Design Padardi Percolation Tank
Design Padardi Percolation Tank
PORBANDAR
Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Porbandar
Avrg
District/ Rain fall
Sr.No.
Taluka (1993-
2023)
1 Kutiana 807
2 Porbandar 727
3 Ranavav 816
CALCULATION OF YIELD
Elevation Area
Capacity
(m) (sq.Mile)
4 0.11 7.30
4.5 0.22 14.60
5 0.4 26.54
5.5 0.65 43.13
6 0.95 63.04
6.5 1.27 84.27
7 1.57 104.18
7.5 1.8 119.44
8 1.93 128.07
60
Q = X 128.07
100
= 76.842 Cumecs
= 2713.68 Cusecs.
Q= 2714.00 Cusecs.
Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Where,
Q Q = Designed Discharge
L =
3/2
C (H) = 2714.00 Cusecs.
2714.00 3 C = Constant
=
3.10 x 3.936 2 = 3.10
L= 34.21 m
Say = 35.00 m
Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Name of work :-
Fixing of F . S. L . R. L
3 H.F.L R L. = 9.20 mt
5 T.B.L R L = 10.70 mt
H.F.L Calculation
Q = C x L (H) *
3/2
3/2
= x 35 x
3.10 1.20
Q = 142.63 Cumecs
HENCE TOTAL DISCHARGE COME TO 142.63 CUMEC WHICH IS MORE THAN DESIGN DISCHARE OF
128.07 CUMECS THERFORE PROVIDED HFL 9.20M IS OK
CALCULATION FOR HYDRAULIC JUMP & APRON
H F L 9.20
0.90 H. F. L
8.00
7.92
d2
d1
7.00
6.40
5.90
5.50
5.20
4.90 6.00
2.60
= 9.20 - 6.70
= 2.50 mt
h = 8.20 Ft.
Velocity V 1 = 0.9 x
V 2 g h
= 0.9 x V 2.00
X 32.20 X 8.2
= 0.9 x V 528.08
= 0.90 X 22.97
V1 = 20.67 Ft. / Sec.
Q1
d1 =
V1
= 23.64
20.67
= 1.143 Ft.
d1 = 0.348 m
2 2 2
d1 d1 4.00x d 1X V1
d2 = - + ` +
2 2 2 X g x d1
2 2 2
d2 = -
1.15
+ `
1.15 +4.00 x 1.15 X 20.67
2 2 2.00 X 32.20 x 1.15
d2 = - 0.57 + 5.57
d2 = 5 Ft.
d2 = 1.524 m
V1
Frond Number = f =
g d1
20.67
f =
32.20 X 1.15
20.67
f =
6.08
f = 3.39
Frond number is greater than 1.00 ,hence hydraulic jump will occur .
d2 - d 1 W1
Thickness of apron ( T ) = X
2 W2 - W 1
5- 1.15 X 1
=
2 2.40 - 1
= 1.92 X 0.71
= 1.36 Ft
T= 0.41 mt.
= 5.00 X 5 - 1.15
= 5.00 X 3.85
= 19.25 Ft.
L = 5.86 m
Here Looseness Factior is greater than 1 so from IS Code IS 6966-1 Scour Depth R is
Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Section at X-X
1 SBC 20.00 T/M3 EQ Coefficient Horizontal 0.05
2 Density of Water 1.00 T/M3 EQ Coefficient Vertical 0.03
3 Density of Concrete 2.30 T/M3
4 Density of Masonry 2.40 T/M3
5 Dry Density of Soil 1.53 T/M3 9.20
6 Moist Density of Soil 1.67 T/M3 0.90 8.00 8.00
7 Saturat Density of Soil 1.94 T/M3 Ep3
8 Submerg Density of Soil 0.94 T/M3
9 Silt Factor 1.00 T/M3
W1 0.60
. 1.00
4.30 6.00 bed W3 3.10
1.10 Ep2 5.20 Ep1
4.90 W2 4.90 4.90
0.56 1.58
(1/3XwXh) 2.60 (1/3XwXh)
Section at X-X
1 SBC 20.00 T/M3 7 Saturat Density of Soil 1.94 T/M3
2 Density of Water 1.00 T/M3 8 Submerg Density of Soil 0.94 T/M3
3 Density of Concrete 2.30 T/M3 9 Silt Factor 1.00 T/M3
4 Density of Masonry 2.40 T/M3 10 EQ Coefficient Horizontal 0.05
5 Dry Density of Soil 1.53 T/M3 11 EQ Coefficient Vertical 0.03
6 Moist Density of Soil 1.67 T/M3
9.20
8.00 0.90 8.00
Ep3
2.00
We W1 0.60 3.10
4.30 6.00 bed 1.00
Ep2 2.00 W3
1.10 5.20 Ep1
4.90 W2 Fdn. 4.90
-0.33 1.73
(1/3XwXh) 2.60 (1/3XwXh)
2.60
U100
2.00
Particulars Force
Crushing
Force Lever Moment Z= B/3 &
Vertical Horizont Chek Sliding chek
sign No. L B Density arm (M) M/W 2B/3
(W) (H) e = Z-B/2
W1 1 0.9 4 2.3 8.28 0 0.450 3.726 B/3 e= Friction Coefficient=
W2 1 2.6 0.3 2.3 1.794 0 1.300 2.332 = 0.253 H/W
W3 0.5 1.7 2.8 2.3 5.474 0 1.461 7.998 0.867 So 6e = 0.049
Ep1 0.5 1.73 3.10 1.94 0 -2.675 1.033 -2.764 2B/3 1.520 0.0489<0.667
Ep2 0.5 -0.33 1.10 1.94 0 -0.184 0.367 -0.067 1.05 = Pmax.& min.
