Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TTC - Technical Training Programme

Training Instructor (TI) Mode of Training


Batch Time Slot Date Topic of Training TI-Remarks & Sign
Name Designation Dept. Online offline
Organization Introduction
TTC15 2nd half 13.2.2024 Sector Information Ajay Kumar Sr. Engineer TSD No Yes
Industrial Oil Brief
Machine System
MLC - LVDH Machine
TTC15 1st & 2nd half 14.2.2024 Ajay Kumar Sr. Engineer TSD No Yes
FS Machine/Flushing system

TTC15 1st half 15.2.2024 MLC-LVDH-TRIX Machine Ajay Kumar Sr. Engineer TSD No Yes

Testing Equipment
Karl Fischer Titrator
BDV Tester
Particle Counter - LPA3
TTC15 2nd half 15.2.2024 Ajay Kumar Sr. Engineer TSD No Yes
Millipore Patch Setup
Manual TAN Tiration Setup
MPC Varnish Potential

TOFM
TTC15 1st & 2nd half No

16.2.2024 ELC Ajay Kumar Sr. Engineer TSD Yes

MLC-LVDH-ELC
TTC15 1st & 2nd half No

17.2.2024 Coalescer & Separator system Ajay Kumar Sr. Engineer TSD Yes

TTC15 1st half 19.2.2024 Machine Design Balasahab Nehe Manager MED No yes
TTC15 2nd half 19.2.2024 Machine Production Vinod Z Sr. Manager MPD No Yes

TTC15 1st half 20.2.2024 After Sales & Services Alok Singh Manager ASS No yes
TTC15 2nd half 20.2.2024 Machine Electrical Control System Sridhar B Manager Electrical No Yes

TTC15 1st half 21.2.2024 Quality Control Neha F Executive MQD No yes
TTC15 2nd half 21.2.2024 Lubrication Reliability Project Niranjan Singh, Atmaram K Manager MOMS No yes

TTC15 1st half 22.2.2024 Project Management Ravikiran V Manager PMO No yes
TTC15 2nd half 22.2.2024 R&D Yashwant Chavan Sr. Manager MRD No yes
TTC15 1st half 23.2.2024 Q&A , Training Docs Sign Ajay Kumar Sr. Engineer TSD No yes

You might also like