MATERIAL INSPECTION REPORT No.

MIR-Gh-001
[ ] Civil [ ] Electromechanical [ ] Electrical [ ✔ ] Other: Security Systems

RFI REFERENCE No. : MIR-Gh-001

DELIVERY DATE : 28-Dec-2023 INSPECTION DATE : 7-Mar-2024


CONTRACTOR : Advanced Communications and Electronics Systems (ACES)
CONTRACT No. : 4400017056 JOB ORDER No. : 1-2139015.04
PROJECT NAME : Installation of Security Systems for Transmission Substations EOA Phase 4

CONT. SUPPLER/ RECEIVED % ITEM CASE/


ITEM DESCRIPTION LOCATION
ITEM # MANUFACTURER QTY. WEIGHT CREATE

2.1.1 Closed Circuit Television (CCTV) Gulf Applicatinos


System with Digital Video /Haneha
Recording, Alarm and ALPR
System: a: 2MP IR Dome Camera 181
b: 2MP IR Bullet Camera 209
c: 2MP IR PTZ Camera 52

Note: Item number and description provided above as per Schedule-C.

Enclosed Documents: ✔ Delivery Note, Packing List, Company Approval, Release of Shipment,

Manufacturer Storage Recommendation, Other:

Inspection Result: [ ] Accepted [ ] Not Accepted

Comments if any:

INSPECTED BY: SEC/PDC Representative RECEIVED BY: Contractor’s Project Manager


NAME: NAME: Eng. Abdulrahim Alghazali

SIGNATURE: DATE: SIGNATURE: DATE:

CONCURRED BY: SEC/PDC Project Manager / Engineer


NAME:

SIGNATURE: DATE: