PANCHAYAT IRRIGATION DIVISION

PORBANDAR

Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar

Porbandar
Avrg
District/ Rain fall
Sr.No.
Taluka (1993-
2023)
1 Kutiana 807
2 Porbandar 727
3 Ranavav 816

Reference :- Gujarat State Disaster Management Authority

CALCULATION OF YIELD

Ranavav average rainfall = = 816 mm


Percentage depandibilty = 40%

From strange table = 4.8163 sq.mile


= 1.93 sq.mile (40% Dependibility)

From Gujarat State Disaster Management Authority (1993-2023) (Rainfalldata)

Area Capcity Table

Elevation Area
Capacity
(m) (sq.Mile)
4 0.11 7.30
4.5 0.22 14.60
5 0.4 26.54
5.5 0.65 43.13
6 0.95 63.04
6.5 1.27 84.27
7 1.57 104.18
7.5 1.8 119.44
8 1.93 128.07

By S.P.F Peak Formula *


Q = a x (A)^b Where,
0.9232
= 29.0402 X 4.99 a = 29.04
= 29.0402 X 4.41 b = 0.9232
Q = 128.07 Cumecs. A = Catchments Area
= 4.99 Sq Km
A = 1.93 Sq. Miles

Taking 60 % S.P.F Peak

60
Q = X 128.07
100
= 76.842 Cumecs
= 2713.68 Cusecs.
Q= 2714.00 Cusecs.

Adopt S.P. F discharge 2714.00 Cusecs. As designed discharge.


From Revised Manuual on Prcolation tank (WRD,Ghandhinagar)
PANCHAYAT IRRIGATION DIVISION
PORBANDAR

Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar

CALCULATION FOR LENGTH OF WASTE WEIR


3/2
QC= x L ( H ) *

Where,
Q Q = Designed Discharge
L =
3/2
C (H) = 2714.00 Cusecs.

2714.00 3 C = Constant
=
3.10 x 3.936 2 = 3.10

2714.00 H = Flood Lift


=
3.10 x 7.80 = 1.20 Mt.

2714.00 H = 3.936 Ft.


=
24.18
= 112.24 Ft.

L= 34.21 m

Say = 35.00 m

Provide Length of waste weir L = 35.00 m

* From IS 6966 ( Part 1 ) : 1989


PANCHAYAT IRRIGATION DIVISION
PORBANDAR

Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Name of work :-

Fixing of F . S. L . R. L

1 F.S. L RL. = 8.00 mt

2 Flood Lift = 1.20 mt

3 H.F.L R L. = 9.20 mt

4 Free Board = 1.50 mt

5 T.B.L R L = 10.70 mt

H.F.L Calculation

Design flood = 128.07 Cumecs


Length of WW = 35.00 m

Q = C x L (H) *
3/2
3/2
= x 35 x
3.10 1.20
Q = 142.63 Cumecs

Flood lift = 1.20 m


FRL = 8.00 m
HFL = 9.20 m
Free board = 1.5 m
TOB = 10.70 m

HENCE TOTAL DISCHARGE COME TO 142.63 CUMEC WHICH IS MORE THAN DESIGN DISCHARE OF
128.07 CUMECS THERFORE PROVIDED HFL 9.20M IS OK
CALCULATION FOR HYDRAULIC JUMP & APRON

H F L 9.20

0.90 H. F. L
8.00
7.92

d2
d1
7.00

6.40

5.90

5.50
5.20
4.90 6.00
2.60

Designed discharge = 2714.00 Cusecs.


Length of Body wall = 35.00 m
= 114.80 Ft.
Assumed d 1 = 0.3 mt.

Discharge per Ft. run = Q =


Q
L
2714.00
Q =
114.80
Q = 23.64 Cusecs.
h = H.F.L - Top Of Apron + d 1

= 9.20 - 6.40 + 0.3

= 9.20 - 6.70
= 2.50 mt
h = 8.20 Ft.

Velocity V 1 = 0.9 x
V 2 g h

= 0.9 x V 2.00
X 32.20 X 8.2

= 0.9 x V 528.08
= 0.90 X 22.97
V1 = 20.67 Ft. / Sec.

Q1
d1 =
V1

= 23.64
20.67
= 1.143 Ft.
d1 = 0.348 m

Assumed = d 1 = 0.3 m = 1.15 Ft is ok.

2 2 2
d1 d1 4.00x d 1X V1
d2 = - + ` +
2 2 2 X g x d1

2 2 2
d2 = -
1.15
+ `
1.15 +4.00 x 1.15 X 20.67
2 2 2.00 X 32.20 x 1.15

4.00 x 1.32 X 427.24


d2 = - 0.57 + 0.66 +
` 2.00 X 32.20 x 1.15

d2 = - 0.57 + 0.66 + 30.45

d2 = - 0.57 + 5.57

d2 = 5 Ft.
d2 = 1.524 m
V1
Frond Number = f =
g d1
20.67
f =
32.20 X 1.15
20.67
f =
6.08
f = 3.39
Frond number is greater than 1.00 ,hence hydraulic jump will occur .

d2 - d 1 W1
Thickness of apron ( T ) = X
2 W2 - W 1

5- 1.15 X 1
=
2 2.40 - 1

= 1.92 X 0.71

= 1.36 Ft
T= 0.41 mt.

