISPLACEMENT
Displacement total height till float collar * capacity bbls/ft of 13.375" csg

PRESSURE TO LAND THE PLUG

outside Pressure
Tail Cement Density*0.05195*Depth
Lead Cement Density*0.05195*Depth
Total Hydrostatic

Inside Pressure
Mud Density*0.05195*Depth
Cement Density*0.05195*Depth
Total Hydrostatic Mud + Cement

Differential Pressure
Delta P outside pressure-inside pressure

CRITICAL PRESSURE WHEN CASING REACHES BOTTOM

Area (OD of casing)^2*0.7854

hookload casing total height*casing weight*buoyancy factor

Pressure hookload/area
Resulting Force

Force Down
casing total height * casing weight * bouyancy factor
shoe joint total height * drill pipe weight * bouyancy factor
Total force down casing load + dill pipe load

Force Up pressure*area

Resulting Force Force Down - Force Up

Prepared by
Malik Muhammad Usama Anjum
malikmuhammad.usamaanjum@halliburton.com
#FMT
inches
ft
inches 68 lb/ft
inches 94 lb/ft
%

ppg
ppg CLASS G
ppg CLASS G+8% BENTONITE
ft
ft
ft
ft
ft
ft
ft

15.8 ppg
5 gal/sk
1.15 ft3/sk
500 ft

14.15 ppg
5.75 gal/sk
1.26 ft3/ft
2000 ft

0.6946 ft3/ft
1.019 ft3/ft
0.8406 ft3/ft
0.1497 bbls/ft

0.493525 psi/ft
0.7350925 psi/ft
0.82081 psi/ft

0.854848814
0.783801128
0.758590658
347.3 ft3
607.775 ft3
67.248 ft3
675.023 ft3
586.9765217 sks
69.87815735 bbls

1041.9 ft3
1823.325 ft3
509.5 ft3
2332.825 ft3
1851.448413 sks
253.4721041 bbls

362.274 bbls

410.405 psi
1470.185 psi
1880.59 psi

1194.3305 psi
65.6648 psi
1259.9953 psi

620.5947 psi

140.5006969 in2

145324.2983 lbs downward

1034.331513 psi
140673.9208 lbs downward
4126.733182 lbs downward
144800.6539 lbs downward

87193.98783 lbs upward

57606.66612 lbs Downward


DATA
Hole 17.5
Hole depth 2506
Surface Casing 13.375
Conductor Casing 20
Drill pipe 5
Excess Cement in open hole 75
Mud weight 9.5
Tail 15.8
Lead 14.15
TOTC 2000
HOTC 500
Float shoe 2500
Float collar 2420
Shoe Track 80
Previous Shoe 500
Lead Cement in OH 1500

TAIL CEMENT
density
mixing water
Slurry Yield
Tail distance

LEAD CEMENT
Density
Mixing water
Slurry Yield
Lead distance from Tail cement top to surface

CAPACITY FACTORS
V&H between Casing & Hole
V&H between 13.375" 68 lbs/ft & 20" 94 lbs/ft Casing
Capacity of 13.375" 68 lbs/ft Casing Shoe Joint
Capacity of 5" Drill pipe

HYDROSTATIC HEAD
Mud Density*0.05195*Depth
Lead Cement Density*0.05195*Depth
Tail Cement Density*0.05195*Depth

BUOYANCY FACTORS
Mud 65.449-density/65.449
Lead Cement 65.449-density/65.449
Tail Cement 65.449-density/65.449
VOLUMES
Tail Cement
cuft(annulus) HOTC*Capacity ft3/ft
Excess Cement 75% Tail cement volume * 1.75
cuft(shoe joint) shoe track length*capacity ft3/ft
Total cement shoe track+excess cement
Sacks Volume in ft3/Yield of Tail cement
Mixing Water Numbers of sacks * Gals/sacks

Lead Cement
cuft(OH) OH *Capacity ft3/ft
Excess Cement 75% lead cement volume * 1.75
cuft(csg-csg) previous shoe*capacity ft3/ft
Total cement shoe track+excess cement
Sacks Volume in ft3/Yield of lead cement
Mixing Water Numbers of sacks * Gals/sacks

DISPLACEMENT
Displacement total height till float collar * capacity bbls/ft of 5" drill pipe

PRESSURE TO LAND THE PLUG

outside Pressure
Tail Cement Density*0.05195*Depth
Lead Cement Density*0.05195*Depth
Total Hydrostatic

Inside Pressure
Mud Density*0.05195*Depth
Cement Density*0.05195*Depth
Total Hydrostatic Mud + Cement

Differential Pressure
Delta P outside pressure-inside pressure

CRITICAL PRESSURE WHEN CASING REACHES BOTTOM

Area (OD of casing)^2*0.7854

hookload casing total height*casing weight*buoyancy factor

Pressure hookload/area
Resulting Force

Force Down
casing total height * casing weight * bouyancy factor
shoe joint total height * shoe joint * bouyancy factor
drill pipe total height * drill pipe weight * bouyancy factor
Total force down casing load + dill pipe load

Force Up pressure*area

Resulting Force Force Down - Force Up

Prepared by
Malik Muhammad Usama Anjum
malikmuhammad.usamaanjum@halliburton.com
#FMT
inches
ft
inches 68 lb/ft
inches 94 lb/ft
inches 19.5 lb/ft
%
ppg
ppg CLASS G
ppg 50-50 Pozmix A
ft
ft
ft
ft
ft
ft
ft

15.8 ppg
5 gal/sk
1.15 ft3/sk
500 ft

14.15 ppg
5.75 gal/sk
1.26 ft3/ft
2000 ft

0.6946 ft3/ft
1.019 ft3/ft
0.8406 ft3/ft
0.01776 bbls/ft

0.493525 psi/ft
0.7350925 psi/ft
0.82081 psi/ft

0.854848814
0.783801128
0.758590658
347.3 ft3
607.775 ft3
67.248 ft3
675.023 ft3
586.9765217 sks
69.87815735 bbls

1041.9 ft3
1823.325 ft3
509.5 ft3
2332.825 ft3
1851.448413 sks
253.4721041 bbls

42.9792 bbls

410.405 psi
1470.185 psi
1880.59 psi

1194.3305 psi
65.6648 psi
1259.9953 psi

620.5947 psi

140.5006969 in2

145324.2983 lbs downward

1034.331513 psi
140673.9208 lbs downward
4126.733182 lbs downward
40340.31551 lbs downward
185140.9695 lbs downward

87193.98783 lbs upward

97946.98163 lbs Downward


DATA
Hole
Hole depth
Intermediate casing
Surface Casing

Excess Cement in open hole


Mud weight
Tail
Lead
TOLC
TOTC
Float shoe
Float collar
Shoe Track
Previous Shoe
OH

SPACER
Density
Volume

TAIL CEMENT
density
mixing water
Slurry Yield
TOTC

LEAD CEMENT
Top of Lead cement in cased hole
Total lead cement Height
Density
Mixing water
Slurry Yield
TOLC
HOLC in open hole

Mud height

CAPACITY FACTORS
V&H between 7.625" 29.7 lbs/ft & 9.375" Hole
V&H between 10.75" 40.5 lbs/ft & 7.625" 29.7 lbs/ft Casing
Capacity of 7.625" 29.7 lbs/ft Casing Shoe Joint
V&H between 10.75" 40.5 lbs/ft & 7.625" 29.7 lbs/ft Casing
Capacity of 7.625" 29.7 lbs/ft casing

HYDROSTATIC HEAD
Mud
Spacer
Lead Cement
Tail Cement

VOLUMES
Tail Cement
cuft(annulus)
Excess Cement 15%
cuft(shoe joint)
Total cement
Sacks
Mixing Water

Lead Cement
cuft(OH)
Excess Cement 15%
cuft(csg-csg)
Total cement
Sacks
Mixing Water

DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

Height of Spacer

outside Pressure
Tail Cement
Lead Cement
Spacer
Mud
Total Hydrostatic

Inside Pressure
Mud
Cement
Total Hydrostatic
Differential Pressure
Delta P

Prepared by
9.375 inches
10341 ft
7.625 inches 29.7
10.75 inches 40.5

15 %
10.7 ppg
16.4 ppg CLASS G
14.7 ppg 50-50 Pozmix A
1518 ft
9336 ft
10336 ft
10256 ft
80 ft
2518 ft
1500 ft

11.7 ppg
45 bbls

16.4 ppg
4.3 gal/sk
1.06 ft3/sk
9336 ft

1000 ft
7818 ft
14.7 ppg
6.69 gal/sk
1.38 ft3/ft
1518 ft
6818 ft

436.2692308 ft

0.1623 ft3/ft
0.2338 ft3/ft
0.2577 ft3/ft
0.0416 bbls/ft
0.0459 bbls/ft

Density*0.05195*Depth 0.555865 psi/ft


Density*0.05195*Depth 0.607815 psi/ft
Density*0.05195*Depth 0.763665 psi/ft
Density*0.05195*Depth 0.85198 psi/ft

HOTC*Capacity ft3/ft 162.3 ft3


Tail cement volume * 1.15 186.645 ft3
shoe joint length*capacity ft3/ft 20.616 ft3
shoe joint+excess cement 207.261 ft3
Volume in ft3/Yield of Tail cement 195.5292453 sks
Numbers of sacks * Gals/sacks 20.01847035 bbls

height of open hole lead cement *Capacity ft3/ft 1106.5614 ft3


lead cement volume * 1.15 1272.54561 ft3
height of lead cement in cased hole*capacity ft3/ft 233.8 ft3
cuft csg csg+excess cement 1506.34561 ft3
Volume in ft3/Yield of lead cement 1091.55479 sks
Numbers of sacks * Gals/sacks 173.8690844 bbls

total height till float collar* capacity bbls/ft of 7.625" csg 470.7504 bbls

volume/capacity between 10.75" and 7.625" csgs 1081.730769

Density*0.05195*Depth 851.98 psi


Density*0.05195*Depth 5970.33297 psi
Density*0.05195*Depth 657.4921875 psi
Density*0.05195*Depth 242.506796 psi
7722.311953 psi

Density*0.05195*Depth 5700.95144 psi


Density*0.05195*Depth 68.1584 psi
Mud + Cement 5769.10984 psi
outside pressure-inside pressure 1953.202113 psi

Malik Muhammad Usama Anjum


malikmuhammad.usamaanjum@halliburton.com
#FMT
lb/ft
lb/ft
DATA
Hole
Hole depth
Intermediate casing
Surface Casing

Excess Cement in open hole


Mud weight
Tail
Lead
TOLC
TOTC
Float shoe
Float collar
Shoe Track
Previous Shoe
OH

SPACER
Density
Volume

TAIL CEMENT
density
mixing water
Slurry Yield
TOTC
HOTC

LEAD CEMENT
Density
Mixing water
Slurry Yield
TOLC
TOLC in open hole
TOLC in cased hole
Lead cement total height

Mud height

CAPACITY FACTORS
V&H between 9.625" 53.5 lbs/ft & 11.5" Hole
V&H between 9.625" 53.5 lbs/ft & 13.375" 72 lbs/ft Casing
Capacity of 9.625" 53.5 lbs/ft Casing Shoe Joint
V&H between 9.625" 53.5 lbs/ft & 13.375" 72 lbs/ft Casing
Capacity of 9.625" 53.5 lbs/ft casing

HYDROSTATIC HEAD
Mud
Spacer
Lead Cement
Tail Cement

VOLUMES
Tail Cement
cuft(annulus)
Excess Cement 10%
cuft(shoe joint)
Total cement
Sacks
Mixing Water

Lead Cement
cuft(OH)
Excess Cement 10%
cuft(csg-csg)
Total cement
Sacks
Mixing Water

DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

Height of Spacer

outside Pressure
Tail Cement
Lead Cement
Spacer
Mud
Total Hydrostatic

Inside Pressure
Mud
Cement
Total Hydrostatic

Differential Pressure
Delta P

Prepared by
11.5 inches
9670 ft
9.625 inches
13.378 inches

10 %
11.2 ppg
14.8 ppg
12.4 ppg
2496 ft
9336 ft
9665 ft
9625 ft
40 ft
3215 ft
1500 ft

11.5
55

14.8
6.3
1.32
9336
329

12.4
10.9
1.97
2496
6121
719
6840

1549.356282

0.216
0.3262
0.3973
0.0581
0.0707

Density*0.05195*Depth 0.58184
Density*0.05195*Depth 0.597425
Density*0.05195*Depth 0.64418
Density*0.05195*Depth 0.76886

HOTC*Capacity ft3/ft 71.064


Tail cement volume * 1.10 78.1704
shoe track length*capacity ft3/ft 15.892
shoe track+excess cement 94.0624
Volume in ft3/Yield of Tail cement 71.25939394
Numbers of sacks * Gals/sacks 10.68890909

lead cement OH *Capacity ft3/ft 1322.136


lead cement volume * 1.10 1454.3496
cement in cased hole*capacity ft3/ft 234.5378
cuft csg csg+excess cement 1688.8874
Volume in ft3/Yield of lead cement 857.3032487
Numbers of sacks * Gals/sacks 222.490605

total height till float collar * capacity bbls/ft of 9.625" csg 680.4875

volume/capacity between 9.625" and 13.375" csgs 946.6437177

Density*0.05195*Depth 252.95494
Density*0.05195*Depth 4406.1912
Density*0.05195*Depth 565.5486231
Density*0.05195*Depth 901.4774593
6126.172222
Density*0.05195*Depth 5600.21
Density*0.05195*Depth 30.7544
Mud + Cement 5630.9644

outside pressure-inside pressure 495.2078223

Malik Muhammad Usama Anjum


malikmuhammad.usamaanjum@halliburton.com
#FMT
53.5 lb/ft
72 lb/ft

CLASS G
50-50 Pozmix A

ppg
bbls

ppg
gal/sk
ft3/sk
ft
ft

ppg
gal/sk
ft3/ft
ft
ft
ft
ft

ft

ft3/ft
ft3/ft
ft3/ft
bbls/ft
bbls/ft

psi/ft
psi/ft
psi/ft
psi/ft

ft3
ft3
ft3
ft3
sks
bbls

ft3
ft3
ft3
ft3
sks
bbls

bbls

psi
psi
psi
psi
psi
psi
psi
psi

psi
DATA
Hole
Hole depth
Intermediate casing
Production Casing

Excess Cement in open hole


Mud weight
Cement
TOS
TOC
Float shoe
Float collar
Shoe Track
Previous Shoe
Spacer height

SPACER
Density

Cement
density
mixing water
Slurry Yield

CAPACITY FACTORS
V&H between 7.625" 29.7 lbs/ft & 9.375" Hole
Capacity of 7.625" 29.7 lbs/ft shoe joint
V&H between 7.625" 29.7 lbs/ft & 9.375" hole
V&H between 7.625" 29.7 lbs/ft & 10.75" 32.75 lbs/ft Casing
Capacity of 7.624" 29.7 lbs/ft casing

HYDROSTATIC HEAD
Mud
Spacer
Cement

VOLUMES
Cement
cuft(annulus)
Excess Cement 15%
cuft(shoe joint)
Total cement
Sacks
Mixing Water

DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

Spacer required

outside Pressure
Cement
Spacer
Mud
Total Hydrostatic

Inside Pressure
Mud
Cement
Total Hydrostatic

Differential Pressure
Delta P

Prepared by
9.375 inches
11742 ft
10.75 inches 32.75 lb/ft
7.625 inches 29.7 lb/ft

