This document contains daily transformer inspection reports from an industrial park development corporation for the week 2 inspections. It inspects transformers at three different locations: the OSS (outdoor substation), the power house, and the waste water treatment ZLD plant. The inspection checklist includes items like visual inspection of valves, temperature indicators, leakages, fans and vibrations. No issues were found across all the inspections and transformers were working properly.
This document contains daily transformer inspection reports from an industrial park development corporation for the week 2 inspections. It inspects transformers at three different locations: the OSS (outdoor substation), the power house, and the waste water treatment ZLD plant. The inspection checklist includes items like visual inspection of valves, temperature indicators, leakages, fans and vibrations. No issues were found across all the inspections and transformers were working properly.
This document contains daily transformer inspection reports from an industrial park development corporation for the week 2 inspections. It inspects transformers at three different locations: the OSS (outdoor substation), the power house, and the waste water treatment ZLD plant. The inspection checklist includes items like visual inspection of valves, temperature indicators, leakages, fans and vibrations. No issues were found across all the inspections and transformers were working properly.
This document contains daily transformer inspection reports from an industrial park development corporation for the week 2 inspections. It inspects transformers at three different locations: the OSS (outdoor substation), the power house, and the waste water treatment ZLD plant. The inspection checklist includes items like visual inspection of valves, temperature indicators, leakages, fans and vibrations. No issues were found across all the inspections and transformers were working properly.
CS Number:- AIP Location:- OSS Week:-2 Type:- Dry type transformer
Air TEMP0C= Date:-18-04-2023 Enclosed( ) Open ( )
Humidity%= Feeder No:- OBF-R- Inspected by:- Dead inspection is required
AH04 Yes ( ) No ( ) No Inspection Yes No Remark (If not what measures taken or should be taken 1 Visual inspection of valve positions It is dry type 2 Visual inspection of temperature indicators 3 Visual inspection of level gauges. It is dry type 4 Visual inspection of oil leakages It is dry type 5 Check proper rotating direction of oil pumps. (If It is dry type exist) 6 Check flow indicators of oil pumps. (If exist) It is dry type 7 Inspect cooling fans and radiators for cleanliness Only axial fans are existed. and fans for proper rotation. 8 Inspect visually identified vibrations on the transformer. 9 Remark:-
Inspected by__________________ Check and approved _________________
CS Number:- AIP Location:- Power Week:-2 Type:- Dry type transformer
Air TEMP0C= 47.9 house Date:-18-04-2023 Enclosed( ) Open ( )
Humidity%= Feeder No:- PDR- Inspected by:- Dead inspection is required
AH04 Yes ( ) No ( ) No Inspection Yes No Remark (If not what measures taken or should be taken 1 Visual inspection of valve positions It is dry type 2 Visual inspection of temperature indicators 3 Visual inspection of level gauges. It is dry type 4 Visual inspection of oil leakages It is dry type 5 Check proper rotating direction of oil pumps. (If It is dry type exist) 6 Check flow indicators of oil pumps. (If exist) It is dry type 7 Inspect cooling fans and radiators for cleanliness Only axial fans are existed. and fans for proper rotation. 8 Inspect visually identified vibrations on the transformer. 9 Remark:-
Inspected by__________________ Check and approved _________________
DAILY TRANSFORMER INSPECTION OF WASTE WATER TREATMENT (ZLD)
Daily transformer inspection checklist
CS Number:- AIP Location:- Waste Week:-2 Type:- Dry type transformer
Air TEMP0C= water treatment Date:-18-04-2023 Enclosed( ) Open ( ) (ZLD) Humidity%= Feeder No:- Inspected by:- Dead inspection is required Yes ( ) No ( ) No Inspection Yes No Remark (If not what measures taken or should be taken 1 Visual inspection of valve positions 2 Visual inspection of temperature indicators 3 Visual inspection of level gauges. 4 Visual inspection of oil leakages 5 Check proper rotating direction of oil pumps. (If There is no oil pump exist) 6 Check flow indicators of oil pumps. (If exist) There is no oil pump 7 Inspect cooling fans and radiators for cleanliness and fans for proper rotation. 8 Inspect visually identified vibrations on the transformer. 9 Remark:-
Inspected by__________________ Check and approved _________________
CS Number:- AIP Location:- Power Week:-2 Type:- Dry type transformer
Air TEMP0C= 48.3 house Date:-19-04-2023 Enclosed( ) Open ( )
Humidity%= Feeder No:- PDR- Inspected by:- Dead inspection is required
AH04 Yes ( ) No ( ) No Inspection Yes No Remark (If not what measures taken or should be taken 1 Visual inspection of valve positions It is dry type 2 Visual inspection of temperature indicators 3 Visual inspection of level gauges. It is dry type 4 Visual inspection of oil leakages It is dry type 5 Check proper rotating direction of oil pumps. (If It is dry type exist) 6 Check flow indicators of oil pumps. (If exist) It is dry type 7 Inspect cooling fans and radiators for cleanliness Only axial fans are existed. and fans for proper rotation. 8 Inspect visually identified vibrations on the transformer. 9 Remark:-