The document discusses three tasks: 1) Assembly of a probe card for machine assembly. 2) Investigation of driver faults onsite, where two AZN drivers had no response to power cycling and one LRD driver had errors, requiring checks of power connections, voltages, LAN cables, and programming. 3) Replacement of an old Z-axis stage with a new one on a WLBI 6, including installation of a chuck and verification tests with and without a pro.
The document discusses three tasks: 1) Assembly of a probe card for machine assembly. 2) Investigation of driver faults onsite, where two AZN drivers had no response to power cycling and one LRD driver had errors, requiring checks of power connections, voltages, LAN cables, and programming. 3) Replacement of an old Z-axis stage with a new one on a WLBI 6, including installation of a chuck and verification tests with and without a pro.
The document discusses three tasks: 1) Assembly of a probe card for machine assembly. 2) Investigation of driver faults onsite, where two AZN drivers had no response to power cycling and one LRD driver had errors, requiring checks of power connections, voltages, LAN cables, and programming. 3) Replacement of an old Z-axis stage with a new one on a WLBI 6, including installation of a chuck and verification tests with and without a pro.
- Investigate driver faulty - Detect 2 unit AZD driver no power cycle response and 1 unit LRD driver got error issues. - Recheck every power connection and take voltage in consumption. - Recheck every LAN cable connection to driver. - Align with programmer to recheck whether program got problem or not.
3. Z-axis stage installation/verification on wlbi 6
- Replace the old z-axis stage with new one. - Install chuck and do verification onto chuck. - Proceed with dry run with/without pro