Professional Documents
Culture Documents
Manifold Layout With Colors
Manifold Layout With Colors
Accumulators------psi-----Port
system 800 SA 9/16" open-ended wrench CV5---Anti-Cavitation Valve for TW
counterbalance 900 CB CV4---Pilot Control Check Valve for IBOP
System Fault----software issue
time-delay 800 C4 CDR---Check Valve Drain Line
Bus Fault---------hardware issue PC1---Press. Reducing Valve Brakes (1400psi)
RV2---Relief V. for Fixed Displacement Pump (set 400psi)
PCC---Press. Control (relief for counterbalance 1600psi)
T1
B1 B2 C5
RV1---Main Sys. Press. Relief V. (set at 2200psi)
T1
Shot Pin- RV1 PCC RV2 PC1 CV1---Flow Control Main Sys. Press
LC5 LA6 LB6
B5 - Pin stall out at CDR A2/B2---Test pt. for Rotation Motor
B2
P
Z1 B9 DR B4 B5 B6 CV2---Check V. Counterbalance
B9- B1- with brakes
PF---Test pt. Fixed Displacement Pump (set up 400psi)
B5-
190psi on, 1500psi.
adjust with PC1
extends shot pin B8---Test pt. Pilot Press. Link Tilt Float
flow valve
CDF---Check V. on Counterbalance
CTF---Check V. on Counterbalance
A4- system AR5- 1000psi, will
CTR---30psi Check V. Return Line
pressure unlock torque wrench UV1---Unloading V. Variable Pump (set 2000psi)
when IBOP on CR manifold
actuated P---Test pt. Main Sys. Press. (2000psi)
SJR- SA---Test pt. System Accum (sys. press.)
Standjump
adjustment
D4
AR5
PC4 PC5
D1
P1
PF A4 A8
CV3 A5
CB- 1600psi for PV C4 D5
counterbalance SJR
G5 DF
pressure CB