Professional Documents
Culture Documents
Piping Isometric - 7
Piping Isometric - 7
Piping Isometric - 7
MATERIAL LIST
PART No. COMPONENT DESCRIPTION N.S. (IN) SCHED RATING END PREP. QTY DET-UNIQUE/CLIENT CODE
PIPE
1 PIPE, CS ASTM A106 GR B SCH=S-80 , 1.1/2 S-80 PE 10.1 M PIP-541SAF0004
01.50
FITTINGS
2 REDUCING TEE, CS ASTM A105N SCH=NREQD 1.1/2X3/4 NREQD 3000 SWE 1 RTEEH-551FAB0008
A SCH=NREQD, 01.50 x 00.75 A
3 90 DEG ELBOW, CS ASTM A105N SCH=NREQD, 1.1/2 3000 SWE 4 90E-551HAB0003
4
01.50
SEAL WELD PLUG/CAP AFTER HYDROTEST
4 PLUG, CS ASTM A105N SCH=NREQD, 00.75 3/4 NREQD MTE 1 EHP-551HAB0031
1
3
30 3
EL +33724
38
0
38
0 1
2
1.1/2X3/4"NPD
B B
772
80
63
1
1.1/2"NPD
1.5"-CW-A31-1B-281307/10-WET
1
22
300
07
D D
3
EL +33424
E E
NOTES:
F 1. FOR PIPE SUPPORT STANDARD REFER TO WOOD DOC.NO.: 2300-8230-SP-000-0023. F
ALL MATERIAL REQUIRED TO FABRICATE PIPE SUPPORTS SHALL BE SUPPLIED BY THE MECHANICAL CONTRACTOR EXCEPT FOR PIPE TRUNNIONS AND WHERE NOTED.
2. ALL FLANGE BOLT HOLES SHALL STRADDLE CENTRE LINES UNLESS INDICATED OTHERWISE.
3. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE TO FACE OF FLANGE OR CENTRE LINE OF PIPE. DIMENSIONS ARE IN MILLIMETRES.
4. FIELD WELDS (FW) AND FIELD FIT WELDS (FFW) HAVE BEEN SHOWN ON THE ISOMETRIC TO GIVE GUIDANCE TO THE CONTRACTOR
THE CONTRACTOR SHOULD CONFIRM THE POSITION OF FFWs DURING CONSTRUCTION TO SUIT SPOOLING AND ERECTION
AN ADDITIONAL PIPE LENGTH OF 150mm HAS BEEN INCLUDED IN THE BILL OF MATERIALS WHERE FFWs ARE SPECIFIED. S1 24/11/22 ISSUED FOR CONSTRUCTION s.arumugam3 v.subramanian kannan.palaniyandi sriramana.palla2
- s.abhayankaran