Adjust PCC Valve: 5/32" allen wrench LC5----Logic Cartridge for TW

Accumulators------psi-----Port
system 800 SA 9/16" open-ended wrench CV5---Anti-Cavitation Valve for TW
counterbalance 900 CB CV4---Pilot Control Check Valve for IBOP
System Fault----software issue
time-delay 800 C4 CDR---Check Valve Drain Line
Bus Fault---------hardware issue PC1---Press. Reducing Valve Brakes (1400psi)
RV2---Relief V. for Fixed Displacement Pump (set 400psi)
PCC---Press. Control (relief for counterbalance 1600psi)
T1
B1 B2 C5
RV1---Main Sys. Press. Relief V. (set at 2200psi)
T1
Shot Pin- RV1 PCC RV2 PC1 CV1---Flow Control Main Sys. Press
LC5 LA6 LB6
B5 - Pin stall out at CDR A2/B2---Test pt. for Rotation Motor
B2

400psi, adjust AR5


CV1
RV1- PC1- to
A2 CV4
LA6/LB6---Logic Control Cart. for Link Tilt Return Line
adjust brakes
2200psi
to 1500psi
CV5 CA5 CB5
CA6/CB6---Anti-Cavitation Cart. for Link Tilt
to 1000psi
CB---Test pt. for Counterbalance (1600psi-ish)
PF and RV2-
when setting
PV---Test pt. for Variable Pump (set at 2200psi)
pump pressure
to 400psi
SJR---Standjump Press. Relief V. (appx. 190psi)
B4- at system P1---Test pt. Break Press. Line (set 1400psi)
pressure when
IBOP actuated
Link Tilt: C1 & C2
*2000psi - stroking PC4---Press. Reducing V. IBOP (set 500psi)
*1500psi - holding
A4---Test pt. IBOP Open Funct. (set at 500psi)
PC5---TW Anti-Cavitation V.
AR5---Press. Reducing V. (1000psi)
G5---Test pt. TW Open Funct. (show 500psi)
CTF A6---Test pt. Mousehole Pilot Line to Close Logic V.
PV PF
DF B6---Test pt. Pilot Line for Drill Down to Close Log. V.
XC
B5---Test pt. Shot Pin (400psi)
UV1-
2000psi UV1 P5
G5
B6
C5---Test pt. Pilot to Open Check V. TW operation
unload
pressure SV1
C4
B4---Test pt. IBOP Closed (sys. press.)
B8
see-saw SA
CB PF G5 C4---Test pt. IBOP Accum (2000psi decaying press.)
SA-
CV2 B1 B4 E5
E6
CDF
B1---Test pt. Brake Close Press. (shows 1400psi)
2000psi
will decay
T1 B9---Test pt. Standjump Press. Relief V. (show 190psi)
until UV1
reloads
CTR TR A5
TF
Z1---Test pt. Unloading Valve (2000psi)
C5 B5

P
Z1 B9 DR B4 B5 B6 CV2---Check V. Counterbalance
B9- B1- with brakes
PF---Test pt. Fixed Displacement Pump (set up 400psi)
B5-
190psi on, 1500psi.
adjust with PC1
extends shot pin B8---Test pt. Pilot Press. Link Tilt Float
flow valve
CDF---Check V. on Counterbalance
CTF---Check V. on Counterbalance
A4- system AR5- 1000psi, will
CTR---30psi Check V. Return Line
pressure unlock torque wrench UV1---Unloading V. Variable Pump (set 2000psi)
when IBOP on CR manifold
actuated P---Test pt. Main Sys. Press. (2000psi)
SJR- SA---Test pt. System Accum (sys. press.)
Standjump
adjustment
D4
AR5
PC4 PC5
D1
P1
PF A4 A8
CV3 A5
CB- 1600psi for PV C4 D5
counterbalance SJR
G5 DF
pressure CB

A5- Flow Control


valve: holds shot pin
(ball valve)