FRUIT REICEVING 07-25-2018

APPROVED BY: PLOT SCALE: NTS A3 PROPOSED PROJECT: NO DEVIATION FROM PRINT WITHOUT APPROVAL OF SHEET CONTENTS REVISIONS SHEET 1 of 1

Philippines, Inc. VLADEMIR R. ORBESIDO DATE: 05/18/2018 R


Philippines, Inc. DESIGN DEPARTMENT. No.
1
DATE
--/--/---- -
PROJECT ENGINEER
-
REMARKS

FRUIT RECIEVING AREA 1


R

ENGINEER DRAWN: RG SUBILLAGA


2 --/--/---- - -

ENGINEERING SERVICES DIVISION OWNER THIS DRAWING IN DESIGN AND DETAIL IS THE
3 --/--/---- - -
PROPERTY OF DOLE PHILIPPINES , INC. AND MUST
PROCESS & FACILITIES ENGINEERING DEPT. REG. NO.: 0104770 TIN: 930-462-428 CHECKED: EB CASEDO
(SCHEME 03) NOT BE USED EXCEPT IN CONNECTION WITH
WORK ASSIGNED BY DOLE PHILIPPINES, INC.
4

5
--/--/----

--/--/----
-

-
-

- A 1
CIVIL / MECHANICAL/ ELECTRICAL/ PTR NO.: 7795763 DATE: January 23, 2018 APPROVED: VR ORBESIDO RESERVES ALL RIGHTS OF DESIGN OR INVENTION. 6 --/--/---- - -

7 --/--/---- - -
GEODETIC/ MASTER PLUMBER PLACE: General Santos City SAFETY DIR.: PJD MAYOL LOCATION: DOLE COMPOUND, CANNERY SITE, POLOMOLOK, SOUTH COTABATO VLADEMIR R. ORBESIDO RENATO N. ALVAREZ 8 --/--/---- - - DFL-DPO-SED-MOL-0010-M