Professional Documents
Culture Documents
ETP48200-C5aD2 and ETP48400-C6A5 Embedded Power User Manual
ETP48200-C5aD2 and ETP48400-C6A5 Embedded Power User Manual
Power
User Manual
Issue 02
Date 2019-10-25
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: https://e.huawei.com
Preface
Purpose
This document describes the DC power system in terms of product overview, components,
installation, commissioning, and maintenance. This document also describes operations for
the site monitoring unit (SMU) and rectifiers.
The figures provided in this document are for reference only.
Intended Audience
This document is intended for:
Sales engineers
Technical support engineers
Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates a hazard with a high level of risk which, if not avoided, will
result in death or serious injury.
Indicates a hazard with a medium level of risk which, if not avoided,
could result in death or serious injury.
Indicates a hazard with a low level of risk which, if not avoided, could
result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not avoided, could
result in equipment damage, data loss, performance deterioration, or
unanticipated results.
NOTICE is used to address practices not related to personal injury.
Supplements the important information in the main text.
NOTE is used to address information not related to personal injury,
equipment damage, and environment deterioration.
Change History
Changes between document issues are cumulative. The latest document issue contains all the
changes made in earlier issues.
Issue 02 (2019-10-25)
Modified contents about the rectifier.
Issue 01 (2015-07-28)
This issue is the first official release.
Contents
Preface.......................................................................................................................................... ii
1 Safety Precautions .................................................................................................................... 1
1.1 General Safety ....................................................................................................................................................... 1
1.1.1 Disclaimer .......................................................................................................................................................... 1
1.1.2 General Requirements......................................................................................................................................... 1
1.1.3 Symbol Conventions........................................................................................................................................... 4
1.2 Personnel Requirements ........................................................................................................................................ 5
1.3 Electrical Safety .................................................................................................................................................... 5
1.3.1 Grounding Requirements .................................................................................................................................... 5
1.3.2 AC and DC Power Operation Requirements ........................................................................................................ 6
1.3.3 Cabling Requirements......................................................................................................................................... 6
1.3.4 TNV Circuit ....................................................................................................................................................... 7
1.3.5 Environment Requirements and Tool Insulation................................................................................................... 7
1.4 Installation Environment Requirements.................................................................................................................. 7
1.5 Mechanical Safety ................................................................................................................................................. 8
1.5.1 Hoisting.............................................................................................................................................................. 8
1.5.2 Using Ladders .................................................................................................................................................... 9
1.5.3 Drilling Holes ....................................................................................................................................................10
1.5.4 Moving Heavy Objects ...................................................................................................................................... 11
1.6 Battery Safety....................................................................................................................................................... 11
1.6.1 Basic Requirements ........................................................................................................................................... 11
1.6.2 Battery Installation Regulations .........................................................................................................................12
1.6.3 Protection Against Battery Short Circuits ...........................................................................................................12
1.6.4 Protection Against Flammable Gas.....................................................................................................................13
1.6.5 Battery Leakage Handling Regulations...............................................................................................................13
1.6.6 Lithium Battery Scenarios..................................................................................................................................13
2 Overview ................................................................................................................................. 15
2.1 Introduction ..........................................................................................................................................................15
2.2 Model Number Description...................................................................................................................................15
2.3 System Features ...................................................................................................................................................16
2.4 Working Principles ...............................................................................................................................................16
2.5 System Configurations..........................................................................................................................................17
3 Components ............................................................................................................................ 19
3.1 Appearance...........................................................................................................................................................19
3.2 PDU .....................................................................................................................................................................20
3.3 Rectifier ...............................................................................................................................................................20
3.4 SMU02B ..............................................................................................................................................................22
3.5 UIM02C ...............................................................................................................................................................25
4 Installation .............................................................................................................................. 29
4.1 Installation Preparations .......................................................................................................................................29
4.1.1 Tools .................................................................................................................................................................29
4.1.2 Installation Dimensions .....................................................................................................................................30
4.1.3 Requirements for Cable Routing ........................................................................................................................31
4.1.4 Unpacking and Acceptance ................................................................................................................................31
4.2 Installing Subracks ...............................................................................................................................................32
4.3 Installing Ground Cables ......................................................................................................................................33
4.4 Installing a Rectifier .............................................................................................................................................34
4.5 (Optional) Installing Dry Contact Signal Cables ....................................................................................................35
4.6 Installing the Communications Cables ..................................................................................................................36
4.6.1 WebUI Management ..........................................................................................................................................36
4.6.2 NetEco Management .........................................................................................................................................36
4.6.3 Third-Party NMS Management (over SNMP) .....................................................................................................37
4.7 Installing DC Output Power Cables.......................................................................................................................38
4.8 Installing Battery Cables .......................................................................................................................................39
4.9 Installing 127/220 V AC Three-Phase Three-Wire Input Power Cables ..................................................................40
6 Commissioning....................................................................................................................... 43
6.1 Connecting the AC Power Supply .........................................................................................................................43
6.2 Setting the Display Language ...............................................................................................................................43
