1.0 PURPOSE

The purpose is to define and establish the method of statement for concrete surface drain

2.0 SCOPE

To provide clear instruction on concrete surface drain

3.0 REFERENCES

P02-03 Preparation of Method of Statement


JKR Standard Specification for Road Works.

4.0 DEFINITION

- NIL -

5.0 RESPONSIBILITIES

5.1 Project Manager

 Ensure that method statement comply with client requirement


 Submit method statement to client / SO for approval
 Monitor implementation of this method statemant and ensure the works are carried out
with accordance to JKR specification.
 Co-ordination of testing with consultant (if required)

6.0 MATERIALS

 Sand
 Cement
 BRC
 Water
 Timber Frame

7.0 EQUIPMENTS

 Backhoe
 Concrete Mixer
 Wheel barrow

Version 1.A 30-March-01 Page 1 of 2


S_03 ECET-04
CONCRETE SURFACE DRAIN

8.0 SAFETY CONDITIONS

Refer to Safety Booklet.

9.0 ACTIVITY PROCESS

9.1 Set outline and excavation


9.2 Check flow gradient and level before installation of timber frame
9.3 Place the concrete
9.4 Carry out final inspection

10.0 QUALITY RECORDS

 Daily request
 Lab records
 Survey Records
 Quality Verification Checklist (QVC)

Version 1.A 30-March-01 Page 2 of 2