Prepare Marshall Mix Design for asphalt mix confirming the following gradation:
Sieve Size 1 inch ¾ inch 3/8 inch #4 #8 #50 #200 pan
% Passing 100 90-100 56-70 35-50 23-35 5-12 2-8 -

Objective:
The main objective of this CEP is to guide the students about the Marshall Mix
Design to choose the best compatible amount of aggregates and bitumen for Hot Mix
Asphalt.

Activities:
Main activities of the problem are:-
 Aggregate sample collection from Malakand quarry of KP
 Carrying out Mix design Calculations
 Laboratory analysis of the sample
 Proposing final aggregate blend and optimum bitumen content
 Submission of the final report

Complex Problem Attributes:


Reference to PEC Manual Annexure A
 K5: Knowledge that supports engineering design in a practice area
 K6: Knowledge of engineering practice (Technology) in the practice area in
engineering discipline
 K7: Comprehension of the role of engineering in society and identified
issues in engineering practice in the discipline: ethics and the professional
responsibility of an engineer to public safety; the impacts of engineering
activity: economic, social, cultural, environmental and sustainability.