6.3 Setting the Date and Time .....................................................................................................................................43
6.4 Setting Battery Parameters ....................................................................................................................................44
6.5 (Optional) Setting Sensor Parameters ....................................................................................................................45
6.6 (Optional) Setting the Hibernation Parameter ........................................................................................................45
6.7 Setting Communications Parameters .....................................................................................................................46
6.7.1 Setting Parameters Before Using WebUI Management .......................................................................................46
6.7.2 (Optional) Setting Parameters Before Using the NetEco Management ................................................................46
6.7.3 (Optional) Setting Parameters Before Using the SNMP Management ..................................................................48
6.8 Connecting the Battery Supply..............................................................................................................................50
6.9 Subsequent Operations .........................................................................................................................................51
7 Maintenance............................................................................................................................ 52
7.1 Routine Maintenance ............................................................................................................................................52
7.2 Rectifying Common Faults ...................................................................................................................................53
7.2.1 AC Failure .........................................................................................................................................................53
7.2.2 AC Over Volt .....................................................................................................................................................53
7.2.3 AC Under Volt ...................................................................................................................................................53
7.2.4 DC Over Volt.....................................................................................................................................................53
7.2.5 DC Under Volt ...................................................................................................................................................54
7.2.6 Batt Chg. Overcur. .............................................................................................................................................54
7.2.7 LLVD Disconnected ..........................................................................................................................................55
7.2.8 BLVD Disconnected ..........................................................................................................................................55
7.2.9 Batt Loop Trip ...................................................................................................................................................55
7.2.10 High Amb. Temp. ............................................................................................................................................56
7.2.11 Low Amb. Temp. .............................................................................................................................................56
7.2.12 High Amb. Humi. ............................................................................................................................................57
7.2.13 Low Amb. Humi. .............................................................................................................................................57
7.2.14 Batt. High Temp...............................................................................................................................................57
7.2.15 Batt. Low Temp. ..............................................................................................................................................58
7.2.16 Door Alarm .....................................................................................................................................................58
7.2.17 Water Alarm ....................................................................................................................................................58
7.2.18 Smoke Alarm ...................................................................................................................................................59
7.2.19 Rect Fault ........................................................................................................................................................59
7.2.20 Rect Protection ................................................................................................................................................59
7.2.21 Rect Comm Fault .............................................................................................................................................60
7.2.22 Load Fuse Break ..............................................................................................................................................60
7.2.23 DC SPD Alarm ................................................................................................................................................60
7.3 Identifying Component Faults ...............................................................................................................................61
7.3.1 Identifying Circuit Breaker Faults ......................................................................................................................61
7.3.2 Identifying Rectifier Faults ................................................................................................................................61
7.3.3 Identifying SMU Faults .....................................................................................................................................61
7.4 Replacing Components .........................................................................................................................................61
7.4.1 Replacing a Rectifier .........................................................................................................................................62
7.4.2 Replacing an SMU.............................................................................................................................................63
7.4.3 Replacing the PCB of UIM02C ..........................................................................................................................64
7.4.4 Replacing a Circuit Breaker ...............................................................................................................................66
7.4.5 Replacing a Fuse ...............................................................................................................................................67
A Technical Specifications....................................................................................................... 70
B Electrical Conceptual Diagram ............................................................................................ 73
C Associations Between Alarms and Dry Contacts on the UIM ......................................... 74
D Acronyms and Abbreviations.............................................................................................. 75
1 Safety Precautions
Bolts should be tightened with a torque wrench and marked using red or blue color. After
the installation personnel confirm that the screws are tightened, mark the screws using
blue color. After the inspector confirms that the screws are tightened, mark the screws
using red color. (The marks should cross the edges of the screws, as shown in the
following figure.)
Ensure that all slots are installed with boards or filler panels. Avoid hazards caused by
hazardous voltages or energy on boards. Ensure that the air channel is normal, control
electromagnetic interference, and prevent dust and other sundries on the backplane,
baseplate, and boards.
After installing the equipment, remove idle packing materials such as cartons, foam,
plastics, and cable ties from the equipment area.
In the case of a fire, immediately leave the building or the equipment area, and turn on
the fire alarm bell or make an emergency call. Do not enter the building on fire in any
case.
Do not stop protective devices. Pay attention to the warnings, cautions, and related
precautionary measures in this document and on the nameplates. Promptly replace
warning labels that have worn out.
Keep irrelevant people far away from the equipment.
Use wooden or fiberglass ladders when you need to perform live working at heights.
Use insulated tools or tools with insulated handles, as shown in the following figure.
All cable holes should be sealed. Seal the cable holes with firestop putty. Seal the unused
cable holes with the caps delivered with the cabinet. The following figure shows the
criteria for correct sealing with firestop putty.
Do not use water, alcohol, oil, or other solvents to clean electrical components inside and
outside a cabinet.
Symbol Description
Indicates a part exposed to high voltage. This symbol warns
operators that both direct and indirect contact with the power grid is
fatal. Such areas include hazardous voltage points or protective
power supply covers that may be removed during maintenance.
Warns users of overheating. This symbol is attached to a device
surface that may overheat and cause scalding. It warns users not to
touch the surface during operation or maintenance. Users should
wear heat insulation gloves before operation to prevent scalding.
Indicates protective grounding. This symbol is attached near the
or protective ground terminal and is used beside a terminal through
which a device is connected to an external grounding grid. A device
ground cable is connected from the protective ground terminal to the
external ground bar.
Indicates equipotential bonding. This symbol is used for an
equipotential bonding terminal. That is, this symbol is attached to
each equipotential bonding terminal inside a device.
Is an ESD symbol and attached to any areas with electrostatic
sensitivity. If you see such a symbol, wear a pair of ESD gloves or
an ESD wrist strap before operating a device.
Indicates that the device can be safely used only in areas with an
altitude lower than 2000 meters.
Symbol Description
ports. Connect cables according to the rated power output and
configuration parameter information in the instruction.