15 %
13.7 ppg
16 ppg Class H 35% SSA-2
8633 ft
9633 ft
11733 ft
11625 ft
108 ft
8518 ft
1000 ft

14.7 ppg

16 ppg
5.92 gal/sk
1.47 ft3/sk

0.1623 ft3/ft
0.2577 ft3/ft
0.0289 bbls/ft
0.0444 bbls/ft
0.0459 bbls/ft

Density*0.05195*Depth 0.711715 psi/ft


Density*0.05195*Depth 0.763665 psi/ft
Density*0.05195*Depth 0.8312 psi/ft

annulus length*Capacity ft3/ft 340.83 ft3


Tail cement volume * 1.15 391.9545 ft3
shoe track length*capacity ft3/ft 27.8316 ft3
shoe track+excess cement 419.7861 ft3
Volume in ft3/Yield of Tail cement 285.5687755 sks
Numbers of sacks * Gals/sacks 40.25159883 bbls

total height till float collar * capacity bbls/ft of 7.625" csg 533.5875 bbls

Spacer height (1000)*v&h between 7.625" csg and 9.375" hole 28.9 bbls

Density*0.05195*Depth 1745.52 psi


Density*0.05195*Depth 763.665 psi
Density*0.05195*Depth 6144.235595 psi
8653.420595 psi

Density*0.05195*Depth 8273.686875 psi


Density*0.05195*Depth 89.7696 psi
Mud + Cement 8363.456475 psi

outside pressure-inside pressure 289.96412 psi

Malik Muhammad Usama Anjum


malikmuhammad.usamaanjum@halliburton.com
#FMT
DATA
Hole
Hole depth
Intermediate casing
Production Casing

Excess Cement in open hole


Mud weight
Lead Cement
HOLC
Tail Cement
HOTC
Volume of spacer
Spacer
Float shoe
Float collar
Shoe Track
Previous Shoe
TOT
open hole from TOTC to Previous Shoe
TOL
cased hole from previous shoe to TOLC

SPACER
Density

Lead Cement
density
mixing water
Slurry Yield

Tail Cement
density
mixing water
Slurry Yield

CAPACITY FACTORS
V&H between 4.5" 11.6 lbs/ft & 6.25" Hole
Capacity of 4.5" 11.6 lbs/ft shoe joint
V&H between 4.5" 11.6 lbs/ft & 7" 29 lbs/ft casing
V&H between 4.5" 11.6 lbs/ft & 7" 29 lbs/ft casing
Capacity of 4.5" 11.6 lbs/ft casing

HYDROSTATIC HEAD
Mud
Spacer
Lead Cement
Tail Cement

VOLUMES
Tail Cement
cuft(annulus)
Excess Cement 10%
cuft(shoe joint)
Total cement
Sacks
Mixing Water

Lead Cement
cuft(OH)
Excess Cement 10%
cuft(csg csg)
Total cement
Sacks
Mixing Water

DISPLACEMENT
Displacement

PRESSURE TO LAND THE PLUG

Spacer required

MUD
outside Pressure
Lead cement
Lead cement
Tail Cement
Spacer
Mud
Total Hydrostatic

Inside Pressure
Mud
Cement
Total Hydrostatic
Differential Pressure
Delta P

Prepared by
6.25 inches
8375 ft
7 inches 29
4.5 inches 11.6

10 %
14.5 ppg
15 ppg G Cement+5% salt
1794 ft
16.5 ppg G Cement +35% SSA-2
2800 ft
20 bbls
15.5 ppg
8365 ft
8305 ft
60 ft
5318 ft
5565 ft
247 ft
3771 ft
1547 ft

