QUESTION 1
Alumco manufactures aluminium sheets and aluminium bars. The maximum
UEMM 3243 ENGINEERING ANALYSIS production capacity is estimated at either 800 sheets or 600 bars per
day. The maximum daily demand is 550 sheets and 560 bars. The profit
per ton is RM 40 per sheet and RM 35 per bar. Determine the optimal
Exercise daily production mix.
Maximum 40 hours of labor and 120 pounds of clay available each day for
production
10/2/2018
In any one-day, there are 60 man-hours available in the metal work station, 125 man-
hours in the fitting section, 132 man-hours available in the electrical section and 30 man-
hours in the finishing section. Power Plus gets RM 700 profit on each refrigerator, RM
800 on each washing machine and RM 400 on each air conditioner. Read the problem
carefully and formulate it as an LP model for maximizing profit.
SOLUTION - QUESTION 4