3. If there are multiple slots, use the symbol near the slot
information. For details, see the description of slot information,
restrictions on boards, and usage conditions in the instruction.
Professionals: personnel who are trained or experienced in equipment operations and are clear of the
sources and degree of various potential hazards in equipment installation, operation, and
maintenance
Trained personnel: personnel who are technically trained, have required experience, are aware of
possible hazards on themselves in certain operations, and are able to take protective measures to
minimize the hazards on themselves and other people
Users or operators: operation personnel, except trained personnel and professionals, who may handle
the equipment
The power system is powered by high-voltage power sources. Direct or indirect contact
(especially through damp objects) with the power sources may result in electric shock.
Non-standard and improper operations may result in fire or electric shocks.
Do not install or remove power cables with power on. Transient contact between the core
of a power cable and a conductor may generate electric arcs or sparks, which may cause
fire or hurt human eyes.
If the power supply to the equipment is permanently connected, install an easily
accessible disconnector at the exterior of the equipment.
Before making electrical connections, switch off the disconnector on the upstream device
to cut the power supply if people may contact energized components.
If a "high electricity leakage" tag is attached on the power terminal of a device, you must
ground the protective ground terminal on the device enclosure before connecting the AC
power supply; otherwise, electric shock as a result of electricity leakage may occur.
Before installing or removing a power cable, turn off the power circuit breaker.
Before connecting a power cable, check that the label on the power cable is correct.
Before connecting the power supply, ensure that electrical connections are correct.
If the equipment has multiple inputs, disconnect all the inputs before operating the
equipment.
When routing power cables, ensure that there is no coiling or twisting. Do not join or
weld power cables. If necessary, use a longer cable.
Installation at Heights
Working at heights refers to operations that are performed at least 2 meters above the ground.
Stop working at heights if the steel pipes are wet or other potential danger exists. After any of
the preceding conditions no longer exists, the safety director and relevant technical personnel
need to check the involved equipment. Operators can begin working only after obtaining
consent.
When working at heights, comply with local relevant laws and regulations.
Only trained and qualified personnel are allowed to work at heights.
Before working at heights, check the climbing tools and safety gears such as safety
helmets, safety belts, ladders, springboards, scaffolding, and lifting equipment. If they do
not meet the requirements, take corrective measures or disallow working at heights.
Wear personal protective equipment such as the safety helmet and safety belt or waist rope
and fasten it to a solid structure. Do not mount it on an insecure moveable object or metal
object with sharp edges. Make sure that the hooks will not slide off.
Set a forbidden area and eye-catching signs for working at heights to warn away irrelevant
personnel.
Carry the operation machinery and tools properly to prevent them from falling off and
causing injuries.
Personnel involving working at heights are not allowed to throw objects from the height to
the ground, or vice versa. Objects should be transported by tough slings, hanging baskets,
highline trolleys, or cranes.
Do not perform operations on the upper and lower layers at the same time. If unavoidable,
install a dedicated protective shelter between the upper and lower layers or take other
protective measures. Do not pile up tools or properties on the upper layer.
Ensure that guard rails and warning signs are set at the edges and openings of the area
involving working at heights to prevent falls.
Do not pile up scaffolding, springboards, or other sundries on the ground under the area
involving working at heights. Do not allow people to stay or pass under the area involving
working at heights.
Inspect the scaffolding, springboards, and workbenches used for working at heights in
advance to ensure that their structures are solid and not overloaded.
Dismantle the scaffolding from top down after finishing the job. Do not dismantle the
upper and lower layers at the same time. When removing a part, ensure that other parts
will not collapse.
Before climbing up a ladder, ensure that the ladder is secure and free of cracks The angle
between the ladder and the ground should be 75°. When a step ladder is used, ensure that
the pull ropes are secured and the ladder is held firm.
Do not loiter when working at heights. Do not sleep at heights.
Any violations must be promptly pointed out by the site manager or safety supervisor and
the involved personnel should be prompted for correction. Personnel who fail to stop
violations may be forbidden from working and the suspension is considered as
absenteeism.
Operators who violate the safety regulations are responsible for accidents caused. The
supervisor has to bear the responsibility accordingly.
When heavy objects are being hoisted, do not walk under the cantilever or the objects.
Only trained and qualified personnel should perform hoisting operations.
Check that hoisting tools are available and in good condition.
Before hoisting objects, ensure that hoisting tools are firmly fixed onto a weight-bearing
object or wall.
Ensure that the angle formed by two hoisting cables is no more than 90 degrees, as
shown in the following figure.
Do not drill holes into the cabinet without permission. Incorrect drilling operations may affect
the electromagnetic shielding of the cabinet and damage cables inside. Metal shavings from
drilling may short-circuit boards inside the cabinet.
Wear goggles and protective gloves when drilling holes.
When drilling holes, protect the equipment from metal shavings. After drilling, clean up
any metal shavings that have accumulated inside or outside the equipment.
Do not connect a metal conductor to the battery poles or touch the battery terminals.
Otherwise, the battery may be short-circuited and heat up, which can cause injuries such
as burning.
Dispose of batteries in accordance with local laws and regulations. Do not dispose of
batteries as household waste. If a battery is disposed of improperly, it may explode.
Do not drop, squeeze, or puncture a battery. Protect batteries from external high pressure
to prevent internal short circuits and overheating.
Do not use damaged batteries.
To prevent injury or explosion, do not allow children or pets to swallow or bite a battery.