15.5 ppg

15 ppg
6.2 gal/sk
1.32 ft3/sk

16.5 ppg
5.25 gal/sk
1.38 ft3/sk

0.1026 ft3/ft
0.0872 ft3/ft
0.0981 ft3/ft
0.0175 bbls/ft
0.0155 bbls/ft
Density*0.05195*Depth 0.753275 psi/ft
Density*0.05195*Depth 0.77925 psi/ft
Density*0.05195*Depth 0.77925 psi/ft
Density*0.05195*Depth 0.857175 psi/ft

annulus length 2800*Capacity ft3/ft 287.28 ft3


Tail cement volume * 1.10 316.008 ft3
shoe track length*capacity ft3/ft 5.232 ft3
shoe track+excess cement 321.24 ft3
Volume in ft3/Yield of Tail cement 232.7826087 sks
Numbers of sacks * Gals/sacks 29.09782609 bbls

annulus length 247 *Capacity ft3/ft 25.3422 ft3


Tail cement volume * 1.10 27.87642 ft3
csg csg 1547*capacity ft3/ft 151.7607 ft3
csg csg +excess cement 179.63712 ft3
Volume in ft3/Yield of Lead cement 136.0887273 sks
Numbers of sacks * Gals/sacks 20.08928831 bbls

total height till float collar * capacity bbls/ft of 7.625" csg 128.7275 bbls

spacer volume/V&H between 4.5" 11.6 lbs/ft & 7" 29 lbs/ft casing 1142.857143 FT
2638.142857 FT

Density*0.05195*Depth 192.47475 psi


Density*0.05195*Depth 1205.49975 psi
Density*0.05195*Depth 2400.09 psi
Density*0.05195*Depth 920.2571429 psi
Density*0.05195*Depth 1987.247061 psi
6705.568704 psi

Density*0.05195*Depth 6255.948875 psi


Density*0.05195*Depth 51.4305 psi
Mud + Cement 6307.379375 psi
outside pressure-inside pressure 398.1893286 psi

