Odette Damages

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

DETAILED ESTIMATE ON THE DAMAGES OF TYPHOON ODETTE

No. Description Qty Unit Unit Cost Total Cost


1 Glass Windows (Tainted)
with aluminum casement 38.163 sq.m ₱ 6,258.00 ₱ 238,824.05
2 Pre-painted Flashing 29.2 ln.m ₱ 425.00 ₱ 12,410.00
3 Pre-painted Gutter 12.2 ln.m ₱ 488.00 ₱ 5,953.60

Material Cost: ₱ 257,187.65


Labor Cost: ₱ 154,312.59
TOTAL COST ₱ 411,500.25

Quantity Computation for Glass Windows


Window Length Height Area Qty
1 1.20 m 1.62 m 1.94 sq.m. 1
2 1.80 m 1.62 m 2.92 sq.m. 1
3 2.45 m 2.05 m 5.02 sq.m. 1
4 1.73 m 2.10 m 3.63 sq.m. 1
5 2.40 m 2.15 m 10.32 sq.m. 2
6 1.25 m 1.15 m 2.88 sq.m. 2
7 1.85 m 2.15 m 3.98 sq.m. 1
8a 1.80 m 1.40 m 2.52 sq.m. 1
8b 1.80 m 1.40 m 2.52 sq.m. 1
9 0.80 m 0.60 m 0.48 sq.m. 1
10a 0.79 m 0.50 m 0.40 sq.m. 1
10b 1.20 m 0.50 m 0.60 sq.m. 1
11 0.60 m 0.80 m 0.96 sq.m. 2
TOTAL AREA 38.16 sq.m.

Prepared by:

Lino G. Apostadero Jr.


Civil Engineer
License No.: 0159182

You might also like