F2-9

FABRICATION INSPECTION REPORT

PLTU 2 BANTEN-LABUAN (2x300MW)


PT TRUBA JAYA ENGINEERING (T-3107)

ANTI CORROSIVE INSPECTION REPORT (ACR)


OWNER : PT. PLN (PERSERO) REPORT NO. : R-PIP-ACR-XXX
CLIENT : Chengda Eng. Corp. of China REF. DWG NO. :
ITEM NAME : TYPE OF INSPECTION : Visual Inspection
TEMP. : - Thickness Check
SERVICES : DATE :

ANTI CORROSIVE DATA


Anti Corrosive Specification & Thickness Surface preparation
Prime coating : Metal surface as per spec. (Sa. 2,5) or St. 3
Intermediate Coating : Inspection Status
Finished Coating : √ Acceptable Not acceptable

Application Method (Manufacturer's recommendation) Workmanship ( Appearance/test )


Brush No drips √ No sags √
Roller No runs √ No pinhole √

Coating system to be inspected Pinhole Inspection


Finish Coat Holiday Test

Weather Condition
Humidity : Temp. : °C

Sand Blast Time : Prime Coat Time :


Date : Date :

Drawing Number Measurement Location


No. & Pipe Point A (µm) Pipe Point B (µm) Pipe Point C (µm) Avg. Result
Spool Number 0º 90º 180º 270º 0º 90º 180º 270º 0º 90º 180º 270º

Sketch : A B C

Prepared & Inspected by, Witnessed & Approved by,

PT. Truba Jurong Engineering Chengda Engineering Corp. of China