Malik Muhammad Usama Anjum


malikmuhammad.usamaanjum@halliburton.com
#FMT
lb/ft
lb/ft
O.D. I.D. Lead Cement Data
13 3/8 x 12.531 Density 1.6 SG Water Type Fresh Water Pre Hydrate Checmicals included dead volume
13.3 ppg Mix Water 7.867 gal/sk
9.63 x 8.63 YIELD 1.824 cu.ft./sk Pump Time 6:20 hrs. Get Water into 500 BBLS tank Roper Chemical Qty EA Additional Volume EA Total used EA
To Mix 347 bbls 1068 sks Mix Water FW 200 bbls 225 bbls 500 BBLS tank Pre Hyd HR-6L 96 gal 12 gal 108 gal
D-Air 3000L 0.01 gal/sk 5 11 gal 2.1 pail 500 BBLS tank Pre Hyd Halad-344 427 gal 53 gal 480 gal
Calculation Factors Halad-344 EXP 0.40 gal/sk 55 427 gal 7.8 drum 500 BBLS tank Pre Hyd Halad-413L 107 gal 13 gal 120 gal
Hole Cap. 0.1458 bbl./ft. Halad-413 0.10 gal/sk 55 107 gal 1.9 drum 500 BBLS tank Pre Hyd Microblock 801 gal 99 gal 900 gal
Microblock 0.75 gal/sk 55 801 gal 14.6 drum 500 BBLS tank Pre Hyd D-Air 3000L 11 gal 1 gal 12 gal
Csg. Cap. 0.0723 bbl./ft. HR-6L 0.090 gal/sk 55 96 gal 1.7 drum 500 BBLS tank Pre Hyd CFR_3L 267 gal 33 gal 300 gal
Top of Lead 3765 CFR-3L 0.25 gal/sk 50 267 lbs. 5.3 sks Tuned light blend 1068 sk 0 sk 1068 sk
Csg x Csg 0.0625 bbl./ft. gal/sk 54 0.0 gal 0.0 drum Elasticem 1.9 SG 832 sk 0 sk 832 sks
gal/sk 5 0.0 gal 0.0 pail gal
Csg x OH 0.0558 bbl./ft. gal/Sk 5 0.0 gal 0.0 pail 0 0 gal
Mix Fluid Required 9.467 gal/bbl. 43 10112.4 gal 240.8 bbls 270.8 bbls(Total Mixed fluid included 30 bbls dead volume) Batch Mixer Pre Hyd CFR_3L 58 gal 7 65 gal
@ 5753 ft. Batch Mixer Pre Hyd HR-6L 67 gal 7 74 gal
Tail Cement Data Batch Mixer Pre Hyd Latex-3000 832 gal 90 gal 922 gal
Density 1.9 SG Water Type Fresh Water Batch Mixer Pre Hyd Halad-413L 92 gal 9 gal 101 gal
15.827 ppg Mix Water 3.006 gal/sk Batch Mixer Pre Hyd Microblock 250 gal 27 gal 277 gal
12.25 Open Hole Yield 1.181 cu.ft./sk Pump Time 5:09 hrs. Get Water into Batch Mixer Batch Mixer Pre Hyd D-Air 3000L 42 gal 4 gal 46 gal
To Mix 175 bbls 832 sk Mix Water FW 59.5 bbls 66 BBLS DIFFERENTIAL PRESSURE
Top Of Tail 8415 D-Air-3000L 0.05 gal/sk 5 42 gal 8.3 pail 519.8 PSI Lead - Mud Diff Pressure
Latex-3000 1 gal/sk 55 832 gal 15.1 drum 902.9 PSI Tail - Mud Diff Pressure
Halad-413L 0.11 gal/sk 55 92 gal 1.7 drum 1422.8 PSI TOTAL DIFFERENTIAL PRESSURE
Microblock 0.3 gal/sk 55 250 gal 4.5 drum
Collar 10209 ft. HR-6L 0.080 gal/sk 55 67 gal 1.2 drum
CFR-3L 0.07 gal/sk 50 58 lbs. 1.2 pail
gal/sk 5 0 lbs. 0.0 pail
%BWOC 50 0 lbs. 0.0 pail
gal/bbl. 5 0 gal 0.0 pail
Mix Fluid Required 4.616 gal/bbl. 53 3840 gal 91.4 bbls 101.4 BBLS (Total Mixed fluid included 10 bbls dead volume)
Shoe
9 5/8 @ 10301 ft. Unweight Spacer 0 bbls
Location gal 0.0 bbls
T.D. @ 10322 ft. 55 Musol gal 0 gals 0.0 drums
55 Pen 5 gal 0 gals 0.0 drums
Cas & Cas 1988 ft. 124.3 bbls
OH Lead 2662 ft. 148.5 bbls Weighted Spacer 1.57 SG 13.08 ppg 150 bbls
Lead Excess 50 % 74.2 bbls Fresh Water 29.64 gal 105.9 bbls s
TOTAL LEAD 347.1 bbls 50 Tuned spacer III 40 lbs. 6,000 lbs. 120.0 sks
Top Of Tail 1886 ft. 105.2 bbls 3307 Barite 227.788 lbs. 34,168 lbs. 10.3 big bag
Excess 60 % 63.1 bbls 55 Musol 1.13 gal/bbl. 169 gal
Shoe Joint 92 ft. 6.6 bbls 55 Clean Bore A 1.09 gal/bbl. 164 gal
Bbls. Behind Plug 0 0.0 bbls 55 Clean Bore B 0.7 gal/bbl. 105 gal
TOTAL TAIL 175 bbls 55 BARACOR 95 0.5 gal/bbl. 75 gal
55 Bridge Maker 6 Lbs/bbl. 900 lbs.
55 D-Air 0.1 gal/bbl. 15 gal

Lead Slurry @ Surface 199 bbls 611 Sk TLB


Lead Slurry Down hole 148 bbls 457 Sk TLB
Tail Slurry Down hole 175 bbls 832 SkClass G

TOTAL DISPALCEMENT 737.7 bbls


Pump Tuned Spacer E+ 20 bbls CMT Unit
Displacement 718 bbls RIG pumps

BF1 Sk of blend 1.456 Sk/Cu/ft.


For Volumetric Mixing Reference
Water to Solids Ratio