Ep3 0.5 1.70 2.80 1.94 4.6172 0 2.039 9.414 1.733 10.705 Hence
We 0.5 2.00 2.00 1.00 0 2.000 0.667 0.000 Hence 2.807
U100 0.5 2.00 2.60 1.00 -2.600 0.867 -2.253
17.565 -0.858 18.386 OK OK OK
STABILITY CALCULATION OF ABUTMENT @ EMPTY CONDITION WITH EQ
Section at X-X
1 SBC 20.00 T/M3 7 Saturat Density of Soil 1.94 T/M3
2 Density of Water 1.00 T/M3 8 Submerg Density of Soil 0.94 T/M3
3 Density of Concrete 2.30 T/M3 9 Silt Factor 1.00 T/M3
4 Density of Masonry 2.40 T/M3 10 EQ Coefficient Horizontal 0.05
5 Dry Density of Soil 1.53 T/M3 11 EQ Coefficient Vertical 0.03
6 Moist Density of Soil 1.67 T/M3
9.20
0.90 8.00 8.00
Ep3
W1 0.6
1.00
6.00 6.00 bed W3 Ep1
1.10 Ep2 PCC 5.20
4.90 W2 Fdn. 4.90
0.56 1.58
(1/3XwXh) 2.60 (1/3XwXh)
Particulars Force
Force Lever Moment
Vertical Horizont
sign No. L B Density arm (M)
(W) (H)
W1 1 0.9 4 2.3 8.280 0.000 0.450 3.726
W2 1 2.6 0.3 2.3 1.794 0.000 1.300 2.332
W3 0.5 1.7 2.8 2.3 5.474 0.000 1.461 7.998
Ep2 0.5 0.56 1.1 1.67 0.000 0.309 0.367 0.113
Ep1 0.5 1.58 3.1 1.67 0.000 -2.451 1.033 -2.532
EP3 0.5 1.70 2.80 1.67 3.975 0.000 2.039 8.104
We2 0 0 0 1 0.000 0.000 0.000 0.000
19.523 -2.142 19.741
EQ EFFECT VERTICAL & HORIZONTAL
Net Force EQ Coef. Force Moment (M) Crushing
Force Lever Z= B/3 &
sign
Check Sliding check
arm M/W 2B/3
Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal e = Z-B/2
W1 8.280 0.000 0.03 0.05 0.248 0.414 0.450 0.112 0.186 B/3 e= Friction Coefficient=
W2 1.794 0.000 0.03 0.05 0.054 0.090 1.300 0.070 0.117 = 0.237 H/W
W3 5.474 0.000 0.03 0.05 0.164 0.274 1.461 0.240 0.400 0.867 So 6e = 0.063
Ep2 0.000 0.309 0.03 0.05 0.009 0.015 0.367 0.003 0.006 2B/3 1.419 0.063<0.667
1.063
Ep1 0.000 -2.451 0.03 0.05 0.074 -0.123 1.033 0.076 -0.127 = Pmax.&min.
Ep3 3.975 0.000 0.03 0.05 0.119 0.199 2.039 0.243 0.405 1.733 12.005 Hence
We2 0.000 0.000 0.03 0.05 0.000 0.000 0.000 0.000 0.000 Hence 3.526
0.668 0.869 0.744 0.987 OK OK OK
TOTAL 20.191 -1.273 21.472