If batteries experience discoloration, deformation, abnormal heating, or other
abnormalities during working, charging, or storage, stop using the batteries and replace
them with new ones.
Secure battery cables or copper bars to the torque specified in battery documentation.
Loose connections will result in excessive voltage drops or cause batteries to burn out
when the current increases.
Before operating batteries, carefully read the safety precautions for battery handling and
connection.
Battery short circuits can generate high instantaneous current and release a great amount of
energy, which may cause equipment damage or personal injury.
If permitted, disconnect the batteries in use before performing any other operations.
Lead-acid batteries emit flammable gas if they work abnormally. Store lead-acid batteries in a
place with good ventilation, and take fire safety precautions.
High battery temperature may result in battery distortion, damage, and electrolyte overflow.
If the battery temperature is higher than 60°C, check the battery for electrolyte overflow. If
the electrolyte overflows, handle the leakage immediately.
When the electrolyte overflows, absorb and neutralize the electrolyte immediately.
When moving or handling a battery whose electrolyte leaks, note that the leaking electrolyte
may hurt human bodies. Neutralize and absorb the electrolyte with sodium bicarbonate
(NaHCO3) or sodium carbonate (Na2CO3) before moving the batteries.
When handling lithium batteries, do not place them upside down, tilt them, or bump
them against the ground.
Keep the battery loop disconnected during installation and maintenance.
When the ambient temperature is lower than the lower limit of the operating temperature,
do not charge the battery (0°C Charging is not allowed). Otherwise, a short circuit occurs
inside the battery.
Do not throw a lithium battery in fire.
When maintenance is complete, return the waste lithium battery to the maintenance
office.
2 Overview
2.1 Introduction
ETP48200-C5D2 and ETP48400-C6A5 are embedded telecom power systems which provide
power for –48 V DC communications equipment. The maximum output currents of
ETP48200-C5D2 and ETP48400-C6A5 are 200 A and 400 A respectively.
3 Components
3.1 Appearance
Figure 3-1 ETP48200-C5D2 appearance (no cover)
Before delivery, the RTN+ busbar is short-circuited with the subrack PE terminal by default.
When using the power supply, ensure that an SPD is installed in the upstream circuit.
3.2 PDU
Table 3-1 Power distribution specifications
3.3 Rectifier
A rectifier converts AC input power into stable DC power.
3.4 SMU02B
Panel
Indicators
Buttons
NOTE
The LCD screen becomes dark if no button is pressed within 30 seconds.
To increase (or decrease) the LCD contrast ratio, hold down and (or ) for 2
seconds.
USB Ports
You can quickly deploy a site, import and export configuration files, export running logs, and
upgrade software by inserting the USB flash drive that is specially used for site deployment
into the USB port.
After installing the specific WiFi module using the USB port, you can access the WebUI
locally, which facilitates operations.
Using WiFi modules provided by another vendor may cause data loss or function exception.
Consequences arising from this will not be borne by Huawei.
Communications Ports
NOTE
All these ports are protected by a security mechanism.
3.5 UIM02C
Panel
The user interface module (UIM02C) supports eight dry contact outputs, nine dry contact
inputs (including six universal dry contact inputs, one smoke sensor input, one water sensor
input, and one door status sensor input), and four analog parameter inputs (including one
ambient temperature and humidity input, two ambient temperature inputs, and one battery
temperature input).
Figure 3-6 shows a UIM02C panel.
Ports
DIN3
DIN4
DIN5
DIN6
Dry contact output ALM1 NOTE
ports For the associations between the dry contact output
ALM2 ports and alarms, see the appendix.
ALM3
ALM4
ALM5
ALM6
ALM7
ALM8
Communications port COM RS485 port
Communication Port
NOTE
The COM port supports the security mechanism.
Pins
Figure 3-8 shows the pin numbers of the sensor ports. Table 3-11 defines the pins.
4 Installation
(102.6 mm): indicates that the distance between a power subrack mounting ear and the front of the
subrack is about 102.6 mm.
Procedure
Step 1 Remove the mounting ears from the subrack.
Step 2 Take out the conversion mounting ears from the fittings bag, and install them on the subrack.
----End
Ensure that the ground cable is installed securely. Inappropriate grounding may cause device
damage and even personal injury.
Do not put your hands into rectifier slots, avoiding electric shocks.
When a rectifier is running, a high temperature is generated around the air exhaust vent at
the rear. Do not touch the vent or cover the vent with cables or other objects.
Procedure
Step 1 Push the locking latch towards the left.
Step 2 Draw the handle downwards.
Step 3 Gently push a rectifier into its slot along the guide rail.
Step 4 Push the handle upwards.
Step 5 Push the locking latch towards the right to secure the handle.
----End
----End
(1) FE port
----End
(1) FE port
----End
Step 2 Connect the other end to the MON1 port on the BBU, as shown in Figure 4-12.
----End
(1) FE port
----End
Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
Before installing power cables, switch off all circuit breakers, and remove battery fuses
using a fuse extracting unit.
The methods for installing DC output power cables are the same for the ETP48200-C5D2 and
ETP48400-C6A5. This section describes how to install DC output power cables for the
ETP48200-C5D2.
Procedure
Step 1 Open the front panel of the PDU.
Step 2 Route DC output power cables through the protective panel on the top of the subrack.
Step 3 Connect the negative DC output cable to the corresponding DC output wiring terminal based
on the actual load power.
Step 4 Connect the positive DC output power cable to the screw with the correct specifications on
the RTN+ busbar.
