Professional Documents
Culture Documents
CV Billy Fernando Silangit ATS
CV Billy Fernando Silangit ATS
EXPERIENCE SKILLS
● GPA: 3.15
PT. Indah Kiat Pulp & Paper (APP Sinarmas)
● Project Thesis :
Production Foreman & Quality Control Technician Planning Preventive
July 2018 – August 2020 (Production Foreman) Maintenance Based On
August 2020 – October 2021 (Quality Control Technician) Six Sigma Method To
Minimize Product
● Production Foreman : Take Steps To Solve Problem In The Workplace, Reject
Determine Quickly & Responsively To Problems Both In Production Machine,
Production Process, & Personal Internal Problems Of Subordinates. CERTIFICATE
● Quality Control Technician : Plan, Coordinate, & Monitoring All Quality Control
Activities During Production, Both The Raw Material Used, The Work Processes ● Training Auto Cad
Carried Out, As Well As Output Of Each Sub-Process To Ensure The Consistency (2013)
Of Product Quality Produces According To Predetermined Standard. ● Proficiency In English
(2016)
● TOEFL (2016)
PROJECT BACKGROUND ANALYSIS IMPROVEMENT ACTIVITY
Disposal Can’t Achieve Target (0,75%) Item : Machine (Die) Item : Man ITEM : MACHINE (PLANNING PREVENTIVE POLISH DIE)
IDEAL Preventive Polish Ideal 3,13 – 3,55 Hour
DISPOSAL THERMOSETTING
Why 1 : Burr Always Stick To The Die Why 1 : Lack Abnormality Handling PREVENTIVE POLISH DIE AFTER
DEC 22 – MAR 23 150 20%
Why 2 : The Gas Trap In Area Insert Why 2 : No Information From 18%
Number Of Events
8.000 4,00% Operator 16% 15%
100 14%
Ratio
6.000 3,00% Why 3 : Insert Core Worn Out
2,86% 2,89% Why 3 : Lack Of Awareness 9% 9% 10%
2,54% 8% 8% 7% 7%
2,41% 50
4.000 2,00% 5%
Why 4 : No Procedur Maintenance 3%
Why 4 : Operator Low Skill
2.000 1,00% 0 0%
0,75% 0,75% 0,75% 0,75% 29 - 95 - 155 - 218 - 281 - 344 - 407 - 470 - 533 - 596 -
Why 5 : Operator Doesn’t Not Know
Why 5 : No Training About 91 154 217 280 343 406 469 532 595 658
- 0,00% So What Can Be Done is Polish Die
Dec 22 Jan 23 Feb 23 Mar 23 Abnormality Handling To Operator Interval Shot Of Events
Why 6 : No Planning Maintenance
Disposal Target Actual Schedulling Why 6 : WGS / OPL Incompleted
Highest Number Of Events On Shot 470 – 532
SS Type Biggest Ratio Of Product
Convert To Time (Hours)
Disposal ITEM : MAN
RATIO DISPOSAL CASE SS : Cycle Time / Shot : 24 sec
TRAINING TO OPERATOR STEP TO HANDLING ABNORMALITY
THERMOSETTING Preventive Polish Ideal :
SS Z VN L G7L LY 01 Take Product From Conveyor & Do Inspect Product By Bottom Limit = (24 x 470) : 3.600 = 3,13 Hour
26,20%
25,22%
22,69%
22,28%
21,47%
20,94%
20,64%
20,49%
19,57%
19,55%
18,26%
15,85%
14,39%
13,79%
13,72%
12,78%
RESULT OF IMPROVEMENT
10,76%
02
2,06%