1 2 3 4 5 6 7 8

KEY PLAN:

A A

4.5 m 20CM

10CM 10CM
LEGEND:

B B

2.5 m 12CM

15CM
15CM
C C

15CM
15CM
15 CM X15 CM SOLID SECTION JOINT
D 5m GALVANIZED WITH I SECTION D

40CM
I SOLID SECTION STEEL

16 MM SQUARE STEEL BAR JOINT 12CM


E WITH RECTANGLE 5cm and 2.5cm 0m 2m 4m 5m 6m 10m

VISUAL SCALE 1:100 @ A0

2.5 m 12CM
REV/01 ISSUED FOR APPROVAL 28/01/2024 ENG/ALAM

ISSUE NO: DESCRIPTION DATE BY


PURPOSE OF ISSUE:
FOR APPROVAL

12 CM X12 CM SOLID SECTION FREE


CLIENT: PROJECT MANAGEMENT CONSULTANT:

JOINT WITH RECTANGLE 15CM


SECTION
F
F

UPPER VIEW DESIGN CONSULTANT:


BECHTEL ENGINEERING COMPANY
CONTRACTOR:

STEEL RAMP
DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN ENG/ALAM 28/01/2024


CHECKED ENG/ASAD 28/01/2024 CHECKED
APPROVED ENG/SABEIL 28/01/2024 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:
CIVIL
STEEL YARD RAMP
SHEET-2 OF 4
PROJECT NAME :
Logistic Facilities in the Connector
(CH 00+000 to CH 75+000)
Work Order No .1100001344/015
INITIAL SITE PREPARATION
NEOM
KINGDOM SAUDI ARABIA
H REGION ASSET CODE CONTRACT CODE H
18 606000 1100001344
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

ASB CIV SHD