(1) DC load
----End
The methods for installing battery cables are the same for the ETP48200-C5D2 and
ETP48400-C6A5. This section describes how to install battery cables for the
ETP48200-C5D2.
Procedure
Step 1 Route battery cables through the protective panel on the top of the subrack.
Step 2 Secure the negative cables of battery strings 1–4 to the corresponding negative battery wiring
terminals.
Step 3 Secure the positive cables of battery strings 1–4 to the RTN+ busbar.
Battery cables for all strings are installed in the same way. The following figure shows how to
install battery cables for one battery string.
----End
Ensure that the upstream AC input circuit breaker is OFF, and attach labels such as "No
operations allowed."
Switch off all circuit breakers before installing power cables.
Procedure
Step 1 Route 127/220 V AC three-phase three-wire input power cables through the protective panel
on the top of the subrack.
Step 2 Secure the AC input power cables to corresponding AC input circuit breakers.
(1) ACDB
----End
6 Commissioning
If you select an undesired language, remove and then insert the SMU. Select a language again after the
SMU restarts.
If battery routes 1 and 2 are respectively connected to a battery string (each battery string consists of
four 12 V, 150 Ah batteries in series), set Battery1 Connected and Battery2 Connected to Yes and
others to No, and set Rated Capacity to 150 Ah.
If battery route 1 is connected to two battery strings in parallel (each battery string consists of four
12 V, 150 Ah batteries in series), set Battery1 Connected to Yes and others to No, and set Rated
Capacity to 300 Ah.
----End
Step 3 Set the IP Addresses and Ports for the active and standby servers of the NetEco on the LCD,
as described in Table 6-7.
----End
----End
Information Description
SNMP version SNMP version and port number used by the SMU and NMS.
The SNMP versions include SNMPv1, SNMPv2c, and
SNMP Port Number SNMPv3.
Read Community Name If you use SNMPv1 or SNMPv2c, enter the read community
name and write community name that comply with the NMS.
Write Community Name Otherwise, the SMU will not connect to the NMS.
User Name To enhance the security, you need a user name and password
for authentication if you use SNMPv3. After the authentication
MD5 Password succeeds, the SMU can communicate with the NMS.
DES Password
Trap Target Address IP address and port number reported in the alarm trap.
Trap Port
Procedure
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 6-10.
Step 3 Open the browser (for example, Internet Explorer 8) and choose Tools > Internet Options.
Step 4 Click the Advanced tab and select Use TLS 1.0, Use TLS 1.1, and Use TLS 1.2.
Step 5 Enter the IP address for the SMU in the address box of Internet Explorer (for example:
https://192.168.0.10). Log in to the WebUI on the login page shown in Figure 6-2.
The preset user name is admin and the preset password is Changeme.
You can set SNMP parameters on the WebUI locally or remotely.
----End
Follow-up Procedure
You can query the power system operating status, active alarms, and the names of
user-defined dry contact inputs, and configure dry contact outputs on the NMS that is
connected over the SNMP.
To avoid damage to batteries, reinstall battery fuses only after you correctly set battery
parameters on the SMU.
Procedure
Step 1 Switch off the upstream AC input circuit breaker.
Step 2 Reinstall battery fuses.
Step 3 Switch on the upstream AC input circuit breaker.
Step 4 Switch all the circuit breakers to the appropriate status based on site requirements.
Step 5 Observe the power system for 15 minutes. If no alarm (excluding door status alarms) is
generated on the LCD during this period, the voltages and currents for batteries and loads are
normal.
Before delivery, the battery switch is set to AUTO and the system is under automatic
control.
Open the cover and flip the battery switch to MANUAL only when you need to forcibly
connect the battery supply. Flip the battery switch back to AUTO after commissioning.
----End
7 Maintenance
Measures
1. Check whether the AC input cable is loose. If yes, secure the AC input cable.
2. Check whether the AC input circuit breaker is OFF. If yes, handle the back-end circuit
failure and then switch on the circuit breaker.
3. Check whether the AC input voltage is lower than 50 V AC. If yes, handle the mains
grid fault.
Measures
1. Check whether the AC overvoltage alarm threshold is properly set. If no, adjust it to a
proper value.
2. Check whether the AC input voltage exceeds the AC overvoltage alarm threshold (280 V
AC by default). If yes, handle the AC input fault.
Measures
1. Check whether the AC undervoltage alarm threshold is properly set. If no, adjust it to a
proper value.
2. Check whether the AC input voltage is below the AC undervoltage alarm threshold (180
V AC by default). If yes, handle the AC input fault.
Measures
1. Check whether the DC overvoltage alarm threshold (58 V DC by default) is properly set.
If no, adjust it to a proper value.
2. Check whether the system voltage is set too high in manual mode. If yes, confirm the
reason and adjust the voltage to normal after the operation.
3. Remove the rectifiers one by one and check whether the alarm is cleared. If the alarm
still exists, reinstall the rectifier. If the alarm is cleared, replace the rectifier.
Measures
1. Check whether an AC power failure occurs. If yes, resume the AC power supply.
2. Check whether the DC undervoltage alarm threshold (45 V DC by default) is properly
set. If no, adjust it to a proper value.
3. Check whether the load current is greater than the current power system capacity. If yes,
expand the power system capacity or reduce the load power.
4. Check whether the system voltage is set too low in manual mode. If yes, confirm the
reason and adjust the voltage to a proper value after the operation.
