Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.

11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701

MEMORANDUM
February 4, 2023
To: RICARDO BRITO, MBA
CEO/President
From: ENGR. ROBERTO ROSALES, MSc.M.E.
Cc: ChesterL/ManuelB/KevinK/SusanAY/LorelaE
Subject: Consultant’s Works – Jan 30 to Feb 4, 2023

Hi Sir,
Good day!
Sharing Consultant’s Report for the Week

Jan 30
Discussion with Engr Patrick/Engr Albert
Please consider the following:
ON BOQ Revision
1. BOQ for Legaspi. Submit Jan 25, 2023
1.1. for MCC and electrical works, please follow the cost/tr derived from Dumaguete
1.2 for fabric duct, please follow 2,600 per meter since we are using 700mm dia, 250 pascal ESP
2. BOQ for Alaminos. Submit by Jan 25, 2023
1. for MCC, please do the same as above, derive the cost/tr on EE works
2. for fabric duct, to follow the 2600 per meter.

On drawing revisions
1. for Alaminos, we can use the 8 units of 41TR LSQ160 but adopt the template of Roxas
Palawan. We need to raise the chiller, by adopting the platform to compensate for the effect of
the roof which can cause short cycle on the airflow discharge of Aircooled Chiller. We need to
adopt the chiller configuration platform for the Grand Marina. Please coordinate with Rirance
regrading roof elevation. Another cheaper option is to provide fan duct extension for the blower
without exceeding the 70 pascal ESP if platform will be an issue.
2. for Legaspi, consider the MCC layout and pump room layout

Please consider shipping cost similar to 50 to 60 k for Alaminos and 100k for Legaspi as part of
General Mobilization cost.

1|Page
UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.
11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701
Jan 31
Discussion with Engr Patrick Tolentino/Engr Albert Fiel
Please update our BOQ for the above subject project based on the latest data provided by
AEDIS. Reissue to Rirance the BOQ based on the attached development. Also, please
incorporate provided details and attachment tools on our design drawings for standardized fabric
duct design.
Incorporate in our general notes the following
1. Fabric duct shall be 40% permeability of ductwork for condensation control.
2. Fabric duct shall have minimum of 30mm to 40mm dia at 8 to 10 air outlets per 1.2 meter
length.
3. Thickness of fabric duct shall be capable of handling 125 pascal to 250 pascal external static
pressure operating range

Please use 1USD=55USD as current foreign exchange rate.

Feb 1
Comments on Submitted Nicotra Proposal as discussed with Engr ManuelB
Re: Stainless blade as per specs vs proposed GRP – To resubmit
Hi Denzel,

Good morning.
I noticed a different specs was submitted with the use of Glass reinforce plastic material instead
of what we have in the specs of stainless blade for SHF.
Please note the fan shall be used for Smoke Exhaust and therefore we would need the previous
specs of aluminum or stainless blade which ever is economical for the project.

Please resubmit asap.

Feb 2
Comments on the Proposal Submitted by Qingdao AEDIS Fabric Duct as shared to Ms. Joharra
and Engr Manuel
Hi Jo,

Good morning.

Please request AEDIS to confirm the following.

1. To confirm or include delivery cost CNF Manila


2. To confirm Fabric Duct thickness capable of handling ESP based on 125 pascal to 250pascal
ESP(external static pressure
3. To confirm LOGO Inscription " UNITOP" as suggested by Engr Manuel

4. To confirm size of steel cable in mm diameter

2|Page
UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.
11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701
5. To confirm 40% permeability of Fabric Duct for condensation control
6. To confirm number of air outlet per 1.2 meter length
7. To confirm diameter of air outlet
8. To confirm fireproof material to be used for fabric duct(fire rating classification)

Submit computer air simulation data on terminal air velocity per air outlet as applicable.

Feb 3
Scheduled visit to San Jose Mindoro for follow thru on Gym Project for Feb 6 meeting with
Councilor Aguilar

February 4
1. Discussion on the M&E Design Standards via ME Forum
2. ASHRAE Journal for January 2023

Submitted for documentation and future references.

The above is submitted for documentation and future references

Thank you.

ENGR. ROBERTO G. ROSALES, MScME


ASHRAE – IOR - PSME
HVAC CONSULTANT
REC - UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.,
A: 11/F Ri-Rance Corporate Center 1
Aseana Ave., Parañaque City 1701
Email: bengr.untiech@unitopph.com
T: +632-657-1677
M: +639175764804

/REC/File

3|Page

You might also like