FOOTING ESTIMATE

TOP BARS SPACING


LENGTH WIDTH THICKNESS VOLUME
L
3.5 2 0.8 5.6 0.15

CEMENT 68 BAGS
SAND 2.8 CU.M.
GRAVEL 5.6 CU.M.

20MM DIA RSB 37 PCS


GI TIE WIRE 5 KGS

PEDESTAL COLUMN ESTIMATE

BREADTH WIDTH QTY D BASEMENT TO TOP OF PEDESTAL HEIGHT


0.5 0.5 2 1.6 1

CEMENT 16 BAGS
SAND 0.65 CU.M.
GRAVEL 1.3 CU.M.

20MM DIA RSB 16 PCS


10MM DIA RSB 49 PCS
GI TIE WIRE 9 KGS
S SPACING BOT BARS SPACING
S L S
0.15 0.15 0.15

VOLUME LONG. BARS QTY QTY OF STIRRUPS LENGTH OF STIRRUPS


1.3 16 28 5.25

84
3.45
6.9
0
53
49
14
BILL OF QUANTITIES

UNIT COST TOTAL COST


ITEM PARTICULARS QTY UNIT
MATERIALS LABOR MATERIALS
1 GENERAL REQUIREMENTS
MOB/DEMOB 1 lot 7000
SAFETY REQUIREMENTS 1 lot 3000
2 CONCRETING WORKS
CEMENT 84 BAGS 255 102 21420
SAND 3.45 CU.M. 2400 960 8280
GRAVEL 6.9 CU.M. 1500 600 10350
20MM DIA RSB 53 PCS 650 260 34450
10MM RSB 49 PCS 145 58 7105
GI TIE WIRE 5 KGS 75 30 375

TOTAL PROJECT COST


MATERIALS
LABOR
GRAND TOTA
TOTAL COST GRAND
LABOR TOTAL

7000 7000
3000 3000

8568 29988
3312 11592
4140 14490
13780 48230
2842 9947
150 525

OTAL PROJECT COST


81980
42792
124772