5. Check whether the power system capacity is insufficient for the loads due to rectifier
failures. If yes, replace the faulty rectifier.
Measures
1. Check whether an alarm is generated for rectifier communication interruption. If yes,
remove the rectifier and reinstall it to check whether the alarm is cleared. If the alarm
still exists, replace the rectifier.
2. Remove the SMU and reinstall it to check whether the alarm is cleared. If the alarm still
exists, replace the SMU.
Measures
1. Check whether an AC power failure occurs. If yes, resume the AC power supply.
2. Check whether loads are manually disconnected. If yes, confirm the reason of the
manual disconnection, and reconnect the loads after the operation.
3. Check whether the load disconnection voltage (44 V DC by default) is set too high on
the SMU. If yes, adjust it to a proper value.
4. Check whether the power system capacity is insufficient for the loads due to rectifier
failures. If yes, replace the faulty rectifier.
5. Check whether the load current is greater than the current power system capacity. If yes,
expand the power system capacity or reduce the load power.
Measures
1. Check whether an AC power failure occurs. If yes, resume the AC power supply.
2. Check whether batteries are manually disconnected. If yes, confirm the reason of the
manual disconnection, and reconnect the batteries after the operation.
3. Check whether the battery disconnection voltage (43.2 V DC by default) is set too high
on the SMU. If yes, adjust it to a proper value.
4. Check whether the power system capacity is insufficient for the loads due to rectifier
failures. If yes, replace the faulty rectifier.
5. Check whether the load current is greater than the current power system capacity. If yes,
expand the power system capacity or reduce the load power.
Measures
1. Check whether the battery circuit breaker trips or battery fuse detection cable is
disconnected. If yes, reconnect the cable.
2. Check whether the battery circuit breaker trips or battery fuse is blown. If yes, rectify the
battery loop fault and then switch on the circuit breaker or replace the fuse.
3. Manually switch on or switch off the battery contactor and check the battery current
changes accordingly. If no, replace the contactor.
This alarm is generated only for the power system that has ambient temperature sensors installed.
Possible Causes
The ambient overtemperature alarm threshold is not set properly on the SMU.
The temperature control system is faulty in the cabinet where the ambient temperature
sensor is located.
The ambient temperature sensor is faulty.
Measures
1. Check whether the ambient temperature alarm threshold (55°C by default) is properly set
on the SMU. If no, adjust it based on site requirements.
2. Check whether the temperature control system in the cabinet is faulty. If yes, rectify the
fault. The alarm is cleared when the cabinet temperature falls within the allowed range.
3. Check whether the ambient temperature sensor is faulty. If yes, replace the temperature
sensor.
This alarm is generated only for the power system that has ambient temperature sensors installed.
Possible Causes
The ambient undertemperature alarm threshold is not set properly on the SMU.
The temperature control system is faulty in the cabinet where the ambient temperature
sensor is located.
The ambient temperature sensor is faulty.
Measures
1. Check whether the ambient undertemperature alarm threshold (-20°C by default) is
properly set on the SMU. If no, adjust it based on site requirements.
2. Check whether the temperature control system in the cabinet is faulty. If yes, rectify the
fault. The alarm is cleared when the cabinet temperature falls within the allowed range.
3. Check whether the ambient temperature sensor is faulty. If yes, replace the ambient
temperature sensor.
This alarm is generated only for the power system that has humidity sensors installed.
Possible Causes
The ambient overhumidity alarm threshold is not set properly on the SMU.
The humidity is too high in the cabinet where the humidity sensor is located.
The humidity sensor is faulty.
Measures
1. Check whether the ambient overhumidity alarm threshold (95% RH by default) is
properly set on the SMU. If no, adjust it based on site requirements.
2. Check whether water intrudes into the cabinet. If yes, wipe the water with dry cotton or
other tools and rectify the fault.
3. Check whether the humidity sensor is faulty. If yes, replace the humidity sensor.
This alarm is generated only for the power system that has humidity sensors installed.
Possible Causes
The ambient underhumidity alarm threshold is not properly set on the SMU.
The humidity is too low in the cabinet where the humidity sensor is located.
The humidity sensor is faulty.
Measures
1. Check whether the ambient underhumidity alarm threshold (5% RH by default) is
properly set on the SMU. If no, adjust it based on site requirements.
2. Check whether the cabinet humidity is too low. If yes, adjust the cabinet humidity. The
alarm is cleared when the humidity falls within the allowed range.
3. Check whether the humidity sensor is faulty. If yes, replace the humidity sensor.
This alarm is generated only for the power system that has battery temperature sensor installed.
Possible Causes
The battery overtemperature alarm threshold is not set properly on the SMU.
The battery temperature controlling system is faulty.
Measures
1. Check whether the battery overtemperature alarm threshold (50°C by default) is properly
set. If no, adjust it to a proper value.
2. Check whether the battery temperature controlling system is faulty. If yes, rectify the
fault. The alarm is cleared when the battery temperature falls within the allowed range.
3. Check whether the battery temperature sensor is faulty. If yes, replace the temperature
sensor.
This alarm is generated only for the power system that has battery temperature sensor installed.
Possible Causes
The battery undertemperature alarm threshold is not set properly on the SMU.
The battery temperature controlling system is faulty.
The battery temperature sensor is faulty.
Measures
1. Check whether the battery undertemperature alarm threshold (-10°C by default) is
properly set. If no, adjust it to a proper value.
2. Check whether the battery temperature controlling system is faulty. If yes, rectify the
fault. The alarm is cleared when the battery temperature falls within the allowed range.
