14 - Vehicular Box Culvert
14 - Vehicular Box Culvert
1.0 PURPOSE
The purpose is to define and establish the method of statement for vehicular box culvert.
2.0 SCOPE
3.0 REFERENCES
4.0 DEFINITION
- NIL -
5.0 RESPONSIBILITIES
Monitor implementation of this method statement and ensure the works are carried out with
accordance to JKR specification.
Co-ordination of testing with consultant (if required)
6.0 MATERIALS
7.0 EQUIPMENTS
Excavator
Concrete Mixer / Mixer Truck
Bar Bending Machine
Compactor
Vibrators
9.2 Excavation of trench shall be carried out lines, level as specified and show in the drawings
9.4 Wall
9.8 Lap length for all reinforcement bars shall be minimum Ø 45mm of the smaller or same bars
9.10 Expansion joints shall be constructed at 12m c/c and close with sealant
9.11 Plastic joint sealing compound to seal at the joint as to protect joint filler
9.13 Backfill with sand or suitable material and compacted as per specification
Daily records
Lab records
Survey Record
Request For Inspection ( RFI )
Quality Verification Checklist (QVC)