SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET

Index no. Page 1 of 7


Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

1. MECHANICAL CHECK & VISUAL INSPECTION:


ITEM DESCRIPTION CHECKED
1. Inspect for physical damage / defects. OK
2. Check tightness of all connections. OK

2.ELECTRICAL TESTS
2.1 Function Test
ITEM DESCRIPTION CHECKED
1. Test switch/plug checked for correct function. OK
2. Case earthing checked. OK
3 Indications checked. OK
4 Alarm LED checked. OK
5 Trip contacts checked. OK

3. ELECTRICAL TEST:
3.1 CURRENT MEASUREMENT:
CT ratio: 600/5
Applied Expected Displayed Primary Value (A)
Current Value R Y B
(A) (A)
1.25 150 150 149 149
2.50 300 299 299 298
3.75 450 449 448 450
5.00 600 600 598 598
Limit: ± 0 – 5 %

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 2 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

3.2 VOLTAGE MEASUREMENT:


VT ratio: 13.8kV/110V
Applied Expected Displayed Primary Value (kV)
Voltage Value R Y B
(V) (kV)
15.88 3.45 3.44 3.44 3.44
31.75 6.90 6.88 6.88 6.88
47.63 10.35 10.3 10.3 10.3
63.51 13.80 13.7 13.7 13.7
Limit: ± 0 – 5 %

4. PHASE OVERCURRENT

1A. IDMT PHASE OVER CURRENT:


In=5A Threshold = 780.0 A (6.5 A in sec) Curve = IAC Inverse Delay = 0.12s
Type = TMS
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 780 A /(600/5)
= 6.50 A
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 600 A /(600/5)
= 5.0 A

Setting Injected Expected tripping time (sec) Actual tripping time (sec)
Current Current Remarks
R Y B R Y B

6.5 A (6.5*2)= 0.3029 0.3029 0.3029 0.305 0.305 0.3045 OK


13.0A
6.5 A (6.5*3)= 0.215 0.215 0.215 0.216 0.218 0.218 OK
19.5A

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 3 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

FORMULA:

For TMS type T/β = TMS (given delay time)


EXAMPLE:
t(d) = [0.208+0.863/(13/6.5-0.8)+(-0.418)/(13/6.5-0.8) ^2+0.195/(13/6.5-0.8) ^3]*(0.12/.297)
= [0.208+0.719-0.290+0.112]*0.404
= 0.749*0.4
= 0.3029 Sec

2A. DEFINITE PHASE OVER CURRENT:


In=5A Threshold = 7.80kA (65.0 A in Sec) Curve = Definite Delay = 320ms
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 7.80 kA /(600/5)
= 65.0 A
NOTE : For testing purpose Current threshold is reduced and tested with 1000A (8.33A in Sec)
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 1000 A /(600/5)
= 8.33 A

PICK UP CURRENT:

Setting Pick up Current (A) Drop off Current (A)


Current Remarks
R Y B R Y B

8.33A 8.28 8.29 8.28 7.88 7.87 7.87 OK

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 4 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

TRIP TIMING:
Injected 8.40 A in Sec
Injected Expected tripping time (sec) Actual tripping time (sec)
Current Remarks
R Y B R Y B

8.50A 0.320 0.320 0.320 0.332 0.331 0.332 OK

5. EARTHFAULT

1A. IDMT EARTH FAULT:


In=5A Threshold = 60.0 A (0.5 A in sec) Curve = SIT Delay = 0.44s
Type = TMS
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 60 A /(600/5)
= 0.50 A

Setting Injected Expected tripping time (sec) Actual tripping time (sec)
Current Current Remarks
R Y B R Y B

0.50A (0.5*2)= 4.412 4.412 4.412 4.426 4.425 4.426 OK


1.0A
0.50A (0.5*3)= 2.772 2.772 2.772 2.774 2.776 2.774 OK
1.5A
FORMULA:

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 5 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

EXAMPLE:
t(d) = 0.440*0.140/((1.0/0.5)^0.02 – 1)
= 0.0616/0.01395
= 4.4127 Sec

2A. IDMT DEFINITE EARTH FAULT:


In=5A Threshold = 240.0 A (2.0 A in sec) Curve = Definite Delay = 100ms
VALUE IN SECONDARY = SET CURRENT/ CT RATIO
= 240 A /(600/5)
= 2.00 A

PICK UP CURRENT:

Setting Pick up Current (A) Drop off Current (A)


Current Remarks
R Y B R Y B

2.0A 1.97 1.99 1.98 1.85 1.85 1.87 OK

TRIP TIMING:
Injected 2.10 A in Sec
Injected Expected tripping time (sec) Actual tripping time (sec)
Current Remarks
R Y B R Y B

2.10A 0.100 0.100 0.100 0.114 0.112 0.114 OK

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 6 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

6. UNDER VOLTAGE

A. DEFINITE UNDER VOLTAGE:


Threshold = 75% of 110 (82.5V in Sec) Curve = Definite Delay = 3.0s
NOTE: Voltage applied by √3 conversion = 82.5/√3
= 47.63
PICK UP VOLTAGE:

Setting Pick up Voltage (V) Drop off Voltage (V)


Voltage Remarks
RY YB BR RY YB BR

47.63V 47.70 47.60 47.70 49.10 49.00 49.10 OK

TRIP TIMING:
Injected 45V in Sec
Injected Expected tripping time (sec) Actual tripping time (sec)
Voltage Remarks
RY YB BR RY YB BR

45.0V 3.00 3.00 3.00 3.01 3.01 3.01 OK

7. OVER VOLTAGE

A. OVERVOLTAGE :
Threshold = 110.0 % Un Delay = 3.0s
NOTE: Voltage applied by √3 conversion = 121/√3
= 69.86

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature
SWG PERVENTIVE MAINTENANCE RCM FORM – DATA SHEET
Index no. Page 7 of 7
Area S.O.A Power Plant TIHAMA P/P Substation GT#10
Feeder No. HA01 Unit10 Incomer Equipment 13.8kV Manufacturer Merlin Gerin
Model SEPAM S40 Serial No 0250442 Aux dc 24-250 Vdc
Doc. safety type PTW Doc. Safety No 250002704894 Date 04/MAR/2024

PICK UP VOLTAGE:

Setting Pick up Voltage (V) Drop off Voltage (V)


Voltage Remarks
RY YB BR RY YB BR

69.86V 69.96 69.96 69.96 67.90 67.88 67.91 OK


Note: For Over voltage Led indication obtained after 3 sec.

ALL SETTING ARE IN PRIMARY, FOR TESTING CALCULATED IN SECONDRY VALUES.

8. TEST EQUIPMENT
EQUIPMENT MODEL SERIAL NUMBER CALIBRATION DUE
FREJA FREJA 1402737 02/07/2024

Tested By Witness By Approved By TSD


Name Engr. Asgher Ullah Shah Engr. Ahmed Al-Kanani
Signature