Provide thickness of apron = 0.50 mt.

Length of apron L = 5.00 X d2 - d1

= 5.00 X 5 - 1.15
= 5.00 X 3.85

= 19.25 Ft.

L = 5.86 m

provide length of apron 6.00 m as per site condition


Name of village = Padardi
Name of Taluke = Ranavav
Name of District = Porbandar
Location = R.S No.1119
Longitude = 69.84781
Latitude = 21.56606
Design flood = 128.07 Cumecs
Flood lift = 1.20 m
FRL = 8.00 m
HFL = 9.20 m
Free board = 1.5 m
TOB = 10.70 m
Foundation RL = 4.90 m
Length of Waste Weir = 35.00 m
Silt Factor = 1.00 T/M
3

SBC = 20.00 T/M


3

Density of Water = 1.00 T/M


3

Density of Concrete = 2.30 T/M


3

Density of Masonry = 2.40 T/M


3

Dry Density of Soil = 1.53 T/M


3

Moist Density of Soil = 1.67 T/M


3

Saturat Density of Soil = 1.94 T/M


3

Submerg Density of Soil = 0.94 T/M


3

Assume FRL = 8.00 m


Discharge intensity Q/ lengh = 3.66
TEL = 9.2 m
Energy1 = 6.70 m
Pre Jump Height d1 = 0.3 m
Energy2 = 7.92 m
Froude No. (F1) = 3.39 m
Post jump height d2 = 1.524 m
However provide FRL = = 8m
PANCHAYAT IRRIGATION DIVISION
Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist.

CALCULATION FOR SCOUR DEPTH


Lacy's resigm lingth (P) = 4.86(Q)^0.5
0.5
4.86 X 76.842
P = 24.87 m

Add 1.2% Concentration (Qo) = 1.2*Q


= 1.2 X 76.842
Qo = 92.21 Cumecs

Looseness Factor (L.F) = L/P


= 35 / 24.87
L.F = 1.41 >1

Consider 100% Discharge (q) = Q/:L


= 76.842/ 35.00
q = 2.195486 Cumecs

Here Looseness Factior is greater than 1 so from IS Code IS 6966-1 Scour Depth R is

Scour Depth R = 0.473 (Q/f)^0.3333


0.3333
= 0.473 x 76.842
1
R = 2.01

Required Foundation R.Lof U/S Cutoff = H.F.L - 1 X R


= 9.20 - 1.00 X 2.01
= 9.20 - 2.01
= 7.19 m `
SAY = 7m

Required Foundation R.Lof d/S Cutoff = H.F.L - 1.25 X R


= 9.20 - 1.25 X 2.01
= 9.20 -` 2.51
= 6.69
SAY = 6.00 m
As site condition SAY = 5.5 m
STABILITY CALCULATION OF SIDE WALL @ EMPTY CONDITION

Name of work :- Strengthening work of Padardi Village at. Ta. Ranavav & Dist. Porbandar
Section at X-X
1 SBC 20.00 T/M3 EQ Coefficient Horizontal 0.05
2 Density of Water 1.00 T/M3 EQ Coefficient Vertical 0.03
3 Density of Concrete 2.30 T/M3
4 Density of Masonry 2.40 T/M3
5 Dry Density of Soil 1.53 T/M3 9.20
6 Moist Density of Soil 1.67 T/M3 0.90 8.00 8.00
7 Saturat Density of Soil 1.94 T/M3 Ep3
8 Submerg Density of Soil 0.94 T/M3
9 Silt Factor 1.00 T/M3
W1 0.60
. 1.00
4.30 6.00 bed W3 3.10
1.10 Ep2 5.20 Ep1
4.90 W2 4.90 4.90
0.56 1.58
(1/3XwXh) 2.60 (1/3XwXh)

Particulars Force Crushing


Force Lever Moment Z= B/3 &
Vertical Horizont Chek Sliding chek
sign No. L B Density arm (M) M/W 2B/3
(W) (H) e = Z-B/2
W1 1 0.90 4.00 2.30 8.280 0.450 3.726 B/3 e= Friction Coefficient=
W2 1 2.60 0.30 2.30 1.794 1.300 2.332 = 0.289 H/W
W3 0.5 1.70 2.80 2.30 5.474 1.461 7.998 0.867 So 6e = 0.110
Ep2 0.5 0.56 1.10 1.67 0.309 0.367 0.113 2B/3 1.733 0.1097<0.667
1.011
Ep1 0.5 1.58 3.10 1.67 -2.451 1.033 -2.532 = Pmax & min.
Ep3 0.5 1.70 2.80 1.67 3.975 2.039 8.104 1.733 12.513 Hence
We2 0.5 0.48 0.80 1.00 0.000 2.440 0.000 Hence 2.504
19.523 -2.142 19.741 OK OK OK
STABILITY CALCULATION OF SIDE WALL @ HFL CONDITION

