Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

MUHAMMAD RAFEQ BIN KHALID

PERSONAL DETAILS
Age : 34 years old
Date of Birth : 15th May 1989
Nationality : Malaysian
Race : Malay
Gender : Male
017-6919783
Marital Status : Single
Identity Card Number : 890515-01-5533
Height/ Weight : 164 cm / 70 kg
rafeqkhalid89@gmail.com Personalities : Friendly, patient, punctual and committed

PROFESSIONAL PROFILES
Mtk 105 km9 Kampung
Rawang 84400 Sungai
Mati Ledang • Highly flexible and adaptable performer; adapt at multi-
Johor tasking and
thriving in a fast-paced environment while coordinating
numerous
time-sensitive projects.

Autocad
Microsoft Office
• Able to work independently and in a team.
Leveling • Exceptional motivated self-starter and creative problem-
T.com solver who
Proses Data Survey
Pailing Point work hard and loves a challenge
Seting Out Point
• Proven relationship-builder with exceptional
interpersonal,
communication, and presentation skills.

• Have an ability to work under pressures.


Able to prepare good reports and presentation
English
B.Melayu
50%
100%
• Able to work overtime

• Able to attend any job training provided by company


EDUCATION

BI LEVEL SCHOOL/ YEAR


L INSTITUTION

1 DIPLOMA UKUR POLITEKNIK 2012


TANAH MERLIMAU
MELAKA
2 SIJIL UKUR POLITEKNIK 2007-2010
TANAH MERLIMAU
MELAKA

3 SIJIL PELAJARAN SMJK PEI HWA 2005-2006


MALAYSIA
(SPM)

4 PENILAYAN SMJK PEI HWA 2002-2004


MENENGAH R
DrENDAH(PMR)

5 UJIAN SK RAWANG 2001-1995


PENILAYAN
SEKOLAH
RENDAH(UPSR)

WORKING EXPERIENCE

COMPANY ADDRESS POSITION YEAR WORKING PROJECT


SITE DESCRIPTION
JURUKUR Berhadapa LAND 01/07/2010 • Istana • Performing
MANSOR n pasar SURVEYOR Negara cadastral tasks
DAN besar 01/07/2011 jalan duta such as finding a
ROSLAN kelang stone
SDN.BHD • Perindustr
selangor
ian • Prepare survey
cyberjaya as-built drawing,
dan lain- record survey
related data
lain
•Carry out land
subdivision work
IBS & No.32-1 LAND 01/01/2011 • Menara • Work
LYNN jalan TMS SURVEYOR LGB(TTDI) constructions
SERVICES 1 taman 21/06/2011 transfer
tanjung
leveling by
minyak
every level
Setia,7525
0 Melaka. • Prepare
survey as-built
drawing,
record survey
related data

Entegeretat No.87l,jala LAND 01/01/2013 • •


engenering n • Highway Work
SURVEYOR constructions
sServis TU3,Taman 26/01/2015 plus Sungai
Buloh transfer
Tasik
leveling for
Utama,Aye • Highway cut and pile
r plus Sungai
Keroh,754 • Find the
Pertani right position
50
Melaka. • Highway road width
plus • Prepare
pendang survey as-built
• Highway drawing,
plus alor record survey
star related

• Perumahan
Taman 1
krubung

SENTORIA No B3, LAND 05/02/2015 • Desa • Responsible in


BINA Tingkat 1, SURVEYOR preparation of
Hijauan
SDN.BHD Jalan GD, 08/01/2020 daily and weekly
Taman • Bukit
work plan for
Gambang Gambang workers
Waterpark
Damai, • Responsible for
26300 • Global any minor
Gambang heritage villa problem at
Pahang project site
• Bukit
Gambang • Provides and
Resort City maintain after
Kuantan Project
worksheet
Report on
monthly basis.

Sound Ptd 1495 Land 3/7/2023 Projek logi air -Gread line
EVEREMENT Tiang no surveyur hingga kini kampung -Seting out
Sdn bhd jtk tengah segamat -Bondery
195 jalan -Level
tanjung
kupang
81550
gelang
patah
johor

You might also like