3. Check whether the battery temperature sensor is faulty. If yes, replace the temperature
sensor.
This alarm is generated only for the power system that has door status sensor installed.
Possible Causes
The cabinet doors are open.
The door status sensor is faulty.
Measures
1. Close cabinet doors.
2. Check whether the door status sensor is faulty. If yes, replace the door status sensor.
This alarm is generated only for the power system that has water sensors installed.
Possible Causes
Water intrudes into the cabinet.
The water sensor is faulty.
Measures
1. Check whether water intrudes into the cabinet. If yes, wipe the water with dry cotton or
other tools and rectify the fault.
2. Check whether the water sensor is faulty. If yes, replace the water sensor.
This alarm is generated only for the power system that has smoke sensors installed.
Possible Causes
There is smoke inside the cabinet.
The smoke sensor is faulty.
Measures
1. Check whether there is smoke inside the cabinet. If yes, disconnect the power supply
from the cabinet, handle the fault, and then resume system operation and clear the alarm
on the SMU.
2. Check whether the smoke sensor is faulty. If yes, replace the smoke sensor.
Measures
1. Check the Fault indicator on the rectifier panel. If it is steady red, remove the rectifier,
and then reinstall it after the indicator turns off.
2. If the alarm still exists, replace the rectifier.
Measures
1. Check whether the AC input voltage exceeds the upper threshold of the rectifier working
voltage. If yes, rectify the power supply fault and then resume the power supply.
2. Check whether the AC input voltage is below the lower threshold of the rectifier working
voltage. If yes, rectify the power supply fault and then resume the power supply.
3. Check whether the ambient temperature is higher than the normal operating temperature
of the rectifier. If yes, check and rectify the temperature unit fault.
4. Remove the rectifier that generates the alarm and reinstall it after the indicator turns off.
If the alarm still exists, replace the rectifier.
Measures
1. Check whether the rectifier is removed. If yes, reinstall it.
2. If the rectifier is in position, remove the rectifier and reinstall it.
3. If the alarm still exists, replace the rectifier.
Measures
1. Check whether the load circuit breaker trips or fuse is blown. If yes, rectify the back-end
circuit fault and then switch on the circuit breaker or replace the fuse.
2. Check whether the load circuit breaker or fuse detection cable is disconnected. If yes,
reconnect the cable.
Measures
1. Check whether the DC SPD detection cable is disconnected. If yes, reconnect the cable.
2. Check whether the DC SPD detection cable is disconnected. If no, replace the DC SPD.
Ensure that loads are supplied with power when replacing major components. For example,
keep the switches for primary loads in the ON position, and do not turn off the battery
switch and AC input switch at the same time.
Seek the customer's prior consent if load disconnection is required.
Do not maintain devices on raining days, preventing water from entering and damaging
devices.
Protect yourself from being burnt when moving the rectifier because the rectifier has a high
temperature.
Procedure
Step 1 Put on protective gloves.
Step 2 Push the locking latch at the right side of the panel towards the left.
Step 3 Gently draw the handle outwards, and then remove the rectifier from the subrack, as shown in
Figure 7-1.
Step 4 Push the locking latch on the new rectifier towards the left, and pull out the handle.
Step 5 Place the new rectifier at the entry to the correct slot.
Step 6 Gently slide the converter into the slot along guide rails until it is engaged. Close the handle,
and push the locking latch towards the right to lock the handle, as shown in Figure 7-2.
Follow-up Procedure
Pack the removed component, and return it to Huawei local warehouse.
Procedure
Step 1 Push the locking latch towards the left.
Step 2 Pull the handle outwards to remove the SMU, as shown in Figure 7-3.
Step 3 Insert a new SMU into the subrack, push the locking latch towards the left, and pull out the
handle.
Step 4 Slide the new SMU into the subrack slowly along the guide rail, pull in the handle, and then
push the locking latch towards the right.
Step 5 Reset parameters on the SMU.
----End
Follow-up Procedure
Pack the removed component, and return it to Huawei local warehouse.
Procedure
Step 1 Connect the ground cable to the ESD wrist strap, and wear the ESD wrist strap and ESD
gloves.
Step 2 Record the positions on the UIM02C panel for connecting signal cables and disconnect the
cables.
Step 3 Unscrew the UIM02C panel and remove the UIM02C, as shown in Figure 7-5.
Step 4 Record the positions where the PCB connects to all the cables, and then disconnect the cables.
Step 5 Remove the PCB.
Follow-up Procedure
Pack the removed component, and return it to Huawei local warehouse.
Before replacing an AC circuit breaker, switch off the input circuit breaker on the upper-level
device.
You have obtained the cabinet door key, insulation tapes, and tools.
The new circuit breaker is intact and has the same specifications as the original one.
Procedure
Step 1 Unscrew and remove the cover before the circuit breaker.
Step 2 Switch off the circuit breaker that is to be replaced.
Step 3 Record positions where the cables and signal cable terminals connect to the circuit breaker.
Step 4 Loosen the screw that secures the upper port of the circuit breaker by using a Phillips
screwdriver, and remove the power cable and signal cable terminals. Wrap the cable and
terminals by using the insulation tape to prevent hazards.
Step 5 Loosen the screw that secures the lower port of the circuit breaker by using a Phillips
screwdriver, and loosen the buckle at the circuit breaker base by using an insulated flat-head
screwdriver.
Step 6 Remove the circuit breaker from the guide rail. Figure 7-7 shows the procedure for removing
the circuit breaker.