Section at X-X
1 SBC 20.00 T/M3 7 Saturat Density of Soil 1.94 T/M3
2 Density of Water 1.00 T/M3 8 Submerg Density of Soil 0.94 T/M3
3 Density of Concrete 2.30 T/M3 9 Silt Factor 1.00 T/M3
4 Density of Masonry 2.40 T/M3 10 EQ Coefficient Horizontal 0.05
5 Dry Density of Soil 1.53 T/M3 11 EQ Coefficient Vertical 0.03
6 Moist Density of Soil 1.67 T/M3

9.20
8.00 0.90 8.00
Ep3

2.00
We W1 0.60 3.10
4.30 6.00 bed 1.00
Ep2 2.00 W3
1.10 5.20 Ep1
4.90 W2 Fdn. 4.90
-0.33 1.73
(1/3XwXh) 2.60 (1/3XwXh)
2.60
U100
2.00

Particulars Force
Crushing
Force Lever Moment Z= B/3 &
Vertical Horizont Chek Sliding chek
sign No. L B Density arm (M) M/W 2B/3
(W) (H) e = Z-B/2
W1 1 0.9 4 2.3 8.28 0 0.450 3.726 B/3 e= Friction Coefficient=
W2 1 2.6 0.3 2.3 1.794 0 1.300 2.332 = 0.253 H/W
W3 0.5 1.7 2.8 2.3 5.474 0 1.461 7.998 0.867 So 6e = 0.049
Ep1 0.5 1.73 3.10 1.94 0 -2.675 1.033 -2.764 2B/3 1.520 0.0489<0.667
Ep2 0.5 -0.33 1.10 1.94 0 -0.184 0.367 -0.067 1.05 = Pmax.& min.
Ep3 0.5 1.70 2.80 1.94 4.6172 0 2.039 9.414 1.733 10.705 Hence
We 0.5 2.00 2.00 1.00 0 2.000 0.667 0.000 Hence 2.807
U100 0.5 2.00 2.60 1.00 -2.600 0.867 -2.253
17.565 -0.858 18.386 OK OK OK
STABILITY CALCULATION OF ABUTMENT @ EMPTY CONDITION WITH EQ
Section at X-X
1 SBC 20.00 T/M3 7 Saturat Density of Soil 1.94 T/M3
2 Density of Water 1.00 T/M3 8 Submerg Density of Soil 0.94 T/M3
3 Density of Concrete 2.30 T/M3 9 Silt Factor 1.00 T/M3
4 Density of Masonry 2.40 T/M3 10 EQ Coefficient Horizontal 0.05
5 Dry Density of Soil 1.53 T/M3 11 EQ Coefficient Vertical 0.03
6 Moist Density of Soil 1.67 T/M3

9.20
0.90 8.00 8.00
Ep3

W1 0.6
1.00
6.00 6.00 bed W3 Ep1
1.10 Ep2 PCC 5.20
4.90 W2 Fdn. 4.90
0.56 1.58
(1/3XwXh) 2.60 (1/3XwXh)
Particulars Force
Force Lever Moment
Vertical Horizont
sign No. L B Density arm (M)
(W) (H)
W1 1 0.9 4 2.3 8.280 0.000 0.450 3.726
W2 1 2.6 0.3 2.3 1.794 0.000 1.300 2.332
W3 0.5 1.7 2.8 2.3 5.474 0.000 1.461 7.998
Ep2 0.5 0.56 1.1 1.67 0.000 0.309 0.367 0.113
Ep1 0.5 1.58 3.1 1.67 0.000 -2.451 1.033 -2.532
EP3 0.5 1.70 2.80 1.67 3.975 0.000 2.039 8.104
We2 0 0 0 1 0.000 0.000 0.000 0.000
19.523 -2.142 19.741
EQ EFFECT VERTICAL & HORIZONTAL
Net Force EQ Coef. Force Moment (M) Crushing
Force Lever Z= B/3 &
sign
Check Sliding check
arm M/W 2B/3
Vertical Horizontal Vertical Horizontal Vertical Horizontal Vertical Horizontal e = Z-B/2
W1 8.280 0.000 0.03 0.05 0.248 0.414 0.450 0.112 0.186 B/3 e= Friction Coefficient=
W2 1.794 0.000 0.03 0.05 0.054 0.090 1.300 0.070 0.117 = 0.237 H/W
W3 5.474 0.000 0.03 0.05 0.164 0.274 1.461 0.240 0.400 0.867 So 6e = 0.063
Ep2 0.000 0.309 0.03 0.05 0.009 0.015 0.367 0.003 0.006 2B/3 1.419 0.063<0.667
1.063
Ep1 0.000 -2.451 0.03 0.05 0.074 -0.123 1.033 0.076 -0.127 = Pmax.&min.
Ep3 3.975 0.000 0.03 0.05 0.119 0.199 2.039 0.243 0.405 1.733 12.005 Hence
We2 0.000 0.000 0.03 0.05 0.000 0.000 0.000 0.000 0.000 Hence 3.526
0.668 0.869 0.744 0.987 OK OK OK
TOTAL 20.191 -1.273 21.472