Professional Documents
Culture Documents
ASSIGNMENT 02 11032024 093223am
ASSIGNMENT 02 11032024 093223am
ASSIGNMENT NO. 02
Factory overhead:
Department X Rs 4.5 per hour Rs 5.5 per hour
Department Y Rs 6 per hour Rs. 7 per hour
Factory overhead is based on direct labor hours. Company sold goods 40% above cost of Job
1200 and Job 1400 at 45% above cost to customer
Required
a. A Job Cost Sheet for Job No. 1400
b. Mr. Shujaa is a carpenter and makes furniture for clients as per their demand in his shop.
Which costing system do you think is to be followed by him.
Page 1 of 1