Step 7 Switch off the new circuit breaker. Press the buckle at the circuit breaker base by using an
insulated flat-head screwdriver and install the new circuit breaker. Then loosen the buckle and
secure the circuit breaker to the guide rail.
Step 8 Tighten the screw that secures the lower port of the circuit breaker.
Step 9 Remove the insulation tape from the output power cable and signal cable terminals. Then
connect the power cable and signal cable terminals to the upper port of the circuit breaker and
tighten the screw.
Step 10 Switch on the circuit breaker. Figure 7-8 shows the procedure for installing the new circuit
breaker.
Step 11 Place the cover before the circuit breaker, and tighten the screws for it.
----End
Context
Fuses are hot-swappable, so you do not need to disconnect the AC input to the power system.
Power supply to loads may be disconnected if an intact fuse is being replaced. Ask for
customers' consent before the replacement.
Procedure
Step 1 Remove the old fuse, as shown in Figure 7-9.
1. Enclose the mounting ears of the fuse into the two holes in the fuse extracting unit.
2. Move the fuse extracting unit upwards to lock the fuse.
3. Hold the fuse extracting unit and pull out the fuse.
4. Press the button on the fuse extracting unit.
5. Move the fuse to separate the fuse from the fuse extracting unit.
----End
A Technical Specifications
Item Specifications
Operating temperature -40°C to +65°C
Transport temperature -40°C to +70°C
Storage temperature -40°C to +70°C
Operating humidity 5%–95% RH (non-condensing)
Storage humidity 5%–95% RH (non-condensing)
Altitude 0 m to 4000 m
(When the altitude ranges from 2000 m to 4000 m, the operating
temperature decreases by 1°C for each additional 200 m.)
Item Specifications
AC input Input system 127/220 V AC three-phase,
three-wire
Input frequency 45–66 Hz (rated frequency: 50 Hz or
60 Hz)
Power factor (PF) ≥ 0.99 (rated input and load)
DC output Output voltage range –42 V DC to –58 V DC
Default output voltage –53.5 V DC
Maximum output power ETP48200-C5D2: 12000 W
(supports N+1 rectifier backup
and maximum output current of
200 A)
ETP48400-C6A5: 24000 W
(supports N+1 backup and
Item Specifications
maximum output current of 400
A)
Regulated voltage precision ≤ ±1% (output voltage of within 53.5
V ±0.1 V at 50% load)
Peak-to-peak noise voltage ≤ 200 mV (rated input voltage and
load)
Psophometrically weighted ≤ 2 mV (300–3400 Hz; input power ≤
noise 264 V AC)
Current sharing imbalance ≤ ±5% (50%–100% load)
AC input AC input overvoltage ≥ 300 V AC
protection protection threshold
AC input overvoltage 290–300 V AC
recovery threshold
AC input undervoltage ≤ 80 V AC
protection threshold
AC input undervoltage 80–90 V AC
recovery threshold
DC output DC output overvoltage –58.5 V DC to –60.5 V DC
protection protection threshold If overvoltage occurs due to an
internal fault, the rectifier locks
out.
If the external voltage is greater
than –63 V DC for more than 500
ms, the rectifier locks out.
DC surge Differential mode: 10 kA (8/20 μs); common mode: 20 kA (8/20 μs)
protection
Safety IEC/EN60950-1/GB 4943 and CE certification
Mean time 200,000 hours (at 25°C)
between failures
(MTBF)
Item Specifications
Electromagnetic Conducted emission (CE) AC port: EN 55022 class B
interference
(EMI) DC port: EN 55022 class A
Radiated emission (RE) EN 55022 class B
Harmonic current IEC 61000-3-12
Item Specifications
Voltage fluctuation and flick IEC 61000-3-3
EMS Electrostatic discharge (ESD) IEC 61000-4-2
Shell port: contact discharge of 6
kV and air discharge of 8 kV;
signal port: contact discharge of 2
kV
Electrical fast transient (EFT) IEC 61000-4-4
AC and DC power ports: 2 kV
Radiated susceptibility (RS) IEC 61000-4-3
10 V/m field strength
Conducted susceptibility (CS) IEC 61000-4-6
Power port: 10 V; signal port: 3 V
Surge immunity IEC 61000-4-5
AC and DC power ports: 2 kV
(8/20 µs) in differential mode, 4 kV
(8/20 µs) in common mode
Voltage dips immunity (DIP) IEC 61000-4-11
Item Specifications
Power system dimensions ETP48200-C5D2: 220 mm x 482 mm x 330 mm
(H x W x D) ETP48400-C6A5: 264.8 mm x 482 mm x 330 mm
Weight ≤ 25 kg (excluding modules)
Protection level IP20
Installation mode Installed in a rack
Cabling Routed in and out from the top
Maintenance mode Maintained from the front
Heat dissipation mode Natural heat dissipation
A
ACDB alternating current distribution box
B
BBU baseband unit
BLVD battery low voltage disconnection
E
EFT electrical fast transient
EMC electromagnetic compatibility
ESD electrostatic discharge
H
HTTPS Hypertext Transfer Protocol Secure
I
IP Internet Protocol
L
LCD liquid crystal display
LLVD load low voltage disconnection
M
MTBF mean time between failures
P
PDU power distribution unit
R
RS radiated susceptibility
S
SMU site monitoring unit
SNMP Simple Network Management Protocol
SPD surge protection device
T
THD total harmonic distortion
U
UIM user interface module